AeroLeads people directory · profile

Alan Walker Email & Phone Number

Engineering Manager at Tree Island Steel at Tree Island Steel
Location: Richmond, British Columbia, Canada 9 work roles 1 school
1 work email found @treeisland.com LinkedIn matched
✓ Verified July 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email a****@treeisland.com
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Engineering Manager at Tree Island Steel
Location
Richmond, British Columbia, Canada
Company size

Who is Alan Walker? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Alan Walker is listed as Engineering Manager at Tree Island Steel at Tree Island Steel, a with 163 employees, based in Richmond, British Columbia, Canada. AeroLeads shows a work email signal at treeisland.com and a matched LinkedIn profile for Alan Walker.

Alan Walker previously worked as Engineering Manager at Tree Island Steel and Maintenance Supervisor at Transcontinental Printing. Alan Walker holds Bachelor Of Applied Science (B.A.Sc.), Electrical Engineering from University Of Waterloo.

Company email context

Email format at Tree Island Steel

This section adds company-level context without repeating Alan Walker's masked contact details.

{first_initial}{last}@treeisland.com
89% confidence

AeroLeads found 1 current-domain work email signal for Alan Walker. Compare company email patterns before reaching out.

Profile bio

About Alan Walker

Experienced Engineering Manager with a demonstrated history of working in the value added metal wire industry. Skilled in Operations Management, Continuous Improvement, Electrical Engineering, Manufacturing, and Engineering Management. Strong engineering professional with a Bachelor of Applied Science (B.A.Sc.) focused in Electrical Engineering from University of Waterloo.

Listed skills include Electrical Engineering, Maintenance Management, Engineering Management, Operations Management, and 5 others.

Current workplace

Alan Walker's current company

Company context helps verify the profile and gives searchers a useful next step.

Tree Island Steel
Tree Island Steel
Engineering Manager at Tree Island Steel
richmond, british columbia, canada
Website
Employees
163
AeroLeads page
9 roles

Alan Walker work experience

A career timeline built from the work history available for this profile.

Engineering Manager

Current

• Engineering Manager – Capital projects; technical services; continuous improvement; cost reduction; energy management. Supervise staff of four. Implemented ~ $4M Capital Projects. Contributed to ~ $2M annual operating cost reduction. • Electrical Engineer – Oversee all electrical projects; electrical maintenance department; major plant shutdowns. Support Technical Safety Electrical Field Safety Representative.• Environmental Manager – Oversee all regulatory compliance requirements (including operating permits): Environment Canada; Ministry of Environment BC; MetroVancouver; City of Richmond; Fisheries Canada.

Aug 2014 - Present

Maintenance Supervisor

Transcontinental Printing

• Maintenance Supervisor – Plant Engineer• Supervise 10 tradesmen; 2 janitors & Manufacturing Purchaser. Currently implementing corporate CMMS for the plant. Manage all outside contractors relating to building & equipment repairs.• Work requests & capital planning, scheduling, and co-ordination all inclusive

Nov 2011 - Jun 2014

Building Operations

University Of Bc
May 2005 - Apr 2011

Engineering Consultant

Sandwell Engineering (B.C. Hydro Seven Mile Dam Completion)

• Managed with a technical writer the completion of the final documentation, video and training manuals for the seismic upgrade to the BC Hydro Seven Mile Dam

Jan 2005 - May 2005

Support Services Manager- Maintenance, Engineering And Technology)

Vancouver, Canada Area

• As a member of the senior management team reporting to the General Manager, managed the Mill’s maintenance (6 staff, 50 unionized trades / steam engineers with an annual budget of $8 million), Engineering (plant engineer, 3 contract designers, an annual budget of $200,000 and capital plan of $3 million) and IT (4 staff, 3 contract employees and an annual budget of $800,000) departments. Achievements include:o Reduced maintenance budget by 25% by reducing manpower/material spending and unplanned equipment breakdowns and by introducing a process for reviewing/approving work orders.o Project managed the Reliability centered maintenance (RCM) proposal. o Reduced electrical energy costs by $150,000 annually and subsequent maintenance costs. Partnered with BC Hydro Power Smart Program to upgrade energy inefficient light fixtures throughout the mill.o Maintained an excellent department safety record: one minor LTA over an 8 year period. This was accomplished by training, accountability (to behavior), due diligence, and zero tolerance leadership.o Part of negotiation team in regards to several successful management-union contractso Contributed to increasing future mill capacity and production capabilities by participating in the following projects: $2M paper grade development (photo inkjet). Advanced the company’s paper making technology by providing input on the design, equipment selection and layout. $100M Upgrade to the #2 paper machine line and the addition of an off - machine coater; Folio sheeter; and Effluent plant.

Jan 2003 - Jan 2004

Continuous Improvement Manager (Engineering Technology)

Vancouver, Canada Area

 As a member of the senior management team reporting to General Manager, managed through a Plant Engineer and Information Technology Manager, the Engineering (5 full-time and contract staff, an annual budget of $500,000 and capital plan of $3.5 million), IT (12 full-time and contract staff and an annual budget of $1.5 million) and Continuous Improvement (3 staff and an annual budget of $300,000) functions. Achievements included:- Identified opportunities to maximize efficiencies, quality improvement, safety and environmental concerns by attending daily production meetings; maintenance on-call support; capital requests; and IT requests.- Coordinated 15 Kaizen-Lean manufacturing projects with an approximate cost savings of $1 M. Projects focused on product quality, productivity, safety, simplify process flow and reduce labor costs.

Jan 2001 - Jan 2003

Production Manager

Vancouver, Canada Area

 Reporting to the General Manager, managed through a Paper Manufacturing Manager and Superintendents of Finishing, Shipping and Warehousing, 12 staff and 250 hourly unionized (CEP) employees and an annual budget of $23 million. Increased profitability and improved the effectiveness of the management team and shop floor performance through the following strategic plant improvements: - Improved operating efficiencies by 2% on all major manufacturing lines and increased sheeting production from 185 tpd. To 210 tpd.- Achieved Environmental and Safety 2000 recognition award for 100% environment compliance and 3rd best safety record.- Reduced cull losses on grade changes and chemical costs resulting in an annual savings of $1 million.

Jan 1999 - Jan 2001

Electrical/Instrument Superintendent

Vancouver, Canada Area

 As Team Leader, advanced the electrical, maintenance and engineering systems into a cross-functional technical team with an active and strong conviction towards accident prevention. Achievements included:- Re-organized Engineering Department. Developed standards and procedures and implemented C.A.D. system, files, drawings, and microfilm completion.- Team member on the following projects: Implementation of a $25 million cover and Bristol grade value added launch: building, re-reeler, rebuilt super calendar and #1 paper machine wet end rebuild (1997); launch of a new grade of paper (major capital investment of $100 million-1990); grade and product development: alkaline paper making conversion (1989).

Jan 1984 - Jan 1999

Maintenance Relief Supervior And Electrical Engineer

Fletcher Challenge (B.C.F.P)

Mackenzie Pulp Division

 Contributing member of the Electrical/Instrument Department consisting of a supervisor, engineer, electrical foreman (crew of 12) and an instrument foreman (crew of 9). Achievements included: - Successfully supervised installation of the electrics and instrumentation for a 20 MW turbo generator on time and on budget.- Redesigned and overhauled the electrics used to control the pulp sheet cutter-layboy and bailing line. A programmable controller was used as part of the redesign.

Jan 1979 - Jan 1984
Team & coworkers

Colleagues at Tree Island Steel

Other employees you can reach at treeisland.com. View company contacts for 163 employees →

1 education record

Alan Walker education

FAQ

Frequently asked questions about Alan Walker

Quick answers generated from the profile data available on this page.

What company does Alan Walker work for?

Alan Walker works for Tree Island Steel.

What is Alan Walker's role at Tree Island Steel?

Alan Walker is listed as Engineering Manager at Tree Island Steel at Tree Island Steel.

What is Alan Walker's email address?

AeroLeads has found 1 work email signal at @treeisland.com for Alan Walker at Tree Island Steel.

Where is Alan Walker based?

Alan Walker is based in Richmond, British Columbia, Canada while working with Tree Island Steel.

What companies has Alan Walker worked for?

Alan Walker has worked for Tree Island Steel, Transcontinental Printing, University Of Bc, Sandwell Engineering (B.C. Hydro Seven Mile Dam Completion), and Domtar.

Who are Alan Walker's colleagues at Tree Island Steel?

Alan Walker's colleagues at Tree Island Steel include Anne-Lise Gourley, Sergio Fernandes, Ehizogie Okogun, Joseph Pawlowski, and Cruz Moya.

How can I contact Alan Walker?

You can use AeroLeads to view verified contact signals for Alan Walker at Tree Island Steel, including work email, phone, and LinkedIn data when available.

What schools did Alan Walker attend?

Alan Walker holds Bachelor Of Applied Science (B.A.Sc.), Electrical Engineering from University Of Waterloo.

What skills is Alan Walker known for?

Alan Walker is listed with skills including Electrical Engineering, Maintenance Management, Engineering Management, Operations Management, Continuous Improvement, Manufacturing, Preventive Maintenance, and Plant Maintenance.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Alan Walker you were looking for.

View similar profiles