Industrial Engineer
Current• Reduced the cycle time of operation from 2 min to 56 sec by suggesting Cost-efficient shop layout• Implemented Poke-Yoke to prevent rejection of Hood & Fender components before the Sub-component assembly along with Incoming Inspection of raw materials in the warehouse before Stamping.• Established the material testing laboratory at the site and maintaining the material testing documents.• Prepared the quality testing Standard Operating Procedures (SOPs) & quality assurance plan for the complete project.• Implemented DMAIC methodology by assisting Black Belt Champion in reducing Error Rate for data entry from 7% to 3.2%• Analyzed the customer’s decision-making process using statistical approach- Design of Experiments (DOE)