Project Manager
CurrentProject Manager; March 2013 to PresentDelphinus Engineering, Inc., Honolulu, HI; Delphinus’ local manager in Honolulu, HI supporting NSWCCD-SSES and SPAWAR C4ISR projects overseeing skilled and unskilled trades and subcontractors. Accomplishes shipboard repairs, alteration installations, engineering site surveys and ship checks, material support, documentation, and QA requirements for the alteration, repair, and maintenance of HME&E system improvements. Significant accomplishments include but are not limited to:• As a subcontractor to Consilium Marine US Inc., installed a USCG/ABS approved addressable fire detection system (FDS) current to USCG/SOLAS requirements onboard the NOAA ship Hi'ialakai. Oversaw the ripout of the existing FDS components including detectors, manual pull boxes, and control panels. Oversaw the installation of the upgraded Consilium Common Product (CCP) FDS comprised of 132 detectors and pull boxes. Components were divided between 4 Loop Zones throughout the ship. Assisted in testing the installed FDS.• Installation of the upgraded Consilium Common Product (CCP) FDS comprised of 132 detectors and pull boxes. Components were divided between 4 Loop Zones throughout the ship.• SCDs 74401 and 78296, (Vertical Package Conveyor) onboard the USS Boxer (LHD-4) and USS Makin Island (LHD-8)• SCD 11513 (HYDRA) onboard the USS New Orleans (LPD-18)• SHIPALTs 75360K (CBSP), 78546K (CENTRIX), 74470K (AN/URN31), 775915K (ADNS), 71418K (SVFNBDT), 78753K (NMT), and 81275K (GBS) onboard the USS Michael Murphy (DDG-112)• SHIPALTs 77279K (CANES), 78753K (NMT), and 81275K (GBS) onboard the USS Chafee (DDG-90)• SCD 81266 (Shore Power Modifications) onboard the USS Chafee (DDG-90)• SHIPALT DDG51-1097 (ICAS Tech Refresh) onboard the USS Preble (DDG-73)• Rip-out and Installation of Upgraded Berthing and Sanitary Spaces onboard the USS Hopper (DDG-70)