Senior Surveyor
CurrentYanbu-Medina Water Transmission | SWCC |Pump St: 2, Tanks: 8, Pipeline len: 233km1• Tank Reservoir Station (medina)Implementing on Surveying procedure, ensuring standard of client and completion of work on given estimated time (verifying data, preparing reports and monitoring on-site). •Infrastructure: Station piping, trench, storm water line, sewage line, Portable water line, septic tanks, road, landscape, light-poles, powercables, firefighting lines, duct banks & u-hannel.•Tank: Ring foundation, sand-fill, tank bottom plate, tank annular plate, tank shell & steel erection, shell verticality & roundness, tank inlet, outlets & overflow, domeroof, including all geometry work 360֯֯.•Piping: Pipe installation & connecting to existing plant.