Aki Inkilä

Aki Inkilä Email and Phone Number

Project Manager @ kW-set Oy
Kirkkonummi, FI
Aki Inkilä's Location
Kirkkonummi, Uusimaa, Finland, Finland
About Aki Inkilä

At the moment I'm looking for new career possibilities.I have more than 12 years of experience as a project work engineer and manager in different kinds of companies like (Outotec, ABB, John Crane and Linde Gas). During my career, I have also been involved in developing various types of production processes closely together with the customer. With these development measures, we have achieved, among other things cost savings and efficiency. Development is one of my strengths because I have ideas that I want to implement. My goal is to improve operations continuously. My education is in mechanical engineer automation and information management technology AMK. Along with the work, I have also studied various qualifications related to work. Specialization, such as the ABB Project Manager Certificate and Work supervisory training.I'm looking for a project work or also a supervisor or expert work where I could apply everything I've learned during my 25-year working career and use this work experience to develop into a professional in the field. I also have a desire to learn new things when the work requires it. I am willing to travel if necessary.

Aki Inkilä's Current Company Details
kW-set Oy

Kw-Set Oy

View
Project Manager
Kirkkonummi, FI
Website:
kwset.fi
Employees:
32
Aki Inkilä Work Experience Details
  • Kw-Set Oy
    Project Manager
    Kw-Set Oy
    Kirkkonummi, Fi
  • Linde Europe North
    Project Manager
    Linde Europe North Oct 2019 - Jun 2024
    Espoo Finland
    Gas pipe and equipment installation projects management. Industry customers, Finland areaDesign and management of pipelines, tank stations and equipment installation projects in Finland. The size of the projects varied from a few thousand up to two million euros. I had about 5-10 open projects open at a time in different phases of the project. I participated in various tasks, such as the tasks of the design manager in the design team. Together (mechanics, automation and electrical design), in the team we think together about suitable customized solutions, always for the customer in question. One role was site manager, i.e. to see that the installations are done properly and in the agreed manner and quality. The procurement of equipment and goods was also part of this work. As an example, equipment manufacturing in Europe, from where it was delivered to a customer in Finland, and with this customer we put this equipment into use. The work also included the recruitment of personnel if necessary, for example, in cooperation with (Rejlers), we implemented the commissioning of the equipment at the customer. Cooperation with different stakeholders, such as (sales, warehousing, maintenance, export, invoicing.) Often the work also required participation in these roles in addition to one's own work. In my work, I learned the legalities of the gas industry and got an insight into the different requirements of the job, its different work phases and roles.
  • John Crane
    Reliable Technician
    John Crane Jan 2018 - Oct 2019
    Lohja Area, Finland
    The SAPPI Kirkniemi factory has about 2,000 mechanical seals. The prices of these range from hundreds of euros to several thousand euros per piece. My task was to find out the costs of these seals on a monthly basis and monitor the development of the costs by reporting the situation to the SAPPI Kirkniemi factory every month. The purpose was to present production improvement proposals to the factory, always on a per-seal basis.According to this, the factory, in cooperation with John Crane, was able to develop the process and reduce the costs arising from the replacement of seals, thus saving the workers' time and also verifying the functionality of the factory.This was a project-based assignment for the client Sappi kirkniemi.
  • Abb
    Project Manager
    Abb Aug 2013 - Jan 2018
    Helsinki Metropolitan Area
    Project Manager GTSC, Warranty and Technical support projects. (Wind power, Generators, Induction motors).At work, I handled the maintenance, repair, and warranty issues of ABB motors, generators and wind generators in cooperation with the warranty team. My first area of ​​responsibility was induction machines and wind generators, from which the responsibility expanded to synchronous motors and generators. There were customers in a way. (Wärtsilä, ABB Marine, and various wind farm customers) globally. When a customer has a broken or faulty product in the world, this is where my work with the customer begins with the necessary warranty repair, maintenance, or spare parts. that's how the work ended, procurement of repair work force from Finland or the target country, procurement of spare parts, and delivery to the site. The most important thing is guaranteeing customer satisfaction and customer service.
  • Abb
    Work Supervision
    Abb Apr 2012 - Oct 2013
    Helsinki Metropolitan Area
    Product line work supervisor, Stator manufacturing 15 workers, The work included the 4 basic stages of the stator package manufacturing (laying, welding, turning, and finishing) in addition to work safety as a very important issue, which I considered training every day in the morning opening. At work, an opinion on managing people and working in a production environment, as well as the different stages of electric motor manufacturing. The measurement technique also became familiar in the final measurement of the stator package and from a quality perspective.01.04.2012-01.10.2013
  • Abb
    Project Engineer
    Abb Jan 2011 - Mar 2012
    Helsinki Area, Finland
    Project engineer ABB Oy/Barona, 03.01.2011-31.3.2012. Customer projects world wide.This job was coordination work and customer service for the manufacture of new electric motors (induction). I collaborated with e.g. with design, logistics, export and production. Sales offices in different countries around the world delivered the motor to the customer and they roughly specified the motor to ABB's system. In practice, they gave limit values ​​for performance and dimensions as well as features and accessories. The information about this was transferred electronically to the Helsinki factory, and the design of the machine began in practice at the Helsinki factory. After that, my tasks included customer contacts and communication about manufacturing, as well as organizing the FAT test at the factory, where the customer often came to watch the test. The tests lasted from one day to about a week if we also tested frequency converters and transformers. If some shortcomings appeared during the test, it was part of my job to agree on them with the production and the customer.
  • Outotec
    Project Engineer
    Outotec Oct 2008 - Jun 2010
    Espoo
    Project engineer, ore concentration projects, Outotec Minerals Oy, I cooperated with different project managers in Outotec's new equipment delivery projects on the Minerals side, working with flotation equipment. My tasks included coordination of stakeholders (design, spare parts, forwarding, warehouse), project-time documentation, document creation, scheduling and cooperation with project managers, whatever was required in the project in question.
  • Outotec
    Sales Engineer
    Outotec Sep 2005 - Oct 2008
    Espoo, Uusimaa, Finland
    Analysis of Outotec's customers spare part needs. Spare part orders, deliveries and customer service as a product of Minerals processing.I work on the Minerals side with flotation equipment, mainly in clearing customer spare parts inquiries and making offers to Outotec's customers worldwide. At work, I found out the customer's need for spare parts and a modern, suitable product for them. The spare parts were electrical or mechanical components, and there were also special spare parts for products requiring Outotec's special expertise, such as metallurgical reference tubes and X-ray tubes. At work, I cooperated with both internal and external stakeholders such as (handling, planning, projects, subcontractors)Sometimes it was also necessary to find new suppliers if it was a part that was no longer manufactured.
  • Outotec
    Sales Engineer
    Outotec Feb 2004 - Sep 2005
    Espoo, Uusimaa, Finland
    I work on the Ferro and Metallurgical side, mainly in solving customer spare parts inquiries and making offers to Outotec's customers worldwide. At work, I found out the customer's need for spare parts and a modern, suitable product for them. The spare parts were electrical or mechanical components, and there were also special spare parts. At work, I cooperated with both internal and external stakeholders such as (handling, planning, projects, subcontractors)Sometimes it was also necessary to find new suppliers if it was a part that was no longer manufactured.
  • Kaakon Sähkökone Oy
    Electrician, Electric Motor Maintenance
    Kaakon Sähkökone Oy Mar 2003 - Aug 2003
    Lappeenranta Area, Finland
    Electrical motor up keeping, fixing and installation.I did this work in the so-called as a temporary job due to the limited job opportunities in the locality. The work included e.g.Maintenance of electric motors and generators such as (cleaning, bearing changes, winding, painting, testing). The engines were sometimes disassembled at the customer's place and brought to the repair shop for maintenance. In this case, I was able to get to know the customer's production equipment and processes very well.
  • Insinööritoimisto Ser-Plan Oy
    Electrical Designer
    Insinööritoimisto Ser-Plan Oy Jun 2001 - May 2003
    Imatra, Finland
    My work was electrical and automation design work and design procurement and invoicing.I did design work for companies such as (Stora Enso, Imatra Steel, Imatra Kaupunki). The work included, for example, renovation of social facilities, improvement of street lighting, improvement of hood lighting, automation of the heating center. At work, I practically worked for the client, where the work actually took place. I used the AutoCad design program to make the drawings.
  • Imatra Steel Oyj
    Electrification Designer/Electrician, Electric And Automation Department
    Imatra Steel Oyj May 2000 - Aug 2000
    Imatra Area, Finland
    During my studies, I did an internship at Imatra Steel, where I worked as an electrical automation designer trainee and installer. My work included drawing up automation drawings using the AutoCad program. I also participated in the factory modernization project "Bloom casting machine modernization", for which I also did engineering work for the company. At work, I was able to concretely do design and installation and got a good understanding of the operation of the Imatra steel factory. I collaborated with the project staff, installers and foremen in this modernization project. The tasks also included various routine maintenance, when the situation allowed it.
  • Upm Kymmene Kaukas Oyj
    Electrician, Factory Maintenance
    Upm Kymmene Kaukas Oyj May 1999 - Aug 1999
    Lappeenranta Area, Finland
    During my studies, I was an intern at the UPM Kaukaa factory. I work in the electrical and automation installation group of the central repair shop, approx. 30 people. This team did service and maintenance throughout the factory area. At work, I was able to get to know the paper mill and its various parts, from the peeler to the pulp and paper mill. Installations included, for example, replacement or reconnection of broken switches or contactors, central changes, additions of electric motors and safety switches, cleaning of transformers, lamp replacements, etc.
  • Upm-Kymmene Kaukas Oyj
    Automation Supervisor / Electrician
    Upm-Kymmene Kaukas Oyj May 1998 - Aug 1998
    Lappeenranta Area, Finland
    During my studies, I was an intern at the UPM Kaukaa factory. I work as a summer foreman in the electrical and automation installation group of a central repair shop with approx. 30 people. This team did service and maintenance throughout the factory area. At work, I was able to get to know the paper mill and its various parts, from the peeler to the pulp and paper mill. Installations included, for example, replacement or reconnection of broken switches or contactors, central changes, additions of electric motors and safety switches, cleaning of transformers, lamp replacements, etc.

Aki Inkilä Education Details

  • Saimaa University Of Applied Sciences
    Saimaa University Of Applied Sciences
    Mechanical Engineering
  • Electrician
    Electrician
    Sähkövoimatekniikka

Frequently Asked Questions about Aki Inkilä

What company does Aki Inkilä work for?

Aki Inkilä works for Kw-Set Oy

What is Aki Inkilä's role at the current company?

Aki Inkilä's current role is Project Manager.

What schools did Aki Inkilä attend?

Aki Inkilä attended Saimaa University Of Applied Sciences, Electrician.

Who are Aki Inkilä's colleagues?

Aki Inkilä's colleagues are Marko Nurmi, Jukka Kauppinen, Juha Lampi, Mikko Korhonen, Jimi Nurmi, Atte Hietaoja, Kaarlo Valli.

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.