Stress Engineer
Excelnet Sdn Bhd (Subsidiary Of Ctrm)
Selangor, Malaysia
Worked on Nimrod MRA4 Sonobouy Rack (project with BAE Systems) from 2000 to 2002. Completed full D4/D5 loads and stress reports covering all joints, metallic fittings, rails, brackets, panels and tubes. Methods include FEM and hand calculations. In addition, worked on Nimrod MRA4 Airstairs (project with BAE Systems) “Aft/Fwd Gear-Boxes” and “Interface Components”. Completed full D4/D5 loads and stress reports covering all joints, bearings, metallic fittings, brackets, gear-box panels, gears and… Show more Worked on Nimrod MRA4 Sonobouy Rack (project with BAE Systems) from 2000 to 2002. Completed full D4/D5 loads and stress reports covering all joints, metallic fittings, rails, brackets, panels and tubes. Methods include FEM and hand calculations. In addition, worked on Nimrod MRA4 Airstairs (project with BAE Systems) “Aft/Fwd Gear-Boxes” and “Interface Components”. Completed full D4/D5 loads and stress reports covering all joints, bearings, metallic fittings, brackets, gear-box panels, gears and composite base plates. Methods mainly hand calculations.Also worked on Airbus A380 Fixed Leading Edge Lower Panels (project with Airbus UK) from 2002 to 2004. Involvement from B-Scheme (4 months stationed at AUK Filton facility) to C-Scheme, Post DFM and support for MSN001 and MSN007. Main support was on FEM of the composite sandwiched panels, buttstraps and attachments. Also performed preliminary hand calculations on the metallic refuel stiffened panel (during B-Scheme). Show less