Ahmed Tawfik, Pmp® Email and Phone Number
Experienced Civil Engineer with a demonstrated history of working in the civil engineering industry. Strong engineering professional skilled in Management, Teamwork, Active Learning, Research, and Risk Analysis.
-
Project ManagerZetaş Zemi̇n Teknoloji̇si̇ A.Ş.Dubai, Ae -
Project ManagerZetaş Zemi̇n Teknoloji̇si̇ A.Ş. Dec 2019 - PresentDoha, Qatar -
Civil EngineerBoom Construction Company May 2018 - Dec 2019Doha, Qatar -
Project EngineerSoletanche Bachy Apr 2017 - Apr 2018Dubai, United Arab EmiratesKEY ACCOMPLISHED PROJECTS: Dubai Metro Extension Line By Expolink 2020Dubai Harbour 2B - ( Menard Vibro)The Tower- Dubai Creek Harbour- (assigned to be the Next tallest tower in the world)Main Type of work:Vibro TechnologyDynamic CompactionSurface CompactionDiaphragm WallDeep Barrette foundations (75m)sheet pilesBulk Excavation,pre- and post- soil groutingTesting & MonitoringDeep Foundation TestingConstruction Materials Engineering And TestingInstrumentation And MonitoringLaboratory Testing Of Soil, Rocks & ConcreteProject Achievement & Responsibilities:Determines project specifications by studying product design, customer requirements, and performance standards; completing technical studies; preparing cost estimates.Determines project schedule by studying project plan and specifications; calculating time requirements; sequencing project activities.Report to the Project Manager, control, and monitor all activities related to Quality Management System, QMS.Maintains project schedule by monitoring project progress; coordinating activities; resolving problems.Controls project plan by reviewing design, specifications, and plan and schedule changes; recommending actions.Controls project costs by approving expenditures; administering contractor contracts.Prepares project status reports by collecting, analyzing, and summarizing information and trends; recommending actions.Perform all daily inspection and test of the scope and character necessary to achieve the quality of Coordinate with the consultant’s representative and Main Contractor for inspection and meeting about quality problems including the closure of Non-Compliance Report.Taking care of QA/QC documents of the entire project including certificates, calibration, test results, inspection requests, non-compliance reports and site instruction/observations, permanent materials delivered and other QA/QC documents. planing & supervising the Mobilization and demobilization Activities. -
Project Engineer @ Idris ProjectSoletanche Bachy May 2016 - Nov 2016QatarIDRIS MAIN TRUNK SEWER (MTS-01, MTS-03) Client: ASHGHALProgram Management Consultant: CH2MContractors: BOUYGES - UCC JVResponsibilities: 1- Supervision of diaphragm wall construction works on the WS03 – Shaft including pre- and post- grouting (downstage grouting methods) , Pumping test , quality control, material measurement, health and safety, adherence to the contractual documents and technical specifications and reporting to PM.2- Involvement covered supervision of grouting activities in WS03 shaft construction (Plug ).3- Checking and analysis of the daily production, preparation of daily production report, and analysis of Ground Investigation Reports.4- Prepare DR, CC, CPR, DER, reports for D wall construction and DR,GDS ,JANELUTZ and SPY for Grouting shaft work.5- Monitoring project execution and determining the necessary precautions to achieve maximum efficiency.6- Carried out site inspections in coordination with the Contractor's and Consultants7- Led and Supported Site Supervisors and technicians in daily shaft construction activities.8- Followed up Time Schedule including Manpower and Resources.9- Close all SOR, NCR reports in WS03 shafts.10- Maintain positive and proactive relations with managers and employees, as well as our customers and regulatory agencies.11- Supervise the Mobilization and demobilization activities in WS03 and WS02- Shaft . -
Site EngineerDoha Group Trading And Contracting- Al Mohannadi Group Jul 2015 - May 2016-checking plans, drawings and quantities for accuracy of calculations.-ensuring that all materials used and work performed are as per specifications.-planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines;-overseeing quality control and health and safety matters on site;-preparing reports as required;-resolving any unexpected technical difficulties and other problems that may arise.
-
Site Engineer TraineeHbk Contracting Company W.L.L Jun 2014 - May 2015Qatar-checking plans, drawings and quantities for accuracy of calculations.-ensuring that all materials used and work performed are as per specifications.-planning the work and efficiently organizing the plant and site facilities in order to meet agreed deadlines;-overseeing quality control and health and safety matters on site;-preparing reports as required;-resolving any unexpected technical difficulties and other problems that may arise.
Ahmed Tawfik, Pmp® Education Details
-
Civil Engineering
Frequently Asked Questions about Ahmed Tawfik, Pmp®
What company does Ahmed Tawfik, Pmp® work for?
Ahmed Tawfik, Pmp® works for Zetaş Zemi̇n Teknoloji̇si̇ A.ş.
What is Ahmed Tawfik, Pmp®'s role at the current company?
Ahmed Tawfik, Pmp®'s current role is Project Manager.
What schools did Ahmed Tawfik, Pmp® attend?
Ahmed Tawfik, Pmp® attended Qatar University.
Not the Ahmed Tawfik, Pmp® you were looking for?
-
Ahmed Tawfik, PMP®
Mep Project Manager L Construction Manager L Senior Mep EngineerRiyadh, Saudi Arabia -
-
-
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial