Aini A.Hamid

Aini A.Hamid Email and Phone Number

Quality Assurance Quality Control Engineer @ China Communications Construction Co., Ltd.
Aini A.Hamid's Location
Perak, Malaysia, Malaysia
About Aini A.Hamid

Deadline driven and quality focused with 11 years of work experiences in construction of tunneling, power plant (Coal & Solar Photovoltaic), sewerage pipeline and highway project. Skilled interpersonal communicator in able to successfully manage subcontractor and coordinate site arrangement aspect. Able working independently and committed in providing high quality service to every project with focus on safety, health, environmental and quality issues.

Aini A.Hamid's Current Company Details
China Communications Construction Co., Ltd.

China Communications Construction Co., Ltd.

View
Quality Assurance Quality Control Engineer
Website:
chec.my
Employees:
76
Aini A.Hamid Work Experience Details
  • China Communications Construction Co., Ltd.
    Quality Assurance Quality Control Engineer
    China Communications Construction Co., Ltd.
  • Chec Construction (M) Sdn Bhd
    Quality Assurance Quality Control Engineer
    Chec Construction (M) Sdn Bhd Dec 2021 - Present
    Penang, Malaysia
  • Ditrolic Solar
    Project Engineer
    Ditrolic Solar Aug 2020 - Jun 2021
    The works include of pegging & surveying, pile ramming for substructure, pull out test of working piles, structure installation, photovoltaic module installation and to ensure all QAQC documentation been adhere as per project requirement and specification.• Prepare documentation for the contract deliverable as per requirement & specification needed.• Liaise with surveyor on the site setting out and as built in order to commence the works and the completion of works.• Compile every detail data survey in order to pre-plan on the work area involved• Overall coordination, review and prepare documents for supervision consultant approval based on specification and standard• Prepared Project Quality Plan, and in charge in documentation such as Request for Inspection (RFI), Non-Conformance Report (NCR), Technical Query/Clarification Request Form, Site Observation Report, Material Submission, etc• To attend meeting for QAQC and Safety ensure the documentation and site condition as per specification.• Arrangement with consultant, client & subcontractor for the updated progress meeting and monthly claim for commercial purpose.• Liaison with all authorities with regards to permitting matters from submission up to approval obtained.CONSTRUCTION BACKGROUNDPERSONAL DETAILS
  • Raps Solutions Sdn Bhd
    Project Engineer
    Raps Solutions Sdn Bhd Jul 2019 - May 2020
    The works involves in preliminary works such as permitting and approval by the local authorites on the design and the work permit.• Prepare documentation for the contract deliverable as per requirement & specification needed.• Liaise with surveyor on the site setting out and as built in order to commence the works and the completion of works.• Compile every detail data survey in order to pre-plan on the work area involved• Overall coordination, review and prepare documents for supervision consultant approval based on specification and standard• Prepared Project Quality Plan, and in charge in documentation such as Request for Inspection (RFI), Non-Conformance Report (NCR), Technical Query/Clarification Request Form, Site Observation Report, Material Submission, etc• To attend meeting for QAQC and Safety ensure the documentation and site condition as per specification.• Arrangement with consultant, client & subcontractor for the updated progress meeting and monthly claim for commercial purpose.
  • Dhaya Maju Infrastructure (Asia) Sdn Berhad (385996-H)
    Project Engineer
    Dhaya Maju Infrastructure (Asia) Sdn Berhad (385996-H) Dec 2017 - Jul 2019
    Responsible for the construction of 15 nos bridges (RUB – 5 nos, ROB – 4 nos, BR – 6 nos), Vehicular Box Culvert (17nos) and to ensure all QAQC element and documentation been adhere as per project requirement and specification.• Prepare documentation for the contract deliverable as per requirement & specification needed.• Survey works on the alignment of the project. Identified location of the bridge, VBC and box culvert.• Prepare documentation for the preliminary works needed before the commencement of works at site (Method Statement, Project Quality Plan)• Identified utilities involved for every work area and prepare execution plan• Identified access in order to enter the project alignment• Prepare daily/weekly & monthly report for top management review/approval• Attended every technical/progress meeting with JV and consultant• Compile every detail data survey in order to pre-plan on the work area involved• Produce shop drawing of the pile numbering & coordinate for bridge• Raised clarification/technical query for any discrepancies information/data received• Overall coordination, review and prepare documents for supervision consultant approval based on specification and standard.• Lead the process of material testing such as low relaxation test (pile strand), proof load test (culvert), tensile test, bend & re-bend test, dye penetration test (pile joint) and other test for soil/sand/aggregate test (loss of ignition test, FDT, CBR Atterberg, Sieve Analysis)• Periodically onsite and offsite for factory visit, site visit and outsourced testing for construction materials.• Prepared Project Quality Plan, QAQC Monthly Report and in charge in documentation such as daily report, Request for Inspection (RFI), Non-Conformance Report (NCR), Technical Query/Clarification Request Form, Site Observation Report, Material Submission, and Concrete Summary
  • Eiscon Construction Sdn Bhd
    Project Engineer
    Eiscon Construction Sdn Bhd Jul 2017 - Nov 2017
    Responsible for the open & cut installation of the communal septic tank for government and school premises. Divided into 4 zone and working closely with the government authority and subcontractor to ensure all the technical requirement, documentation and safety regulation are comply before the commencement of works at site accordingly• Arrangement with consultant, client & subcontractor for the updated progress meeting and monthly claim for commercial purpose.• Attended every joint measurement carried out by JPP and subcontractor for every installation for claim purpose.• Involved in site arrangement and liaise with subcontractor on the site planning/problem in order to ensure the work at site is as per work program.• Coordinate with surveyors, traffic, safety & reinstate team for site arrangement• In charge in preparing and arranging the material, machineries, equipment and tools for site usage.• To prepare/review the operation documentation (RFI/Daily report/Monthly report/PTW/work records)• Liaise with designer, contractor and consultant for any technical issue• To review/check on the drawing and issue queries to designer• Liaise with surveyor on the site setting out and as built in order to commence the works and the completion of works.
  • Wzs Ken Keong Sdn Bhd
    Project Engineer
    Wzs Ken Keong Sdn Bhd Nov 2015 - Jun 2017
    Privatisation of Lebuhraya Persisiran Pantai Barat (Taiping-Banting) Section 9 - Kampung Lekir Interchange to Changkat Cermin Interchange
  • Alstom Power System - Cmc Machipex Sdn Bhd
    Civil Engineer
    Alstom Power System - Cmc Machipex Sdn Bhd Nov 2013 - Jul 2015
    Teluk Rubiah
    Project Background- Client : TNB Jana Manjung - Stesen Janakuasa Sultan Azlan Shah-Project : 1 x 1000MW Coal Fired Power Plant Project - Project Cost : $1.7 billion - Responsible Area: Coal Handling System (Stacker & Reclaimer, Coal Handling Control Building, Coal Electrical Room, Coal Yard Drainage system), Pipe Rack Foundation, Run Off Basin, Sanitary Waste Water Treatment Plant and Underground Network & Utilities Responsible for working closely with subcontractor on various constructions, updating progress, planning work schedule and monitoring subcontractors manpower, plant & machinery, material and equipment for the progress estimation. Ensuring subcontractor comply all the requirement of technical documentation and safety regulation before the commencement of work at site. Liaise with employer engineer/inspectors on the inspection of works, technical meeting or discussion, technical documentation and drawings submission, work permit and solving/reviewing any technical query on design as per site condition.
  • Mmc Gamuda Kvmrt (T) Sdn Bhd
    Technical Assistant
    Mmc Gamuda Kvmrt (T) Sdn Bhd Apr 2013 - Nov 2013
    Escape Shaft 3, Bulatan Pandan
    Project Background - Client : MRT Corp-Project: Mass Rapid Transit - Underground/Tunnel Department- Project Cost : MYR 8.28 billion -Responsible area : Site preparation, Fissure Grouting, Secant Bored Piles Works and Drill & Blast for shaft miningLiaise with Contract and Commercial Department on the sub-contractors tender process and arrangement on the internal material and equipment for site usage and utilities. Supervising and monitoring subcontractor on site constructions, attending on the inspection of works, updating progress, planning work schedule and monitoring subcontractors manpower, plant & machineries, material and equipment for the progress estimation. Ensuring subcontractorcomply all the requirement of technical documentation and safety regulation before the commencement of work at site. Liaise with client on the testing, technical meeting or discussion, technical documentation and drawings submission, work permit and solving/reviewing any technical query on design as per site condition. Responsible in assist engineer preparing the documentation and relevant submission to client for progress and monthly internal/external audit.
  • Mmc Gamuda Joint Venture
    Technical Assistant
    Mmc Gamuda Joint Venture Jul 2010 - Apr 2013
    Berapit Tunnel, Electrified Double Track Project
    Project Background- Client : KTM Berhad-Contract Type : Design and Build-Total Project Cost : RM12.5 BillionBerapit Tunnel Main Features:- Twin- bore single track tunnel- 3 different method; Cut & Cover Method for portals, Microtunelling Technique for under passing the highway and Drill & Blast method for 2.3km under Berapit Hills, Tunnel Control Building & Tunnel Plant RoomAssist engineer in supervision and arrangement on the technical documentation, plant & machinery, material & equipment for the site usage. Responsible in produced and updated drawing that related as per site condition. Liaise with surveyors on the coordination, site preparation and as built drawing. Experience with local authority (LLM/PLUS) for the technical documentation and permit approval of blasting works under highway. Assist engineer in monitoring and preparing the monthly report for local authority review. Participate in every presentation for authorities site visit on the information and the method for construction of tunnel. Attending any training for authorities’ requirement.

Aini A.Hamid Education Details

  • University Teknologi Malaysia
    University Teknologi Malaysia
    3.13 On Scale 4.0
  • Kolej Kemahiran Tinggi Mara Pasir Mas,Kelantan
    Kolej Kemahiran Tinggi Mara Pasir Mas,Kelantan
    Civil Engineering
  • Smk Teknik Taiping
    Smk Teknik Taiping
    Spm Level
  • Smk Convent Taiping
    Smk Convent Taiping
    Pmr Level

Frequently Asked Questions about Aini A.Hamid

What company does Aini A.Hamid work for?

Aini A.Hamid works for China Communications Construction Co., Ltd.

What is Aini A.Hamid's role at the current company?

Aini A.Hamid's current role is Quality Assurance Quality Control Engineer.

What schools did Aini A.Hamid attend?

Aini A.Hamid attended University Teknologi Malaysia, Kolej Kemahiran Tinggi Mara Pasir Mas,kelantan, Smk Teknik Taiping, Smk Convent Taiping.

Who are Aini A.Hamid's colleagues?

Aini A.Hamid's colleagues are Mr.law Yok Hock, Mohamed Lamine, Luis Silva, Mohd Hafiz Mohd Ghazali, Souna Salah, Hasrundin Wahi, Muhammad Ariff Bin Mohd Rosli.

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.