Ach. Kustiyono Email and Phone Number
Ach. Kustiyono personal email
- Valid
Having 25 years experience in civil/structural engineering design, especially in range of Oil and Gas, Petrochemical and Power plant Generation. Involved in Feasibility Studies, Front end Engineering Design and EPC stage with main assignment as Structure/Civil/Building Engineer.
Pt Tripatra Engineering And Constructors
View- Website:
- bintunienergypersada.com
- Employees:
- 179
-
Sr. Civil And Structural EngineerPt Tripatra Engineering And ConstructorsBekasi, Id -
Sr. Civil/Structural EngineerPt Tripatra Engineering And Constructors Aug 2016 - PresentJakarta, IndonesiaHaving 25 years experience in Civil Structure Engineering Design. Especially in range of Oil and Gas Petrochimical and Power Plant Generation. Involved in Feasibility Studies, Front end Engineering Design and EPC stage with main assigment Civi/Struvtural/Building Engineering, and qualified with 22 years in Engineering Design.Fabrication with 3 years (As Enginerring planner of delineation consultant that request of client for Supervision and checking the result of Fabrication accordance with the design and progress has been done of determined. -
Sr.Civil-Structural Engineer And Sr. Qc Civil / Structure EngineerPt. Rekayasa Engineering Consultants,Jakarta Jun 2015 - PresentJakartaSumpal Compression Facilities, ConocoPhillips (Grissik) Ltd, South Sumatra , INDONESIA
-
Lead Civil / Structure EngineerPt.Singgar Mulia Engineering Consultants, Jul 2012 - Jun 2015JakartaProject:PHE ONWJ - EPCI for GG New Development ProjectResponsibilities:- Prepare and verify related technical documents (design basis, some specifications and procedures, design criteria for Civil, calculation note, , spreadsheets, etc)- Supervise preparation of design calculation (pipe rack, bridge, technological structure, platform, shelter, RCC Building, concrete foundation (tank & equipment), pipeline, general civil works (road, pavement, & drainage), including the detail engineering drawings and the MTO. - Supervise structure engineer in preparing calculation and drawings- Coordinate and control Contractor activities in the development of engineering and drafting, material take off, survey, cost estimate, administration, and projects planning and schedulingOwner :PHE ONWJ Project : FEED Engineering Services for OO-OC-OX Field development ProjectLocation:OPF_Balongan Area Of OO-OC-OX Cirebon Central JavaOwner :PHE ONWJ Project : FEED Engineering Services for TSB Phase 2 ProjectsLocation:Subsea – Batur and Sirasun in Bali SeaOwner: PT Kangean Energy IndonesiaProject:EPCI – KF Booster Compression System ProjectClient:PT Timas to Star Energy (Kakap) LtdPosition: Sr. STRUCTURE /CIVIL ENGINEERING Sumpal Compression Facilities Project, ConocoPhillips (Grissik) Ltd, South Sumatra, INDONESIA (FEED). (May 2013 – November 2013)Suban Long Term Disposal Water, ConocoPhillips (Grissik) Ltd, South Sumatra, INDONESIA (FEED). ( January 2013 – April 2013) RAWA POWER GENERATOR Project ConocoPhillips (Grissik) Ltd, South Sumatra, INDONESIA (FEED). (January 2013 – March 2013)SUBAN - Mercury Removal Project ConocoPhillips (Grissik) Ltd, South Sumatra, INDONESIA. (FEED). (September 2012 – December 2012)
-
Sr. Structure /Civil EngineeringPt. Petrofac Inter’L (Pii) Mar 2009 - Jun 2012Jakarta1.South Yoloten Gas Field Development Project - Turkmengas (March 2011 – May 2012) Project Value : $ 2.30 Billion2.CENTRAL PROCESSING FACILITY AND TELECOMMUNICATION SYSTEM (LOT 1 +7)EL MERK, ALGERIA PROJECT (March 2009 –May 2010 )Project Value : $ 1.95 3.EPC FOR ASAB FFD PROJECT (May 2010 – March 2011 ) ProjectAbu Dhabi Company for onshore Oil Operation 4.KARACHAGANAK PETROLEUM OPERATING B.V. PETROFAC INTERNATIONAL. LTD PROJECT5.RE FEED & EL MERK PROPOSAL PHASE II, ALGERIA – (Proposal)6.Kuwait Oil Company-Building GC24 at Sabriyah (Proposal)
-
Sr. Structure /Civil EngineeringPt. Karinda Sumber Daya (Ksd) Jul 2003 - Mar 2009JakartaJuly 2003 - June 2004PETROCHINA LTD – BETARA COMPLEX DEVELOPMENT PHASE 3 PROJECT, JAMBI, SUMATRA JOINT WITH CHIYODA INTERNATIONAL INDONESIA.July 2004 – September 2005PERTAMINA-MERBAU GAS GATHERING FACILITY & PAGARDEWA GAS SUBMISSION FACILITY DEVELOPMENT PROJECT (PACKAGE III) AND MUSI BARAT- PAGARDEWA GAS TRANSMISSION & COMPRESSION DEVELOPMENT PROJECT (PACKAGE II)-SOUTH SUMATERA. October 2006-November 2006 Kuwait Oil Company-Building GC24 at Sabriyah (Proposal)Jan 2007 – March 2007GAS SEPERATION PLAN 6th Project (Proposal)• Prepare Calculation and Engineering drawing for Steel structure piperack, Tech-Structure, equipment structures and other structure, include MTO Steel and Foundation For MAP TA PHUT- THAILAND. All design have used British Design Code.PTT PUBLIC COMPANY LIMITED - FOOSTER WELLER April –Nov 2007KARACHAGANAK PETROLEUM OPERATING B.V. PETROFAC INTERNATIONAL. LTD PROJECT •Prepared of calculation to design structure & foundation of Spur rack Structure, Shelter, Piperack - Area 210D for Karachaganak 4th Stabilization & Sweetening Train Project at Western Kazakhstan.•Prepare of calculation Report For IFD (issue for Design) and Product Engineering drawing for IFC (Issue For Construction ) to steel structure & Foundation Drawing. All design have used British Design CodeDec 2007 – April 2008Jihar Development Project, HPC, Syria) – (Proposal) • Prepare Calculation and Engineering drawing for Steel structure piperack, Tech-Structure, equipment structures and other structure, include MTO Steel and Foundation . All design have used British Design Code June 2008 – September 2008RE FEED & EL MERK PROPOSAL PHASE II, ALGERIA – (Proposal)
-
Sr. Structure/Civil EngineerPt. Meindo Pancarekayasa Consulting Engineering Joint With Sempec Indonesia Jun 2001 - Jun 2003Jakarta.June 2001 – July 2002PT. TOTAL FINA’ELP INDONESIA – PECIKO EXPANSION PROJECT, EAST KALIMANTAN. July 2002 – June 2003PT. VICO – TUNU EXPANSION PROJECT, EAST KALIMANTAN• Prepare design, calculation and engineering drawing sketches for civil structures at Process, utility area.• Prepare of calculation and engineering drawing for steel structure & concrete buildings (central building, fire station building, workshop building at TUNU project). All design have used US Design Code.• Control such shop drawing and civil material requirement for PO.• Support site problems during construction stage.
-
Civil/Structural EngineerPt. Thies Mar 2000 - Apr 2001Structure /Civil EngineerMarch 2000 – April 2001PT. CALTEX INDONESIA, CGS 3,5,9 EXPANSION PROJECT, DURI – PAKANBARU.• Prepare requisition (steel structure fabrication, overhead crane, pc spun pile, anchor bolts) and bid tabulation.• Prepare project specification and design criteria. All design have used US Design Code• Prepare of calculation and engineering drawing for steel structure, concrete building & foundation.
-
Structure/Civil EngineerPt. Inti Karya Persada Tehnik Jan 1993 - Jan 1997JakartaJanuary 1997 – February 2000PT. BADAK-TRAIN H, LNG EXPANSION PROJECT, BONTANG, EAST KALIMANTAN. JOINT WITH KELLOGG MW COMPANY.• The duty performing prepare engineering data, and specification of material, civil arrangement work, civil execution procedure, drawing and civil work standard, direct supervisor civil work pc, pile driving and foundation for process and utility area.• Support site problems during construction stage.• Control such drawing and civil material requirement for construction.
-
Structure/Building EngineerPt. Matahari Putra Prima Jan 1993 - Jan 1997JakartaJanuary 1993 – January 1997• Prepare design, calculation and engineering drawing sketches for civil structure/building at matahari project groups.• The duties were performing calculation of structure and building specification of material, civil execution procedure, foundation work and site foundation design of civil work all Matahari project group.• Control such drawing for IFC and civil material requirement for construction.
Ach. Kustiyono Skills
Ach. Kustiyono Education Details
-
Mercu Buana UniversityS1 Degree
Frequently Asked Questions about Ach. Kustiyono
What company does Ach. Kustiyono work for?
Ach. Kustiyono works for Pt Tripatra Engineering And Constructors
What is Ach. Kustiyono's role at the current company?
Ach. Kustiyono's current role is Sr. Civil and Structural Engineer.
What is Ach. Kustiyono's email address?
Ach. Kustiyono's email address is ku****@****hoo.com
What schools did Ach. Kustiyono attend?
Ach. Kustiyono attended Mercu Buana University.
What skills is Ach. Kustiyono known for?
Ach. Kustiyono has skills like Epc, Feed, Lng, Construction, Civil Engineering, Petrochemical, Gas, Engineering, Petroleum, Onshore, Steel, Concrete.
Who are Ach. Kustiyono's colleagues?
Ach. Kustiyono's colleagues are Mumuh Rohana, Helmi Sasongko, Suhono Suhono, Arijanto Pratomo, Renal Di, Adi Setjadibrata Acpe,mpu, Zainal Arifin.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial