Ali Farooq

Ali Farooq Email and Phone Number

Director at Techstar - Smart Solutions @ Techstar - Smart Solutions
8-B, Sadeed Plaza, Commercial Zone, Canal View Housing Society, Lahore,Punjab 54000,Pakistan
Ali Farooq's Location
Lahore District, Punjab, Pakistan, Pakistan
About Ali Farooq

Dynamic, detailed, and results-oriented Electrical Engineer with almost 6 years of hands-on experience in field for Repair & Maintenance of Gas Gensets, all types of Electrical control and Power Circuits, Magnetic Contactors and Relays. Having demonstrated record of maximizing productivity while minimizing expenses in operations. Innovative and analytical professional who is able to grasp the big picture. Reputable for designing and implementing ideas plus strategies that drive process efficiency improvements. Effective problem solver with experience in all types of Operation Skills, Fault Tracing, Repairing, Troubleshooting etc. Committed to add value and exceed expectations through hard work, determination and persistence with demonstrated expertise.

Ali Farooq's Current Company Details
Techstar - Smart Solutions

Techstar - Smart Solutions

View
Director at Techstar - Smart Solutions
8-B, Sadeed Plaza, Commercial Zone, Canal View Housing Society, Lahore,Punjab 54000,Pakistan
Website:
techstar.com.pk
Employees:
2
Ali Farooq Work Experience Details
  • Techstar - Smart Solutions
    Director
    Techstar - Smart Solutions May 2018 - Present
    Lahore, Pakistan
  • University Of Sargodha
    Assistant Controller
    University Of Sargodha May 2016 - Nov 2017
    Lahore
  • Sapphire Fibre Mill
    Shift Engineer
    Sapphire Fibre Mill Aug 2012 - Sep 2015
    Lahore, Pakistan
    Responsibilities included maintaining Power Factor, Peak Load Management, Temperature and Pressure Parameters, PH and TDS of Cooling Tower Water. Conducting parallel operation of Gas Engines (Synchronize) and with Diesel Engines. Successfully maintained Power Factor, Peak Load Management, Temperature and Pressure Parameters, PH and TDS of Cooling Tower Water.Other responsibilities included, preparing the Hourly Generation Report, Log Book and Monthly Generation Report. Developed knowledge about the Electrical Fault Finding and Electrical Diagram. And carried out maintenance of Electrical Equipments. Key Achievements: - Successfully run smooth operation of 1064 Kw 5 Jenbacher Gas Engines (JGS-320).- Maintenance of Gas Engines on Shut down under my direct supervision.
  • Mecmo Industrial Services
    Electrical Engineer
    Mecmo Industrial Services Jan 2012 - Jul 2012
    Lahore, Pakistan
    Responsibly conducted smooth operation of 1450 kw Jenbacher Gas Engine (jgs-420). And of synchronized 845 KW 3 Waukisha Gas Engines (5794 LT). Maintained power factors. Did peak load management. Maintained temperature and pressure parameters. Maintained PH and TDS of Cooling Tower Water. Prepared the log book and shift report. Did electrical troubleshooting and electrical maintenance.Key Achievements: - Meticulously Supervised Engine MCC, Control panels, Manual Synchronizing Panels with Synchronoscope, Woodward 2301d load sharing and speed control module.- Conducted Die.ne XT with B&R PLC operation.- Did Engine MCC, Control panels, auto-synchronizing panel, Motorized ACB.
  • Chawla Alluminium Power Plant
    Electrical Engineer
    Chawla Alluminium Power Plant May 2011 - Dec 2011
    Lahore, Pakistan
    My responsibilities were to supervise the smooth operation of 2 Waukisha Gas Engines in the shift. Peak load management, preparing its log book, maintaining gas engines parameters under control. Developing necessary documentation. Managing engines starting and shutdown when required. Managing distribution of power to different departments. Preparing the log book and shift reports.Key Achievements: - Operation of 755 KW 2 Waukisha Gas Engines (5794 GLD)- L.T Panels Power Distribution to Different Departments.- PLC Operation with Siemens WINCC system.
  • Perc Private
    Electrical Engineer
    Perc Private Apr 2010 - Apr 2011
    Lahore, Pakistan
    Supervised and gave directions according to the project documentation. Managed erection of engines and its related electrical control panels such as switchgears and transformer. Key Achievements: - Installed 2 Rolls Royce Gas Engines, 3.5MW Generators each, at Rupali Polyester Limited Sheikhupura.- Erection and Termination of L.V and M.V Electric Panels and mcc panels.- Control Cable Terminations of Engine and Generator Control Cabinets, Earthing System, Meggering, 3 phase Motor connections.
  • Kohinoor Energy Limited
    Intern
    Kohinoor Energy Limited Feb 2010 - Mar 2010
    Lahore, Pakistan
    Work in Electrical Maintenance department and instrumentation calibration department. Learned how to calibrate different types of switches and sensors. Worked on 124 MW Power Plant with 8 Wartsilla H.F.O Engines. Gained knowledge about the engines running in parallel / synchronized, ONAF ABB Transformers, ABB Alternators, Switch yard, Capacitors Banks, Cooling towers, Unit Transformers, Auxiliary pumps etc.

Ali Farooq Skills

Industrial Automation Plc Programming Project Management Operations Management Integration Of Plc With Hmi Magnetic Contactors And Relays Repair And Maintenance Electrical Systems Generators Maintenance Troubleshooting Fault Tracing English Skills Presentation And Reporting Skills Ms Powerpoint And Ms Excel Internet E Mail Installation Of Softwares And Networking Analytical And Reasoning Skills

Ali Farooq Education Details

  • University Of Management And Technology Lahore
    University Of Management And Technology Lahore
    Cgpa: 3.02/4.00
  • Allama Iqbal Open University Islamabad
    Allama Iqbal Open University Islamabad
    A
  • District Public School & College Okara
    District Public School & College Okara
    Grade: 65%
  • District Public School
    District Public School
    Science

Frequently Asked Questions about Ali Farooq

What company does Ali Farooq work for?

Ali Farooq works for Techstar - Smart Solutions

What is Ali Farooq's role at the current company?

Ali Farooq's current role is Director at Techstar - Smart Solutions.

What schools did Ali Farooq attend?

Ali Farooq attended University Of Management And Technology Lahore, Allama Iqbal Open University Islamabad, District Public School & College Okara, District Public School.

What are some of Ali Farooq's interests?

Ali Farooq has interest in Operations Management, Fault Tracing, Project Management, Troubleshooting, Environment, Education, Electrical Systems, Integration Of Plc With Hmi, Generators Maintenance, Plc Programming.

What skills is Ali Farooq known for?

Ali Farooq has skills like Industrial Automation, Plc Programming, Project Management, Operations Management, Integration Of Plc With Hmi, Magnetic Contactors And Relays, Repair And Maintenance, Electrical Systems, Generators Maintenance, Troubleshooting, Fault Tracing, English Skills.

Not the Ali Farooq you were looking for?

  • Ali Farooq

    Hr Business Partner | Od And Rewards Management | People & Culture | Talent Management | Hr Operations | Employee Engagement | Training And Development | Performance Management | Hr Analytics
    Lahore
    1
    gmail.com
  • Ali Farooq

    Hr Practitioner
    Lahore District
    1
    get.org.pk
  • Ali Farooq

    Managing Partner At Industex
    Pakistan
  • Ali Farooq

    Chief Executive Officer At Gather Labs
    Lahore District
  • Ali Farooq

    Software Project Manager | Product Owner | Agile Methodologies | Scrum
    Lahore

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.