Assistant Resident Engineer (Tunnel)
CurrentCONSTRUCTION OF DOUBLE TRACK -RAILWAY TUNNEL BY NATM with BALLASTLESS TRACK IN PANVEL-KARJAT DOUBLE LINE SUBURBAN CORRIDOR OF MUMBAI DIVISION OF CENTRAL RAILWAYS WITH MRVCL. 1) TUNNEL LENGTH =3.1 km’s. 2) TUNNEL DIA. & HEIGHT= 14.50 mtr & 8.6mtr. 3) Cross sectional area of Tunnel =104.5 sqm