Alexander Kammerer

Alexander Kammerer Email and Phone Number

Director Project Management @ FAM GmbH
Brunswick, NDS, DE
Alexander Kammerer's Location
Brunswick, Lower Saxony, Germany, Germany
Alexander Kammerer's Contact Details

Alexander Kammerer work email

Alexander Kammerer personal email

n/a
About Alexander Kammerer

Project management professional with more than 25 years of experience in construction, projects and operations in the Caribbean, Brazil, Mexico and Europe where I gained vast experience in petrochemical, Oil/Gas, steel making, glass industry, sugar industry and now mining. My strengths are analyzing and delivering projects/tasks at all stages from the planning and engineering, procurement assistance, to the installation, commissioning and close-out inclusive of dispute settlement. I am an inspirational leader who not only had the opportunity to apply analytical thinking and experience in projects, more so also in strategical workstreams and operations.

Alexander Kammerer's Current Company Details
FAM GmbH

Fam Gmbh

View
Director Project Management
Brunswick, NDS, DE
Alexander Kammerer Work Experience Details
  • Fam Gmbh
    Director Project Management
    Fam Gmbh
    Brunswick, Nds, De
  • Fam Gmbh
    Director Project Management
    Fam Gmbh Jun 2022 - Present
    Germany
    FAM Minerals & Mining - a Member of the BEUMER GroupExpanded product range including systems for mining, conveying, storage, crushing, homogenizing and loading of minerals, raw materials and goods as well as a range of large-scale equipment and individual machines such as bucket wheel excavators, stacker, reclaimer, ship loaders and crushers for open-cast mines and power plants, metallurgy, the cement industry, the building materials industry, the chemical and fertilizer industry and port handling.
  • Fam Gmbh
    Senior Project Manager
    Fam Gmbh Oct 2020 - May 2022
    Germany
    Main responsibilities within the first 12 months were focused on strategic objectives such as but not limited to Design-to-Cost approaches for projects and products to close the gap between targeting costs and actual costs; company strategies to enhance global project management as well as co-author of a global Project Management Manual. Beside those strategic tasks the responsibility for an EPCM Project in Serbia, a stacker reclaimer with tripper was assumed mid-2021. The challenges are to deliver the complex state-of the are mining equipment within a constrained time frame.In-house training:• 15/16.10.2021 Leadership training• 02.08.2021 Compliance Training
  • Ak Engenharia E Projetos Ltda
    Senior Project Manager (Food Industry)
    Ak Engenharia E Projetos Ltda Oct 2018 - Sep 2020
    Germany/Middle East
    BMA Braunschweigische Maschinenbauanstalt AG (https://www.bma-worldwide.com/)Senior Project Manager for a large-scale sugar plant in the Middle East, consisting of basic engineering, detail engineering, supply of equipment for the process plant including lime kilns and power plant. Within the first year, the project was transformed into a profitable order through proactive implementation of alternative technical solutions, altered purchasing strategies and rigorous project controls.
  • Ak Engenharia E Projetos Ltda
    Site Manager (Glass Making)
    Ak Engenharia E Projetos Ltda Aug 2018 - Sep 2018
    Tehran Province, Iran
    HEYE International GmbH (https://www.heye-international.com/)@ NAFIS Glass in Takestan, Iran Site management for IS machine commissioning for the hot end glass container fabrication at NAFIS Glass Co. in Takestan, Iran.
  • Ak Engenharia E Projetos Ltda
    Site Engineering (Glass Making)
    Ak Engenharia E Projetos Ltda Feb 2018 - Sep 2018
    Veracruz Area, Mexico
    HORN Glass Industries AG (https://www.hornglass.com/)@ SIVESA Vidriera in Veracruz, Mexico Site Supervision for the installation of recuperators, steel structure and combustion air piping of the glass furnace for the container glass fabrication at SIVESA Vidriera in Veracruz, Mexico, inclusive of spot contracts. HORN Glass Industries AG, a German specialist in the design and supply of complete glass melting technology is a solution partner for the worldwide glass industry.
  • Ak Engenharia E Projetos Ltda
    Country Manager
    Ak Engenharia E Projetos Ltda Apr 2017 - Sep 2018
    Rio De Janeiro Area, Brazil
    PNEUMOFORE S.p.A. (http://www.pneumofore.com/) @ representation in Brazil ak Engenharia e Projetos represents PNEUMOFORE– with 50 employees – who develops the rotary vane design in the production of industrial air compressors, and vacuum pumps.
  • Ak Engenharia E Projetos Ltda
    Country Manager
    Ak Engenharia E Projetos Ltda Jan 2017 - Sep 2018
    Rio De Janeiro Area, Brazil
    LWN do Brasil Ventilacoes LTDA (http://www.lwn-lufttechnik.de/index2.php)@ representation in LATAM ak Engenharia e Projetos represents LWN – now with 60 employees – who delivers ventilations and cooling systems for German and international container and flat glass industries. 2018/2019: supply and installation contract at AGC Vidros do Brasil in Guaratinguetá/SP
  • Ak Engenharia E Projetos Ltda
    Site Management (Glass Making)
    Ak Engenharia E Projetos Ltda Oct 2017 - Jan 2018
    Chihuahua Area, Mexico
    HEYE International GmbH (https://www.heye-international.com/)@ VICHISA Vidriera in Chihuahua, Mexico Site management for IS machine installation for the hot end glass container fabrication at VICHISA Vidriera in Chihuahua, Mexico.
  • Ak Engenharia E Projetos Ltda
    Technical Consultant (Glass Making)
    Ak Engenharia E Projetos Ltda Jul 2016 - Dec 2016
    Rio De Janeiro Area, Brazil
    HEYE International GmbH (https://www.heye-international.com/)@ Ambev Vidros in Rio de JaneiroConsulting service for troubleshooting, warranty issues as well as technical and administrative services.
  • Ak Engenharia E Projetos Ltda
    Site Manager (Glass Making)
    Ak Engenharia E Projetos Ltda Apr 2015 - Dec 2016
    Rio De Janeiro, Brazil
    HEYE International GmbH(https://www.heye-international.com/)@ AMBEV Vidros - Rio de Janeiro, Brazil Site management for IS machine installation for the hot end glass container fabrication at AMBEV Vidros in Rio de Janeiro. Consulting service for troubleshooting, warranty issues as well as technical and administrative services on Spot contracts. HEYE International, based in Germany is one of the foremost suppliers of production technology, high performance equipment and know-how for the container glass industry worldwide.
  • Thyssenkrupp
    General Manager (Steel Making)
    Thyssenkrupp Feb 2014 - Oct 2014
    Rio De Janeiro Area, Brazil
    Central Maintenance, Engineering & InfrastructureResponsible for management and coordination of the centralized maintenance of the Steel Complex pursuing the best technical/economical solution optimizing the resources and assuring the adherence of the maintenance strategy/policy in the whole Complex. Management of the centralized Engineering Department being responsible for the Capital Expenditures projects implementation to support a sustainable growth of the company for a competitive environment of technology and cost effective operation. The main aims are the cost optimization of all processes, the minimizing of the capital employed, supporting the availability of the production, maintaining a good performance of the equipment with a safe operation for the employees and plants. OPEX Volume 250mn US$/year including onsite workshops, shutdown, frame contracts, etc. to manage the overall maintenance and to shift from the corrective maintenance towards a higher degree of preventive and predictive maintenance. Implementation of KPI for Engineering and Maintenance departments.
  • Thyssenkrupp
    Head Of Plant Engineering (Steel Making)
    Thyssenkrupp May 2012 - Jan 2014
    Rio De Janeiro Area, Brazil
    Plant Engineering and InfrastructureManagement of the Plant Engineering department, responsible to develop and later to implement CAPEX projects (190mn US$/year). Integration of technical solutions and supporting the individual production areas in improving plant performance and reliability.
  • Thyssenkrupp
    Construction Manager (Steel Making)
    Thyssenkrupp Oct 2010 - Apr 2012
    Rio De Janeiro Area, Brazil
    Coking Plant (CCP)Erection and commissioning of two (2) Heat-Recovery Coking Batteries with steam boilers and FGD (Flue Gas Desulfurization). Involvement in purchase, commercial and dispute management. Investment volume 250mn EUR/Battery.
  • Thyssenkrupp
    Head Of Piping Department (Steel Making)
    Thyssenkrupp May 2009 - Sep 2010
    Rio De Janeiro Area, Brazil
    Steel Making Plant (SMP)Installation, pressure testing and commissioning of all media systems in BOF steel plant. Involvement in engineering, purchase, commercial and claim management.
  • Carillion
    Senior Project Manager (Oil/Gas)
    Carillion May 2007 - Apr 2009
    Trinidad And Tobago
    NHT & CCR platformer project at Petrotrin RefinerySenior Project Manager for the erection of two (2) substation buildings, instrument rack room, compressor steel structure, civil foundations, underground ducts and cable trenches; process piping fabrication, installation and testing; and site painting of plant components and piping for the NHT & CCR Platformer Complex Project.Client: Samsung Engineering.
  • Carillion
    Project Manager (Oil/Gas)
    Carillion Mar 2007 - Apr 2007
    Trinidad And Tobago
    PPGPL Gas Processing plant expansion IIIProject Manager responsible for site preparation, roads and drainage, civil foundations and underground services. Claims resolution and mitigation.Client: Black & Veatch.
  • Carillion
    Project Manager (Oil/Gas)
    Carillion Oct 2006 - Feb 2007
    Trinidad And Tobago
    Regional Head Quarter (RHQ)Preparation of proposals and bid valuations for Methanex Industrial Maintenance Service Contract, Petrotrin Turnaround Service Contract, Petrotrin Gasoline Optimization, etc.In-house training: FIDIC, Primavera P6 and NEBOSH
  • Mce Gmbh
    Senior Site Manager (Oil/Gas)
    Mce Gmbh Sep 2003 - Aug 2006
    Trinidad And Tobago
    Atlantic LNG Train 4Senior Site Manager for the mechanical erection of a 160,000m3 LNG double-wall storage tank inclusive of associated structures, piping, insulation, painting, E&I, and commissioning in a JV with TKK, Dywidag and MCE for Bechtel Oil & Gas. The team achieved 865,000 man-hours without any LTA or OSHA Recordable with a manpower peak of 285 employees and several smaller lower-tiers.Client: Bechtel International.In-house training: OSHA 40h.
  • Mce Gmbh
    General Manager – Gopeesingh General Contractor Ltd
    Mce Gmbh May 2002 - Aug 2003
    Trinidad And Tobago
    Gopeesingh General Contractor LtdResponsible for the operation of Gopeesingh General Contractors (1990) Limited in respect of the rental of cranes, articulating boom trucks, forklifts, truck and trailers, etc. as well as general administration of the staff and equipment.Clients: BP, BG, EOG Resources, BHP Billiton, Schlumberger, Haliburton, etc.
  • Mce Gmbh
    Engineering/Operations Manager (Petrochemical)
    Mce Gmbh Sep 2000 - Apr 2002
    Trinidad And Tobago
    Regional Head Quarter RHQ (VA TECH MCE)Overseeing technical aspects, preparation of proposals and bid valuations for ATLAS Methanol Project (5000mtpd), ACST Ammonia Project (2*2300mtpd), Debottlenecking-Project at ALNG Train 1, ANSA-MCAL Ammonia Project Trinidad (2*1850mtpd), Installation of Compressor Train at ASU ATLAS, LNG Tank for ALNG Expansion Project Train 4, Freeport LNG Terminal in Grand Bahamas and several small construction and engineering inquiries.
  • Mce Gmbh
    Engineering Manager (Petrochemical)
    Mce Gmbh Jul 1998 - Aug 2000
    Trinidad And Tobago
    Titan Methanol (VA TECH MCE)Responsible for all rotating equipment installation, alignment, commissioning and setting up maintenance procedures. Responsible for refractory lining for Reformers, Secondary Reformers, Heat Recovery Systems and Boilers. Technical calculations, designing and studies for heavy lifts. Client: Lurgi Oil, Gas und Chemie.

Alexander Kammerer Skills

Commissioning Construction Petrochemical Factory Lng Project Engineering Inspection Steel Epc Project Control Asme Construction Safety Primavera P6 Ms Project Refinery Gas Cpm Scheduling Project Estimation Supervisory Skills Safety Management Systems Mechanical Engineering Cost Management Engineering Management Steel Structures Oil/gas Cost Engineering Process Control Oil And Gas Industry Cost Control Subcontracting Project Management Engineering Project Planning Contract Management Piping Construction Management

Alexander Kammerer Education Details

Frequently Asked Questions about Alexander Kammerer

What company does Alexander Kammerer work for?

Alexander Kammerer works for Fam Gmbh

What is Alexander Kammerer's role at the current company?

Alexander Kammerer's current role is Director Project Management.

What is Alexander Kammerer's email address?

Alexander Kammerer's email address is a.kammerer@gmx.at

What schools did Alexander Kammerer attend?

Alexander Kammerer attended Johannes Kepler Universität Linz, University Of California, Los Angeles, Hohere Technische Bundeslehranstalt Linz Ii.

What skills is Alexander Kammerer known for?

Alexander Kammerer has skills like Commissioning, Construction, Petrochemical, Factory, Lng, Project Engineering, Inspection, Steel, Epc, Project Control, Asme, Construction Safety.

Not the Alexander Kammerer you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.