Role
Senior Electrical Engineer
Location
Saudi Arabia
Company size

Who is Abdul Mohid Sheikh? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Abdul Mohid Sheikh is listed as Senior Electrical Engineer at Future Technologies for Water Desalination Company, a with 16 employees, based in Saudi Arabia. AeroLeads shows a matched LinkedIn profile for Abdul Mohid Sheikh.

Abdul Mohid Sheikh previously worked as Senior Electrical Engineer at Fichtner Consulting at Fichtner Consulting Engineers Ltd and Electrical Engineer at EGIS/PROJACS at Egis Consulting. Abdul Mohid Sheikh holds Bachelors Of Engineering, Nagpur University, Maharashtra, India, Power Electronics Engineering, First from Bapurao Deshmukh College Of Engineering, Nagpur University, Maharashtra, India.

Company email context

Email format at Future Technologies for Water Desalination Company

This section adds company-level context without repeating Abdul Mohid Sheikh's masked contact details.

Future Technologies for Water Desalination Company

Review company-level records connected to Abdul Mohid Sheikh before choosing the right outreach path.

Profile bio

About Abdul Mohid Sheikh

MAJOR PROJECTS UNDERTAKEN:•

Listed skills include Commissioning, Substation, Electrical Engineering, Engineering, and 15 others.

Current workplace

Abdul Mohid Sheikh's current company

Company context helps verify the profile and gives searchers a useful next step.

Future Technologies for Water Desalination Company
Future Technologies For Water Desalination Company
Senior Electrical Engineer
Saudi Arabia
Website
Employees
16
AeroLeads page
10 roles

Abdul Mohid Sheikh work experience

A career timeline built from the work history available for this profile.

Electrical Engineer At Egis/Projacs

Egis Consulting

Saudi Arabia

Jun 2020 - Feb 2022

Senior Electrical Engineer

Poyry Switzerland Limited

Shoaiba, Saudi Arabia

Saline Water Conversion Corporation of Saudi Arabia (SWCC) awarded the EPC contracts for Shoaiba RO Phase-4 desalination project on 28 March 2017G (26/01/1438H).Shoaiba RO Phase-4 desalination project shall be having the desalinated potable water producing capacity of 400,000 Cu. m/day (88MIGPD). The plant is designed to enable a safe, highly reliable, efficient and cost effective operation. The design of the plant is in accordance with good engineering practice based on applicable international standardsThe project had been in the pipeline for several years, but the location was switched at the last minute from Jeddah city to the coastal area of Shoaiba, 50 miles to the south. Shoaiba 4 is the first of many major Greenfield desalination projects which will be built following the reorganisation of the Kingdom’s water sector in 2016.Shoaiba 4 will meet the potable water requirements of Saudi Arabia's second largest city and its five million people. Using reverse osmosis membranes, Shoaiba 4 will process up to 400,000m3/d of sea water into fresh water.

Jan 2018 - Jun 2020

Project Engineer S/S

Saudi Technologists Consulting Engineers

Al Zulfi 380/132/33 Kv Bsp # 9064 , Unayzah 380/132/13.8Kv Bsp # 9059

Construction of 380/132/13.8kV BSP # 9059This project named as Qassim-5 (BSP # 9059), constructed in the Qassim area to meet the rapid growing demand and enhance the reliability and security of power supply. The BSP is connected to the 380 kV network by loop in & out the existing overhead transmission line between the existing Qassim-4 substation (9032) and the existing Qassim-2 substation (9025).Construction of new indoor type 380/132/13.8 KV GIS BSP named as Qassim-5 (BSP # 9059) including complete protection, metering, control, communication and SCADA equipment. The new Substation is equipped with Substation Automation System (SAS) and can be remotely controlled from the Energy Control Centre (ECC), through SCADA system, communication System and gateway. The monitoring Control and Protection system used is IEC 61850 Standard based on Substation Automation System. The project also includes addition/ modification of protection, control, communication and SCADA system at associated existing remote end substations SIS 9032 and 9025.Construction of 380/132/33kV BSP # 9064This project named as AL-Zulfi (BSP # 9064), constructed in the Al-Zulfi City to meet the rapid growing demand, Voltage problems and enhance the reliability and security of power supply in the AL-Zulfi Area. Construction of new indoor type 380/132/33 KV GIS BSP named as NEW AL-ZULFI 380/132/33 KV BSP # 9064 including complete protection, metering, control, communication and SCADA equipment. The Substation is equipped with Substation Automation System (SAS) and can be remotely controlled from the Energy Control Centre (ECC), through SCADA system, communication System and gateway. The monitoring Control and Protection system used is IEC 61850 Standard based on SAS. The project also includes addition/ modification of protection, control, communication and SCADA system at associated existing remote end substations SIS 9011, 9010 and 9029.

Jun 2016 - Dec 2017

Senior Electrical Engineer

Poyry Energy, Switzerland

Ras Al-Khair Desalination And Power Plant, Saudi Arabia

Company : Pӧyry Switzerland Limited, KSADuration : April 2014 to March 2016Position : Senior Electrical Engineer Client : Saline Water Conversion Corporation (SWCC) - KSAProject : Ras Al Khair Power and Desalination Project of SWCC Contractor: Desalination Plant: DOOSAN HEAVY INDUSTRIES $ CONSTRUCTION (SOUTH KOREAN COMPANY / POWER PLANT: SEPCO III (CHINESE COMPANY)Project Cost : 4.8 B$. Saline Water Conversion Corporation of Saudi Arabia (SWCC) awarded the EPC contracts for its first combined cycle cogeneration power and a desalination project on 10 November 2010(04/12/1431H).Ras Al Khair Power and Desalination Plant (RKPDP) Phase 1, is unique Plant that has demonstrated a high efficiency in effective utilization of heat energy for generating power and producing desalinated potable water.The project Ras Al Khair Power and Desalination Plant Phase 1 for SWCC includes:1) Construction of Desalination Plant of 224.8 MIGD (MSF 20MIGD X 8 Units and R.O. 34MIGD X 2 Units) 2) Construction of Power Plant having generation capacity of 3600 MW [Power Generation from 1 unit of simple cycle and 5 units of combined cycle out of which the 2400 MW Combined Cycle Power Plant (1,050 MW supply to SEC +1,350 MW supply to Ma’aden Aluminum Complex + 1,200 MW will be used for the plant utilities) utilizes the heat energy of Natural Gas, initially to operate the Gas Turbines (GT) and the GT exhaust is directed to Heat Recovery).

Apr 2014 - Mar 2016

Lead Electrical/Project Engineer

Dar Engineering, Al-Fanar Group, Saudi Arabia

Dammam, Saudi Arabia

Company : DAR Engineering (Al-Fanar Group), KSADuration : March 2011 to December 2013Position : Project Engineer (Electrical & Communication) Client : Saudi Electricity Company / National Grid - SAProject : Construction of New Safaniyah 380/230kV GIS Substation Contractor : Substation: Siemens / OHTL: Larsen & Tubro (L&T) Project Cost : 298.6M + 129.65M Saudi Arabian Riyal Construction of New Safaniyah 380/230KV GIS Substation with One (1) 380 kV single circuit each evacuating power from existing Ma’aden 380/115kV and Manifa 380/115kV S/S. In addition to this six (6) 230 kV DC OHTL feeding power from Safaniyah 380/230kV BSP to new Saudi Aramco’s Northern Area Oil Fields S/S, existing Safaniyah Power Plant S/S, existing Safaniyah Substation-10 (2 circuit each) and one circuit each feeding power to existing Tanajib, Khursaniyah and Aramco’s TP-20 offshore S/Ss. This project also includes installation of two nos. of 752.5 MVA Auto Transformers and future provision for one no. of 752.5 MVA Auto Transformer and three nos. each of 380kV and 230kV future bays and one 380kV Cable tunnel.Modification (Protection and communication) works to be done at 380kV existing Ma’aden and Manifa S/S, 230kV existing Safaniyah P/P S/S, Safaniyah S/S-10, Tanajib, Karmah and Khursaniyah S/Ss.

Mar 2011 - Dec 2013

Electrical Engineer

Jacobs Zate

Saudi Arabia

Company : JACOBS – Zamel & Turbag Consulting Engineers (JZATE), KSA Duration : February 2006 to Nov. 2010Position : Electrical and Communication Engineer Client : Saudi Electricity Company / National Grid - SA(1)Project : Construction of Jubail 380/230kV GIS S/S & Associated Modification Works Contractor : Substation: Cogelex AREVA / OHTL: SSEM Project Cost : 556.44M + 213.5M Saudi Arabian Riyal Construction of 380/230KV New Jubail-II GIS Substation with two Double circuit 380 kV line evacuating power from Marafiq S/S, One 380kV DC OHTL from Ghazlan PP S/S and three 380kV double circuit lines feeding power to Ma’aden S/S, Al-Fadhili S/S & Dahiyah S/S. In addition to this 230 kV DC OHTL feeding Saudi Kayan (PMD) S/S and NIGC S/S.(2) Project : Construction of Abu Hadriyah 380/115kV GIS S/S Contractor : Substation: MEEDCO / OHTL: NCC Project Cost : 185.62M + 61.45M Saudi Arabian Riyal Construction of 380/115KV Abu Hadriyah BSP(GIS) substation with one Double circuit 380 kV line evacuating power from Al-Fadhili S/S and three double circuit lines going to SARAMCO’s Abu-Hadriyah field, Khursaniyah CPF and Al-Fadhili field substations.

Feb 2006 - Nov 2010

Project Engineer (Electrical & Instrumentation)

Larson And Toubro (L&T) Ltd. (Ecc Division), India

India

Client : National Thermal Power Corporation (NTPC) & Bharat Heavy Electricals Limited (BHEL) India(1) Project : Development of 1000MW Coal Based Thermal Power Project, at Sipat Stage-II (2x500 MW), India Duration : March 2004 to Jan. 2006Scope of works includes 2x500MW Supercritical Steam Generators, ESP’s, 2x275m high twin flaw emission stacks,1x275m high single-flue stack, 765kv, 400kv & 132kv Switchyards, A Circulating water system with induced draft cooling towers, an ash water recirculating system, effluent treatment plant and central monitoring basin, DCS.(2) Project : Development of 1980MW Coal Based Thermal Power Project, at Sipat Stage-I (3x660 MW), for National Thermal Power Corporation (NTPC) Duration : Aug. 2002 to Feb. 2004Project involved Project Involves construction of the first Alstom GT26-based combined cycle power plant. Steam Turbine (225MVA) Generator / Power Transformers including 313MVA, 195MVA (11KV, 0.8P.F.), 120MVA (11KV, 0.8P.F.), Electrostatic Precipitator (ESP’s)The scope includes Design, Engineering, Manufacturing, testing and inspection at Manufacturer's works, packing, supply, Transportation, Transit Insurance. Delivery to site, unloading, Storage and Equipment erection including associated Civil and Structural works of 400KV/132KV Switchyard at Sipat. Further it shall include the cabling, lighting, earthing, site testing, inspection and commissioning of 400/132 KV switchyards. The Scope also includes 2 nos. 132 KV S/C transmission line along with the associated 132 KV switchyards at make-up water pump house, construction of Switchyard Control Rooms Building its HVAC and lighting. The scope of work also includes the work of construction of additional line bays in 400 KV switchyard package to be done on behalf of POWERGRID (4 additional bays -400KV) at Sipat STPP switchyard on deposit work basis.

Aug 2002 - Jan 2006

Erection And Maintenance Engineer

Tata Tele Services (Maharashtra) Ltd

India

Job Responsibilities held at Tata Tele Services Limited:To manage the team of FEOs (Field Engineering Officers) for:• Installation and commissioning of BTS equipment (Lucent, Motorola, Ericsson), Microwave/BTS/RF antenna, RF cable, connectors, TMA (Tower Mounting Amplifier), Electrical equipment, earthing system for BSNL• VSWR Testing of RF cable, Implementation and commissioning of ONU (Optical network Unit) and LAN OFC network• Repairs of OFC by suitable splicing method & testing by OTDR & Optical Power Source meter• Operation & Maintenance of Utilities like PAC, DG Sets, Battery & Rectifiers, SMPS, Electrical Panel (AC & DC), Earthing System, Transport Equipment, Security Systems etc. at BTS & POI sites• Fault detection in Copper cable using fault locator and is rectification by button joint method. In network maintained 10 Pairs to 200 pairs copper cable• Installation and commissioning of BTS equipment (Lucent, Motorola, Ericsson), Microwave/ BTS/RF antenna, RF cable, connectors, TMA (Tower Mounting Amplifier), Electrical equipment, earthing system for BSNL. • VSWR Testing of RF cable, Implementation and commissioning of ONU (Optical network Unit) and LAN OFC network• Installation and commissioning of Data (D) Links equipment• Splicing and testing of OFC link for ring network for Hughes telecom.• Manage field team for OFC network implementation, testing, commissioning and all documentation works of projects & maintenance work.• Splicing of OFC (Optical Fiber Cable) 6F, 12F, 24F, and 48F for BSNL.• Testing, Fault detection and its rectification in OFC by OTDR and LSPM.• Handling supervisors’ team for trenching, ducting, laying & pulling of OFC implementation projects.• Installation and testing of MUX (Optical system)• Coordination with other government department for permission of digging at city road for cable repairing work and to protect the cable from being cut due to digging activity.

May 2000 - Jul 2002
Team & coworkers

Colleagues at Future Technologies for Water Desalination Company

Other employees you can reach at fichtner.co.uk. View company contacts for 16 employees →

1 education record

Abdul Mohid Sheikh education

  • Bapurao Deshmukh College Of Engineering, Nagpur University, Maharashtra, India
    Bapurao Deshmukh College Of Engineering, Nagpur University, Maharashtra, India
    First
FAQ

Frequently asked questions about Abdul Mohid Sheikh

Quick answers generated from the profile data available on this page.

What company does Abdul Mohid Sheikh work for?

Abdul Mohid Sheikh works for Future Technologies for Water Desalination Company.

What is Abdul Mohid Sheikh's role at Future Technologies for Water Desalination Company?

Abdul Mohid Sheikh is listed as Senior Electrical Engineer at Future Technologies for Water Desalination Company.

Where is Abdul Mohid Sheikh based?

Abdul Mohid Sheikh is based in Saudi Arabia while working with Future Technologies for Water Desalination Company.

What companies has Abdul Mohid Sheikh worked for?

Abdul Mohid Sheikh has worked for Future Technologies For Water Desalination Company, Fichtner Consulting Engineers Ltd, Egis Consulting, Poyry Switzerland Limited, and Saudi Technologists Consulting Engineers.

Who are Abdul Mohid Sheikh's colleagues at Future Technologies for Water Desalination Company?

Abdul Mohid Sheikh's colleagues at Future Technologies for Water Desalination Company include Abdullah Aljasir, Adnan Ahmad, Yarendar Reddy Pmp® Rmp®, Rashad Ikram, and Milan Kumar.

How can I contact Abdul Mohid Sheikh?

You can use AeroLeads to view verified contact signals for Abdul Mohid Sheikh at Future Technologies for Water Desalination Company, including work email, phone, and LinkedIn data when available.

What schools did Abdul Mohid Sheikh attend?

Abdul Mohid Sheikh holds Bachelors Of Engineering, Nagpur University, Maharashtra, India, Power Electronics Engineering, First from Bapurao Deshmukh College Of Engineering, Nagpur University, Maharashtra, India.

What skills is Abdul Mohid Sheikh known for?

Abdul Mohid Sheikh is listed with skills including Commissioning, Substation, Electrical Engineering, Engineering, Electricians, Energy, Electricity, and Power Systems.