Abeer Ali work email
- Valid
- Valid
Abeer Ali personal email
- Valid
- Valid
Design Technical advisor on complex engineering matters related to a wide range and scale of projects, recommending long and short range plans, standards, and procedures. Work as a Project Manager for planning, design, and construction management services providing technical authority.
-
Wsp UsaRockville, Md, Us -
Construction AdminstrationWsp Usa Feb 2022 - PresentNew York, Ny, UsConstruction administration for two projects working with the construction project manager ensuresthe project stays on track and meets quality standards and assembles bid packages, oversees thesubcontractor and vendor hiring process, and compile detailed on-site construction activity logs. The National Institutes of Health (NIH): the services with NIH National Institute of Allergy and Infectious Diseases (NIAID) – Vaccine Research Center (VRC) Laboratory Expansion, Bldg. 40A North Tower Project. The building is designed as a 6-story building with floors and interstitial utility support spaces that align with the existing adjacent Building 40. Excluding interstitial floors, building 40A North Tower has a total gross building area of 7,596 square meters (81,770 square feet). The Ground and First Floors have gross areas of 914 square meters (9,835 square feet) each, while the Second through Fifth floors align with the existing laboratory floors and are 1,442 square meters (15,525 square feet) each. Building 40A North Tower will be constructed as a high-rise building and will be provided with a fire command center. Wolfspeed the world’s largest, state-of-the-art, automotive-project qualified 200mm silicon carbide materials factory, to dramatically increase capacity for its Wolfspeed silicon carbide project. This factory will also be larger than any current silicon foundry in the world. The project encompasses the design of a new multi-building campus on approximately 300 acres. -
Construction ManagerHenry M Jackson Foundation Sep 2020 - PresentSeattle, Washington, Us• Construction Manager for projects located on the Walter Reed National Military Medical Center Campus (WRNMMC), in Bethesda Maryland. The intent of this project is to repair and renew two building (Building 43 &Building 47)/ the Armed Forced Radiobiology Institute (AFRRI) research and development in accordance with current codes and standards, and inadequate to support vivarium best practices. The project includes a major renovation and new construction to the existing facility. The existing building consisted of 58,939 square feet• Attending all inspections of the project. Maintains and reviews the accuracy of construction plans and specifications. Managing and coordinating the construction process and cost estimates if needed. Coordinate with other relevant offices to develop construction documents -
Construction Manager And ArchitectHfs (Health Facility Solution) Sep 2018 - Aug 2020Project Manager for two projects located at WRAIR. First project for renovation of Bldg. 501. The project includes the renovation and minor construction to the existing facility to produce a state-of-art Vaccine Production Facility. The existing building consisted of 21,075 square foot with two previous additions added for a total of 21,747 square foot. • The second project includes a major renovation of the existing 67,518 square foot two-story building to bring it in accordance with current building codes and standards, and adequate to support vivarium best practices. Also included is a 5,300 square foot standalone two-story addition to house specialty equipment mainly shock tube labs
-
Senior ArchitectP&T Architects And Engineers Ltd Feb 2017 - Jun 2018Hong Kong, HkProject Type: Healthcare Responsibilities include:• Planning, designing, and construction management services providing technical advice for the $6.8 bn Project for Development of Security Forces Medical Complexes, Saudi Arabia’s largest healthcare project and largest medical project in the Middle East. The project under is a design-and-build contract with ABV Rock where P&T provides architectural services and Leo A Daly provide the health care planning and equipment supply. • Solving complex engineering matters related to small and big scale projects, recommending short-range plans, standards, and procedures. Also responsible for designing engineering rooms in hospitals using FGI, and VA requirements. -
Project ManagerPrime Ae Group, Inc. Sep 2014 - Sep 2016Baltimore, Md, UsProject Type: Healthcare & DoDResponsibilities included:• Designing and providing advice on complex engineering matters related to a wide range and scale of projects, recommending-long and short-range plans, standards, and procedures. • Developing area program analysis spreadsheets, and conceptual master plan, following all the required standards such as FGI for healthcare projects, IBC, and NFPA.• Preparing construction documents and shop drawing reviews.• Contributing to preparation design documents in cooperating LEED criteria for energy efficiency, and sustainability.- MacDonough Hall Repair, U.S. Naval Academy, Annapolis MD; 90,000 sq. ft.- Roll Dental Clinic, Ft. Leonard Wood MO; 12,833 sq. ft. - 434 Refueling Wing, Grissom ARB, Peru IN; 3 buildings, 49,514 sq. ft.- National Defense University (NDU) Classroom Upgrades, Marshall Hall, Ft McNair WDC - the reconfiguration of existing classrooms, total cost $80,920.- Colmar Dining Facility, building 367, is a “Five Star” Navy Dining Facility which is centrally located within one of the Navy’s Construction Battalion Naval Bases. It serves many units that are actively preparing to deploy.- Commission Statement of Condition for Carl R. Darnall Army Medical Center (CRDAMC) in Fort Hood, TX. A Life Safety/Fire protection assessment report provided with life safety plan and fire protection plan. -
ArchitectSymex Healthcare Corporation Jan 2012 - Jul 2013Project Type: Healthcare Responsibilities included: • Developing area program analysis spreadsheets, and conceptual master plan, following all the required standards such as FGI for healthcare projects, IBC, and NFPA.• Preparing construction documents and shop drawing reviews for- Abuja Diagnostic Center, 4 stories building with an area of 70,686 sq. ft.- Rita San Jose Hospital, Costa Rica, a renovation of the existing Rita San Jose hospital in accordance with international and U.S. standards and codes, including a design for future expansion to be equipped with cutting-edge medical technology - Heritage Building, Barbados,3 story clinic with an area of 5400 sq. ft.
-
Architect-Associated EngineerParsons Jun 2010 - May 2011Chantilly, Virginia, UsProject type: Healthcare VA Medical Center in Orlando, FloridaThe project was constructed on a 65-acre campus in southeast Orange County. The 1.2 million square foot facility cost $665 million. The medical center has a large multi-specialty outpatient clinic, 134 inpatient beds,120 community living center beds, a 60-bed domiciliary, administrative and support service building.Responsibilities included:• Developing area program analysis spreadsheets, and conceptual master plan, following all the required standards such as FGI for healthcare projects, IBC, and NFPA.• Maintaining Commissioning Elapsed Time Schedule, updating Commissioning Building and Infrastructure Plan, and preparing FPTs for commissioning, reviewing RFIs, and submittalsProject type: Offices GSA HPGB ProjectThe American Recovery and Reinvestment Act (ARRA) authorized the expenditure of the Federal Building Fund, providing a budget for renovation of federal buildings so that they comply with high-performance green building requirements.Responsibilities included:• Reviewing project design packages and specifications, incorporating LEED criteria into the design of the renovation of twenty-two federal buildings in Washington DC: Using a PRMA roofing system, Rooftop Photovoltaic (PV) Systems, Supply Air Temperature Reset, Chilled Water Temperature Reset, Demand Controlled Ventilation, Variable Toilet Room Exhaust, Adaptive Controllers for Elevators, Low Flow Water Closets and Urinals, Window Retrofit, Variable Air Volume (VAV) Conversion, Lighting Improvements.• Managing inspection and acceptance of all work. -
Design MangerParsons International Nov 2009 - Apr 2010Kapellen, BeProject type: Urban PlanningWasat Al-Madina Block Revitalization Program (E3-2) Initiated by ADM/UPCResponsibilities included: • Developing and completing report on the existing condition of the downtown Abu-Dhabi buildings with baseline evaluations.• Providing the consultancy services for the development of Wasat Al- Madina (downtown)Project type: Educational Building and OfficesMusanada - IMPACT Responsibilities included: • Developing space programming and preparing RFPs.• Developing design and construction drawings using AutoCAD. • Advising on new technology related to client requirements.- National Rehabilitation Center - total cost $68,073,519- Economic Department Office l - total cost $68,073,519 - National Consulting Council Office - total cost $47,651,463 - Covered Sports Hall for Baniyas Sports Club - total cost $13,614,703 - Three schools ( Saadiyat)–each school total cost $110,546,123 -
Senior Project ArchitectParsons International Limited, Dubai, United Arab Emirate Nov 2006 - May 2009Chantilly, Virginia, UsProject type: Residential Mohammed Bin Rashid Housing Program, National Housing Project, EMAAR Properties The project included 2 sites:(1) Al-Warkaa - 544 villas with a total cost of $156,244,504(2) Al-Muteena 940 villas with a total cost of $30,844,717,871.Responsibilities included: • Managing the design phase and construction phase for the projects• Overall planning, coordination, and control of the project, specifying project objectives and plans including delineation of scope, budgeting, scheduling, setting performance requirements and all infrastructure work
Abeer Ali Skills
Abeer Ali Education Details
-
University Of TechnologyArchitecture -
University Of TechnologyArchitect-Green Pre -Apprenticeship Construction Program -
Penn Foster GroupPenn-Foster College -
Penn Foster GroupPenn-Foster College
Frequently Asked Questions about Abeer Ali
What company does Abeer Ali work for?
Abeer Ali works for Wsp Usa
What is Abeer Ali's role at the current company?
Abeer Ali's current role is Construction Administration WSP USA.
What is Abeer Ali's email address?
Abeer Ali's email address is ab****@****ail.com
What schools did Abeer Ali attend?
Abeer Ali attended University Of Technology, University Of Technology, Penn Foster Group, Penn Foster Group.
What skills is Abeer Ali known for?
Abeer Ali has skills like Autocad 2d And 3d, Construction Management, Construction Documents, Architectural Design, Detailing, Construction Drawings, Sustainable Design, Site Planning, Renovation, Urban Planning, Concept Design, Revit.
Who are Abeer Ali's colleagues?
Abeer Ali's colleagues are Dr. Diar H., Scott Balestra, Mohamed Aly Sheta, Jordon Macquarrie, Dustin Nickel, Jae Hoon Lee, Gabriel Borras.
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial