Adrian Dumitrescu work email
- Valid
Adrian Dumitrescu personal email
- Valid
Adrian Dumitrescu is a Oil and Gas Engineer at Snamprogetti Saudi Arabia Co.Ltd. They possess expertise in construction, construction management, engineering, autocad, project management and 16 more skills.
Snamprogetti Saudi Arabia Co.Ltd
-
Management Systems And Quantity ManagerSnamprogetti Saudi Arabia Co.Ltd Jan 2022 - PresentSaudi Arabia
-
Project Management System CoordinatorSnamprogetti Saudi Arabia Ltd Mar 2019 - Dec 2021Saudi ArabiaTransmits the information to the PM_C, TM and PSL for preliminary or final analysis, in compliance with the deadlines set out in this Work Instruction. Feeds the information system with the project data provided by Engineering. Enters the BoQ into the system, with quality verification by CM and TM. Enters the quantities and construction TAG Item lists received from the PSLs and transmits the results to the CM and TM for verification of quality and key quantities. Using QSC, ensures that the construction information system is updated with: - monthly progressreports, accounted to the subcontractors; - weekly construction progress reports for the work done, using monitoring of the elementary activities associated with the Tag Items/SCMCs/Construction sequences. Interfaces with the project PSL to assure updated estimated/engineered quantities per WBS/Contractor/Bill Item. Verifies the engineered quantities against the quantities completed and extracted from COLAV and PEE, thus supplying the project departments with the comparative data. Collects and enters into the system, on approval of the DS, the direct hours spent daily to complete the work, both direct and subcontracted;Coordinates and supports the system users and verifies the use thereof in relation to modules such as MAGA, PCOS, Punch List, Ted Flow, PTS and STS, managed by other project functions. Makes available the data required to issue periodic progress and statistical reports, deriving them from the system, and provides all project functions with the same, in particular PM/CM/PCM.Assures the proper operation and integrity of the data entered in PROM & COPR by implementing the parts for which he/she is responsible and interfacing with all project functions -
Piping Management System SpecialistTsgi - Műhendislic Inșaat Limited Șirketi Jun 2015 - Mar 2019Izmir, TurkeyManaging all the activities related to piping discipline for carbon, alloy and stainless-steel pipes. Coordinating and monitoring the spooling activities workflow procedures to ensure maximum efficiency and targets achievement based on project priorities, activities that lead to the start of pipes spool fabrication in workshops and later on to the erection and installation of pipes in final position. SPOOLGEN SMARTPLANT is an industrial-strength application that enables the creation of piping isometric drawings and welding maps for fabrication and erection from the design created during the detail engineering phase of projects. Implementation of welding maps extracted from SPOOLGEN into another system called WITS (Welding integrated tracking system) that provides easy monitoring of welding scope and NDTs coverage. Tracking of the spools released from workshop for painting / erection to the lay down area. Keep updated the system with NDT requirements as per Site Engineering Instructions approved by client. Follow up and uploading of daily welding production reports / NDT activities into the system. Project progress monitoring. Responsible in generating daily, weekly and monthly report. Control and approval of monthly subcontractors invoices. Monitoring of the change work orders.Prepare test packs execution schedule in accordance with construction and commissioning requirements. Set up tools (TEDFLOW) to manage the flow of documentation relating to the phases involved in testing a system, from the initial tests to their completion. Steer daily coordination meetings with subcontractors and internal site organization, in order to manage activities schedule and provide reports on progress of work and statistical data. Manage punch list close-out with internal organization and Client. Progress measurement monitoring using COSMO tool (a software designed for the management and progress control of all phases of specific on-site construction activities). -
Quantity SurveyorSaipem Jan 2015 - Jun 2015Milan, Italy- Pricing/Forecasting the cost of the different materials quantities needed for the project; - Prepare and analyse tender documents, contracts, budgets, bills of quantities, costs and other documentation.- Track changes to the design and/or construction work and adjusting budget projections accordingly;- Measure and value the work done on site;- Control and approval of Subcontractors payments;- Undertake cost analysis for repair and maintenance project work;- Analyzing outcomes and writing detailed progress reports;- Practical understanding of CDM regulations and their application. -
Project ManagerSc.Modricons.Srl Jun 2011 - Jan 2015Romania , Prahova , BraziEarth excavation and trench preparation for erection and installation of HDPE firefighting pipes.Construction of firefighting pump station, under-crossing of main roads, intermediary valvemanholes, construction of hydrants / deck gun foundations and platforms. Connection of co-generation and isomerization plant by building a new infrastructure of water supply and return pipes with cooling towers. Bringing all the facilities to the new emplacement of the forced draft cooling towers. Construction of foundations, electrical station and undergroundchannels for High voltage power cables that serve the unit. Application of waterproofing layers oncooling tower basins and installation of mechanical parts. Internally and externally revamping an existing natural draft cooling tower, restoration of externalsurface and waterproofing internal surface. Change of metallic damaged parts, painting of distribution nozzles and collectors.Revamping of Circular & Rectangular sedimentation tanks in waste water treatment unit.Industrial sewer rehabilitation by reshaping and waterproofing the internal surface with layerresistant to petrol product. Rehabilitation of sewerage tubes without digging, using lining rehabilitation method in order to stop existent leakages. This process consists of inserting the composite tubing in the host pipe, preliminary to insertion it is impregnated with a reactive resin which will be polymerized once is kept under steam pressure. Method is applicable to pipelines with nominal diameters between 100 and 2000 mm. For collapsed channels, GRP tubes have been used due to their high structural resistance to petroleum products and easy installation. New foundations have been constructed for vacuum distillation column, heat exchangers, pumps, dust filter and pipe support in fluid catalytic cracking unit. Due to deep excavation for vacuum distillation column foundation trench has been consolidated by drilling piles made by steel H profiles.
-
Installation And Maintenance Operator Of Telecommunication Network.Rcs&Rds Dec 2009 - Jan 2011Romania , Ploiesti.Internet , TV and telephony infrastructure.Connecting users to the network.
Adrian Dumitrescu Skills
Adrian Dumitrescu Education Details
-
Oil And Gas University Of Ploiesti8.25
Frequently Asked Questions about Adrian Dumitrescu
What company does Adrian Dumitrescu work for?
Adrian Dumitrescu works for Snamprogetti Saudi Arabia Co.ltd
What is Adrian Dumitrescu's role at the current company?
Adrian Dumitrescu's current role is Oil and Gas Engineer.
What is Adrian Dumitrescu's email address?
Adrian Dumitrescu's email address is ad****@****pem.com
What schools did Adrian Dumitrescu attend?
Adrian Dumitrescu attended Oil And Gas University Of Ploiesti, Oil And Gas University Of Ploiesti.
What are some of Adrian Dumitrescu's interests?
Adrian Dumitrescu has interest in Ascensiune Pe Plan Profesional.
What skills is Adrian Dumitrescu known for?
Adrian Dumitrescu has skills like Construction, Construction Management, Engineering, Autocad, Project Management, Contractors, Contract Management, Ms Project, Concrete, Project Planning, Contract Negotiation, Project Engineering.
Not the Adrian Dumitrescu you were looking for?
-
-
1hotmail.com
-
1yahoo.com
-
1yahoo.com
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial