Adrian Gabriel Leca

Adrian Gabriel Leca Email and Phone Number

thermomecanichal engineer with 25 years experience in Power Plants @
Adrian Gabriel Leca's Location
Bacău, Romania, Romania
Adrian Gabriel Leca's Contact Details

Adrian Gabriel Leca personal email

About Adrian Gabriel Leca

I am Thermomecanical Superintendent in charge of a 2x200 MW Power Plant and I coordinate and supervise all operations and maintenance activity in this Power Plant.I was Operations Manager of a Power Plant .

Adrian Gabriel Leca's Current Company Details
Termoelectrica SA -SE  Borzesti Romania

Termoelectrica Sa -Se Borzesti Romania

thermomecanichal engineer with 25 years experience in Power Plants
Adrian Gabriel Leca Work Experience Details
  • Termoelectrica Sa -Se  Borzesti Romania
    Thermomecanical Superintendent
    Termoelectrica Sa -Se Borzesti Romania Sep 2012 - Present
    Termoelectrica-Se Borzesti
    I coordinate and supervise all operations and maintenance activity in this Power Plant.
  • Termoelectrica-S.E. Borzesti
    Operations Manager
    Termoelectrica-S.E. Borzesti Oct 2000 - Sep 2012
    Termoelectrica-Se Borzesti
    I was Operations Manager in charge of the Power Plant Operation Departments - Boilers; Steam-Turbines; Electrical Generation and Distribution; Black Oil Discharging (Black oil tanks- 80.000 tones capacity); Gas Letdown Station (consumption 150.000Nm3/h) and I am responsible for leading the Operations Team to ensure safe and efficient operation . This power plant includes the following principal equipments:-3 steam boilers type TGM 84 , 420t/h,137 bar,540ºC with natural circulation,gas… Show more I was Operations Manager in charge of the Power Plant Operation Departments - Boilers; Steam-Turbines; Electrical Generation and Distribution; Black Oil Discharging (Black oil tanks- 80.000 tones capacity); Gas Letdown Station (consumption 150.000Nm3/h) and I am responsible for leading the Operations Team to ensure safe and efficient operation . This power plant includes the following principal equipments:-3 steam boilers type TGM 84 , 420t/h,137 bar,540ºC with natural circulation,gas and oil fuel-3x50 MW turbines type VPT 50 in cogeneration(for industrial and urban consumers)-2 steam boilers PK-47, 640t/h(2x230t/h),137 bar, 540ºC, with forced water circulation,gas and oil fuel -2X210 MW turbines type K-200-130 in condensation-a 110KV and 220KV Switchyard with 12 overhead lines of 110KV and 2 overhead lines of 220KV, 2 overhead lines of 35KV,3x80MVA transformers,2x250MVA transformers and 3x40MVA transformers I coordinated and supervised the operating and maintenance activities for 5x50 MW power units (5 units in cogeneration functioning with black oil and gas ) and 2x200 MW power units (gas and black oil). I ensured the efficiency of all operating and the electric and steam distribution to the consumers. I ensured the industrial steam consumption for the Petrochimical Platform(on 3 levels of pressure-10bar,18 bar and 40 bar)and the hot water demand for the Onesti town. I was responsible for developing, with the Plant operational objectives consistent with achieving maximum plant efficiency to meet customer requirements in the most safe, reliable, economical and environmentally safe manner. Show less
  • Renel
    Shift Supervisor
    Renel Oct 1993 - Oct 2000
    Termoelctrica-Borzesti 2-Coal-Fired Power Plant
    This power plant ensured the Electrical Power for the Romanian Electrical National Grid(about 150GW/year) and the Power Distribution & Steam Distribution for the Borzesti-Petrochemical Platform (Refinery, Rubber Plant and Chemical Plant),The industrial steam consumption was about 400 Tcal/year. I coordinated and supervised all the operating and maintenance activities for this power plant.including the thermomecanical and electrical operations in all departments of the… Show more This power plant ensured the Electrical Power for the Romanian Electrical National Grid(about 150GW/year) and the Power Distribution & Steam Distribution for the Borzesti-Petrochemical Platform (Refinery, Rubber Plant and Chemical Plant),The industrial steam consumption was about 400 Tcal/year. I coordinated and supervised all the operating and maintenance activities for this power plant.including the thermomecanical and electrical operations in all departments of the plant( steam boilers,turbines and their auxiliary equipments,water treatment,filling with gas,oil and coal,cooling water systems, 110KV Switchgear etc)I was directly subordinate on the operative line to the Romanian Electrical National Grid Dispatcher and I execute the dispositions of loading and discharging the electric power or for starting the reserve group to ensure the power demand of national grid,. and on the administrative line to the General Manager of the plant Show less
  • Renel
    Thermo- Mechanical Engineer
    Renel Oct 1989 - Oct 1993
    Borzesti Power Plant
    I performed in the Maintenance Department for repairing all thermo-mechanical equipments of Power Plant ( Boilers, Steam Turbines., Heat exchangers, Pumps, Tanks, Auxiliaries) In these department I followed up the execution of schedulled and accidental maintenances in according with maintenance procedures for all energetic equipments of the power plant..During the maintenance I followed up the quality of maintenance and I had participate to the final reception for the equipments after… Show more I performed in the Maintenance Department for repairing all thermo-mechanical equipments of Power Plant ( Boilers, Steam Turbines., Heat exchangers, Pumps, Tanks, Auxiliaries) In these department I followed up the execution of schedulled and accidental maintenances in according with maintenance procedures for all energetic equipments of the power plant..During the maintenance I followed up the quality of maintenance and I had participate to the final reception for the equipments after finishing of repairs and at the commissioning of these..Also I performed at Turbine Operation Departament where I supervise the turbine’s operating and I create, review or revise procedures/processes to increase efficiency of operating and for an economical performance. Also I drew up the energy balances to determine losses and improving the turbine operation and I made out the lists for the equipments programmed for maintenance. Show less

Adrian Gabriel Leca Skills

Product Development Refinery Research Lean Manufacturing Petrochemical Manufacturing Project Engineering Autocad

Adrian Gabriel Leca Education Details

  • Institutul Politehnic Bucuresti-Facultatea De Energetica
    Institutul Politehnic Bucuresti-Facultatea De Energetica
    Majored In Thermo-Electrical Power Systems,Graduated From The University Of Bucharest

Frequently Asked Questions about Adrian Gabriel Leca

What company does Adrian Gabriel Leca work for?

Adrian Gabriel Leca works for Termoelectrica Sa -Se Borzesti Romania

What is Adrian Gabriel Leca's role at the current company?

Adrian Gabriel Leca's current role is thermomecanichal engineer with 25 years experience in Power Plants.

What is Adrian Gabriel Leca's email address?

Adrian Gabriel Leca's email address is le****@****hoo.com

What schools did Adrian Gabriel Leca attend?

Adrian Gabriel Leca attended Institutul Politehnic Bucuresti-Facultatea De Energetica.

What skills is Adrian Gabriel Leca known for?

Adrian Gabriel Leca has skills like Product Development, Refinery, Research, Lean Manufacturing, Petrochemical, Manufacturing, Project Engineering, Autocad.

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.