Abheesh V P Email and Phone Number
Experienced Project engineer with a demonstrated history of working in the renewable energy (Solar Energy)specifically in roof top and upto 1.5 MWp Ground mounted solar power Projects.& having more than four and half year gulf experience in High Voltage cable laying and Indoor substation erection as a Electrical Engineer. Skilled in AutoCAD, Solar project design, Pvsyst,SCADA, Electrical Wiring, U/G cabling & Power distribution . Strong program and project management professional with a Bachelor of Technology focused in Electrical and Electronics Engineering from Government College of Engineering Kannur , Kerala , India.
Almoayyed Solar Company B.S.C
View- Employees:
- 6
-
Design And Estimation EngineerAlmoayyed Solar Company B.S.C Dec 2022 - PresentBahrain -
Project EngineerEurja Infrastructure Feb 2022 - Aug 2022Chennai, Tamil Nadu, IndiaProjects1)1.5MWp Ground Mounted Solar Power Plant.KSEBL, Nenmmara, Palakkad, Kerala.2)300 kWp Ground Mounted Solar Power Plant @, Kamarajar Port Ltd ,Chennai. -
Senior Project EngineerAstra Power Solutions Jun 2020 - Feb 2022Kozhikode, Kerala, India
-
Project CoordinatorThapas Energy Apr 2019 - Apr 2020Calicut Area, IndiaDuties & Responsibilities Responsible for all the Projects Paper works, feasibility study, registration & Completion Reports. Designing of the Plant-Selection Of Suitable Rating of Inverter, Numbers of Panels, Number of Strings, Sizing of Cables - DC & AC, Solar Plant Evacuation point, & ACDB, DCDB Selections. Site analysis –Detailed study of the site using Solmetric Sun eye & AutoCAD (Shade analysis, & Generation of Production Report.) Monitoring & Analyzing of Manpower utilization. Technical Support to the Sales Teams. Projects • Double Horse Mangilas Food- Trissur- 50 kWp50 kWp Grid tie Solar power plant.Solar Panels:- 150 numbers of 335 Wp Polycrystalline.Inverter :- Good We – 50 kW.Roof Type :- Sheet Roof.Structure :- Aluminium mono Rail. Average Production :- 200 units / Day. • Image Mobiles – Perinthalmanna-30 kWp 30 kWp Grid tie Solar power plant. Solar Panels: - 90 numbers of 335 Wp Polycrystalline.Inverter :- RISHAB RADIUS – 25 kW.Roof Type :- Sheet Roof.Structure :- Aluminium mono Rail. Average Production: - 120 units / Day• Olavanna Gramapanchayath – Calicut-10 kWp 10 kWp Grid tie Solar power plant.Solar Panels: - 30 numbers of 335 Wp Polycrystalline.Inverter :- RISHAB RADIUS – 10 kW.Roof Type :- Flat concrete Roof.Structure :- Aluminium readymade structure . Average Production: - 40 units / Day Number of Domestic projects varies from 3 kWp to 15 kWp.
-
Electrical EngineerTaher Contracting Establishment. Feb 2014 - Oct 2018BahrainDuties & Responsibilities 11 kV indoor substation Equipment installation. Inspection of all HV and LV cable laying in coordination with all relevant Utilities like water, Roads, Sewerage, Telecom etc. Preparation of Project Materials Requirements, Measurements, As built Drawing, & Invoices. Arranging & attending shutdowns (HV& LV) & site meeting with Ewa Supervising Engineer. If permission granted by the authority conducted LV shutdowns. In coordinating with Budaiya Dept conducting emergency maintenance during fault. Verify the Phase sequence during substation installation & shutdown.Projects • Net Work Division For ALNAKHEEL RESORTS - EWA Special Project Installed 1500 kVA Transformer, 2+1 RMU, 1500 A ACB. Laid 11 kV u/g cable from Ganabiya Primery to Alnakeel Resort Substation. • 11 kV Reinforcement Sh.Khalid –Hamala Makhazan Ring –EWA Special Project. Dumistan / 1012 More than 3 km length . laid 11 kV u/g cable from Dumistan Primery to Hamala,• Uprating Of S/S 187 B –EWA Scheme Job . Manama / 318 . Uprated Existing 1000 kVA Transformer to 1500 kVA.• Net Work Division Baytj Industrial Co. Hidd / 115 – EWA Scheme Job Installed 1500 kVA Tx , 7 way LVB , & 1000 A ACB.• Net Work Division In Samaheej 26 Infill . Ewa Scheme Jobs. Installed 3 numbers of New Substation , laid Lv & HV cables .• Net Work Division at Al Fateh. Ewa Scheme Job . Installation of New Two Substations. 1500 kVA , 2+1 RMU , 2500 A ACB.During that periods Large number of Scheme jobs, 3992 Jobs (Reinforcement projects) & 3981 Job (Service Jobs) from EWA & Special Projects have completed, if it listed the space would not be enough .
-
Electrical SupervisorPowerman Electricals ,Aluva ,Ernakulam Apr 2013 - Oct 2013
-
Apprentice Trainee220 Kv Substation ,Orkkatery ,Vadakara Aug 2012 - Feb 2013
Abheesh V P Education Details
-
Govt.College Of Engineering Kannur , Kerala , IndiaElectrical And Electronics Engineering
Frequently Asked Questions about Abheesh V P
What company does Abheesh V P work for?
Abheesh V P works for Almoayyed Solar Company B.s.c
What is Abheesh V P's role at the current company?
Abheesh V P's current role is Experienced Electrical Enginer in Solar energy, , High Voltage Ug cable Laying and Indoor substation Erection..
What schools did Abheesh V P attend?
Abheesh V P attended Govt.college Of Engineering Kannur , Kerala , India.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial