Project Team Lead
Moscow, Russian Federation
Work in design institute of vertically-integrated company SUEK.SUEK is one of the world’s largest coal companies and the leading coal producer in Russia. The incumbent position is devoted to execution of project coal preparation and handling plant.Involved in the process, piping, and mechanical engineering in any study of design (pre-feasibility,feasibility, basic and detailed design). 6 people in the group (2 piping engineers, 3 mechanicalengineers and 1 process engineer)- Flowsheets in LIMN software(PFD)- BIM modeling (Equipment arrangement , layout and routing piping in Plant 3D, custom and static equipment and conveyor system in Inventor, clash detector with construction, electrical parts and etc in Navisworks Manage)Key achievements- Construction of a new module at the Tugnui Coal Preparation Plant, with a capacity of 1000 tons per hour. The total budget was 7 billion rubles. The project was executed using BIM technology, and it was successfully launched in 2019. (Pre-feasibility, Feasibility, Basic and Detail Engineering);- Detail Engineering of a magnetite grinding plant for the Tugnui Coal Preparation Plant. The budget was 250 million rubles. The project was executed using BIM technology, and it was launched in 2017;- Increase Coal Prepapration Plant's production capacity to 12 million tons per year (Feasibility, Basic and Detail Engineering). The total budget was 4 billion rubles. The project was completed in 2020.- Project's state and enviromental expert review:- Testing of new technological equipment at concentrator plants and calculation of economic effects after commissioning;- Creation of a technological team from scratch;