Self-directed and driven Civil Engineer with productive experience in infrastructure and road projects management (Airports, Metro, Local Roads, Drainage, Telecommunication, Landscape, External Works, Utility and Traffic Diversions/Management). Detail-oriented project engineering professional with a comprehensive background leading innovation in managing small-scale through to large-scale construction projects in a safe, timely and sustainable manner, leveraging knowledge of engineering principles, theories, specifications, and standards to achieve mutual beneficial results. Relentless focus on structural concept generation, project viability, and iterative prototyping resulting in strategic initiatives that significantly increase consistent quality project delivery. Led cross-functional teams and project operations to exceed project goals. Recognized as a highly organized, creative problem solver who excels at transforming technical blueprint into viable, durable, and worthwhile construction project. Intellectually competent with ability to deliver project with accuracy at budget schedule, utilizing advance planning to meet desired goal and objectives, strong assertiveness in driving ideas forward and taking the lead where required also charged with great sense of creativity to seek variety and think at a conceptual level.-Specialties:Mathematical and Technical Visualization, Strategic Decision-Making, Project Management & Execution, Field Inspection &, Technical Analysis, Team Collaboration, Procedures Implementation, Trans-formative Leadership, Quality Assurance, Continuous Improvement, Root Cause Failure Analysis, Process Engineering, Quality Control Management, Preventive Maintenance , Strategic Planning, Operations Optimization, Cross-functional Collaboration, Strategy Development, SAP, Predictive Analysis, Budget Administration, Asset Integrity/Reliability.
-
Project EngineerCpb Contractors Dec 2022 - Jul 2024AustraliaThe West Gate Tunnel Project comprises various works including an upgrade of the West Gate Freeway and the construction of a new road and tunnel connecting the West Gate Freeway with the Port of Melbourne, CityLink and the CBD.The upgraded West Gate Freeway and new road and tunnel, including the new CBD connections, will form the ongoing Western Distributor. The Western Distributor will also include construction of a new city bypass between Dynon Road and Flinders Street, incorporating a widening of Wurundjeri Way.The work sites for the new tunnels Southern Outbound Portals are located:Southern Outbound Tunnel Portal site located adjacent to the west bound lanes of the West Gate Freeway, just west of the Newport Rail Line and accessed via Kyle Road, Altona North, that will become the western exit for the Outbound tunnelThe Works includes the construction of South Portal Outbound Permanent Walls, Stitches, deck Overlay and block works between CH50850 – 50900 (North & South Walls) various width from 800mm to 1500mm thick walls up to 25m height. -
Construction ManagerMuhibbah Engineering Middle East Llc Nov 2017 - Oct 2022Doha, QatarManateq (The Employer) is commissioning the construction of QEZ-3, Development is divided into three main land Phase 1, 2, 3. The scope of work under the contract of construction of roads and infrastructure including 12 no’s Substation for 11kv power supply, 80 open plots to construct warehouses, 7km micro tunneling work for foul sewer network, gas network, potable and fire water line, irrigation, telecommunications with 18km Roads. Area covered is approximately of 2.70km2 & Development of port facilities and water front -
Project EngineerAlysj Jv Jun 2013 - Nov 2017Doha, QatarProject: Underground Gold Line Metro Doha Client: Qatar Rail Consultant: Atkins Designation: Project Engineer The project include construction of a 23Km long underground tunnel with a diameter of 6.17 meter, as well as 10 underground stations (Top to down Method) with high-end architectural finishes, high technology automations, complex smoke exhaust system in case of fire in the stations, and state of the art MEP system. In addition, the project involved the construction of an underground depot with a total length of 650M and central cooling plant for three of the stations. The implementation of the extremely complex and demanding construction in the heart of Qatar capital required the simultaneous utilization of 6 tunnel boring machine (TBM).Tunnel boring machine was carried out on Karst limestone with voids or cavities, an advanced technology tracking system (BEAM) was applied on the TBMs’cutter head. The projects involved 108892 precast concrete elements for the lining of the tunnels, the excavation of 4.9 Million M3 at the stations, the incorporation of 1 Million M3 concrete, 171403 Tons of steel reinforcement as well as the large number of traffic detours and shift of existing live utilities network -
Project EngineerInfraroad Trading & Contracting Llc Jun 2010 - May 2013Doha, QatarProject: Jerry Al Samur Development Project Road & Infrastructure. Client: Manateq Consultant: Dorch Qatar Designation: Project Engineer This project is proposed facility being developed by National Logistics, task to support the 2022 FIFA world cup programmed requirements. It is located approximately 20Km north-west of central Doha within Umm Salal Municipality, on an undeveloped site 747575 sq. m. (74.8ha) in area. From this 38ha is identified for warehousing, roads and infrastructure. The scope of works are all dry utilities, wet utilities, roads, and substations. -
Site EngineerDutco Balfour Beatty Aug 2006 - May 2010Dubai, United Arab EmiratesProject: Jumeriah Lake Towers interchange with roads, access arrangement to Midriff City Center (Bridge Construction) and Marina Bridge.Client: Roads Transport Authority Consultant: M/S Parsons International, Designation: Site Engineer This project is constructed part of expressway in the most traffic area on Sheikh Zayed Road, Dubai. 18 no’s bridges various web height with 4 cell, five major bridge crossing over Sheikh Zayed Road including stressing sequence and grouting to minimize the flow of traffic at Ibn Battuta Mall towards Abu Dhabi. In addition, constructions of 370m long 31.25m wide Marina Bridge crossing over Dubai Marina Canal. Bridge consists of six spans with five piers and two abutments. Bridge deck consists of six cell webs are post tensioned with 10 ducts and 37 strands. The web height varies from 2.5m to 5m.
Wasim K. Education Details
-
Uttar Pradesh Technical University1St -
Diploma Civil Engineering From M S University Of BarodaDiploma Civil Engineer
Frequently Asked Questions about Wasim K.
What is Wasim K.'s role at the current company?
Wasim K.'s current role is Construction Manager.
What schools did Wasim K. attend?
Wasim K. attended Uttar Pradesh Technical University, Diploma Civil Engineering From M S University Of Baroda.
Not the Wasim K. you were looking for?
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial