Senior Principal Machinery Engineer
Walton-On-Thames, Uk
I progressed through positions of increasing responsibility since joining the Machinery Engineering team in 2013. During project execution my primary responsibilities were the technical specification, bid evaluation and selection of a broad range of rotating machinery and packaged equipment, post-order engineering documentation review, design verification, integration into the wider facility design and vendor management up to the point of equipment acceptance. I was responsible for the timely production of engineering deliverables according to the project schedule, identification and management of technical risks throughout the project, remaining accountable for all technical aspects of the equipment until successfully installed, commissioned and handed-over to the customer.Types of equipment under my responsibility included centrifugal and positive-displacement compressors, cryogenic pumps, cryogenic turbo-expanders, cooling water systems and packaged process equipment.