Maintenance Engineer To Dy. Maint. Manager
Indian Oil Corporation Limited (Bongaiagon Refinery- An Unit Of Refinery Division)
Dhaligaon,
Sectional Head of Machine shop which also included installation of new machines i.e. Lathe Machine, Grinding Machines, Shaping Machine in Central Workshop. As a part of daily routine work, scrutiny of Work Orders from Field maint, groups, prioritisation of Work Orders, selection of material, methods of repair and cutting tools. During the period, also took up assignment of Mobile Equipment & Rigging Section of Central Workshop which extends rigging / lifting facilities to Fields… Show more Sectional Head of Machine shop which also included installation of new machines i.e. Lathe Machine, Grinding Machines, Shaping Machine in Central Workshop. As a part of daily routine work, scrutiny of Work Orders from Field maint, groups, prioritisation of Work Orders, selection of material, methods of repair and cutting tools. During the period, also took up assignment of Mobile Equipment & Rigging Section of Central Workshop which extends rigging / lifting facilities to Fields Maintenance Group as per planning / requirement.Achievement during the period:a) Developed methodology for fabrication of Exchanger Tube sheet for the first time in Bongaigaon Refinery and thereafter fabrication of spare tube bundle as stand by for reduction of plant shut-down period.b) Took up machining of turbine shaft and Commutator of Bongaigaon Refinery Captive Power Plant for the first time which improved in reduction of vibration of turbine and current flow. Further took up machining of compressor value seats. All machining were carried out at situ with self developed attachments and cutting tools.c) Also took up special repair assignment for repair of Flaker Drum shaft within tolerance limit of +-0.4 mm because of which import of spare Flaker Drum from Germany could be avoided. d) During the period in Mobile Equipment & Rigging Section, Documentation for standardization of various types of vehicles, Welding Machines, tubes, tyres, belts, water pumps, self-starters etc. was carried out. e) Took up special assignment for codification of all equipment / parts of equipments of entire “Central Workshop” which totalled to approx. 25,000 items.f) Developed Documentation for recording keeping against Repair of Equipment / Vehicles / Fire Tenders/ Cranes etc. for assessment of Maintenance Cost. Show less