Ali Ibrahim Email and Phone Number
Ali Ibrahim work email
- Valid
Ali Ibrahim personal email
- Valid
Career profile:Ali is a Mechanical Engineer with 19 years of experience in construction management with a strong background in Civil and Electrical engineering. I have been working in the construction of heavy industrial projects for 12 years at senior and managerial levels directing the team and controlling resources to deliver projects’ objectives as per standards and clients’ expectations. Thermal power plants, Sugar factories, and sewage treatment plants are the projects I managed successfully during my work at Orascom Construction Industries Co. (Egypt) and Protec Technical Services Co. (Qatar)After 12 years in the construction of heavy industry projects, I have gone on to work in infrastructure projects for the last 5 years. As a construction manager and project manager at MACE Qatar Co, I have worked in the construction, Snagging, and handing over of surface and groundwater networks in three different major schemes with government entities (Public Work Authority PWA). These three schemes were focused on flood prevention and mitigation in the expansion and/or development of surface and groundwater networks in urban areas. For all the projects I managed to successfully manage the team to deliver the objectives by the baseline schedules, within the budget, and by expected quality and standard set out by the client.I am currently working as an Emergency Service Manager in AVM JV (Aguas De Valencia & Mace JV). where I am leading the complaints office for collective sewer infrastructure Systems CSI in the west of Qatar) with Public Work Authority PWA
Mace Qatar
View- Website:
- mace-qatar.com
- Employees:
- 125
-
Emergency Service Manager - Collective Sewer Infrastructure Systems ( Pwa )Mace Qatar Apr 2020 - PresentDoha, QatarCatchment Zone Framework: Drainage Operation & Maintenance (2020/Present)Client: Public Work Authority, PWAContract Value: 1.07 BEmergency Service Manager of Qatar West Catchment. I’m managing a staff of office, shop, and/or field employees engaged in emergency services I Supervise through subordinate supervisors and engineers the investigation and resolution of customer emergency cases for any failure in the CSI system also irrigation water service failures including short supply, defective draining systems, flooded wastewater assets, malfunctioning surface water network assets where run-off or accumulation of surface water are disrupting the public. In this 24/7 business, I manage the team to ensure the performance and serviceability of collective sewer infrastructure CSI in the West Catchment of Qatar are maintained and functional as per expectations.performing analysis of information that includes fact-finding, organization of material, evaluation of data, and preparation of recommendations either orally or in writingestablish and maintain effective working relationships with associates, administrative officials, and the publicAlso, I am leading the Authority supporting team for processing all kinds of permits like permits to work PTW Also, I am supervising the network protection which controls the FOG / illegal dewatering into the network at the West of Qatar and issue reports about conditions and the functionality of the network enforcing the standards and regulations by educating the business and advising the contractors who disturbing the network on how to comply with Public work authority requirements. -
Project ManagerMace Qatar Mar 2019 - May 2020Doha, QatarProject Name : Flood prevention scheme O&M package 3 (SR-71)Construction of 13.5 Km of surface and ground water network including micro tunnelling with 165 SGW Manholes, 450 Gullies 7 km of gully connections. The purpose of the project to mitigate the flooding of surface water during rain events in urban areas and to reduce the level of water table (Ground Water). Main responsibility was managing the project baseline schedule to ensure the works are assigned and completed on time and within budget with quality standards quality. Laso, as project manager I was committed to:- Lead and supervise the project staff and subcontractors - Estimate the resources needed to achieve project goals- Delegate tasks and responsibilities to appropriate personnel -Track project milestones and deliverables Leading the HSE team for carrying out Risk & Aspect Assessments- Provide reports regarding progress and completion of the works to the client. -
Construction ManagerMace Qatar Apr 2018 - Feb 2019Doha, QatarProject Name : Flood prevention scheme phase 2 package 1 -HS-SR17Construction Manager for Improvement scheme of surface water network in Najma, Corniche and Old Airport areas. The project scope covered construction of 13 Km liner meter of surface and ground water network including micro tunneling with 279 SGW Manholes and 828 Gullies 9 km liner meter of gullies connections. my responsibilities are summarized as followed: -Lead and supervise the project staff and subcontractors - Estimate the resources needed to achieve project goals - Delegate tasks and responsibilities to appropriate personnel -Track project milestones and deliverables - leading as head of the HSE team for carrying out Risk & Aspect Assessments- Provide reports regarding progress and completion of the works to the client. -
Construction ManagerMace Qatar May 2017 - Mar 2018Doha, QatarProject Name : Construction of Surface Drainage network -FPS 14 Construction Manager for construction of 24 Km liner meter of surface and ground water network including micro tunnelling with 440 SGW Manholes and 1093 Gullies 11 km liner meter of gullies connections.For both above mentioned projects my responsibilities are summarised as followed: -Lead and supervise the project staff and subcontractors - Estimate the resources needed to achieve project goals - Delegate tasks and responsibilities to appropriate personnel -Track project milestones and deliverables - leading as head of the HSE team for carrying out Risk & Aspect Assessments- Provide reports regarding progress and completion of the works to the client. -
Deputy Project ManagerProtec Technical Services Jan 2016 - Apr 2017Doha, QatarProject Name : Reverse osmosis desalination plant and supporting infrastructure – 20,000 M³/ day Project was a design, construction, testing & commission of Brackish water reverse osmosis Plant (PWRO) with pre-treatment units and Zero liquid falling film evaporator. The purpose of the project was to desalinate the ground water for usage in district cooling pants and irrigation inside Qatar foundation facilities. In addition, reduction of rejected water with high salinity to zero by using filling film evaporators to produce salt to avoid environmental impact of rejected water.Prior to be awarded for the project I was active member of the tender and coordinator for design team between three involved disciplines: Civil, Mechanical and Electrical. In addition, I was the lead for collaboration with vendors regarding technical proposal for required equipment for plant components according to process design. After being awarded my involvement has changed to:- Supervising the site preparation to start structural works such as Topographical survey Geotechnical and Soil Investigation. - Identifies resources needed and assigns individual responsibility.- Involved to get project resources to meet project needs. -
Deputy Project ManagerProtec Technical Services Jun 2012 - Dec 2015Doha, QatarProject Name: Temporary Package Treatment Plant (PTP) – 10,000 M³/ day - 2 Plants in different locations EPC contract, operation and maintenance for 5 years with PWA Project Affair division.Project was a design, construction and testing & commission of 2 package treatment plants with extended aeration technology with capacity of 10000 CMD.Project comprised construction of de-watering plant to recycle sludge to produced sludge cake for industrial use and to eliminate the discharge of sewage in Karana lagoon and covering the suburbs which were not connected to FS network. as Deputy project manager I was committed to:- Review all materials submittals before submission to consultant to ensure that its prepared based on Approved deign.- Follow up procurement processes and attending the FAT test for required items.- Manging the Execution teams (Civil, Mech, Elec. And ISA) and monitoring how they are performing the work on site as per approved shop drawings- Delivering progress report about achieved target in weekly bases and prepare look ahead schedule to the site team based on project base line.- Leading Quality team for delivering all materials to the consultant and get materials acceptance also to conduct all work inspections with the consultant for completed work to get partial handing over- Leading operation team during testing and commissioning of the plats and witnessing the final handing over t the client -
Acting Project ManagerProtec Technical Services Jan 2011 - May 2012Doha, QatarProject Name : Intermediate Treatment Plant -3500 m3/day at ElshahnyiaProject it was a Design, construction and testing & commission for upgrade and extension project for existing package treatment plant with extended aeration technology and capacity it was 3500 CMD.Plant it was having only secondary treatment without screening and filtration and fully automated dosing system. We upgrade the inlet work by increasing the capacity 66%, Adding mechanical screen unit, adding new stream consist of one aeration tank and clarifier tank Adding Sand filters with pneumatic air system, Add also fully automated dosing system.- Follow up procurement processes and attending the FAT test for required items Review all shop drawings before handing over to site team to use for execution works- Control site teams and monitoring how they are performing the work as per approved shop drawings.- Delivering progress report about achieved target in weekly bases and prepare look ahead schedule to the site team based on project base line.- Leading Quality team for delivering all materials to the consultant and get materials acceptance also to conduct all work inspections with the consultant for completed work to get partial handing over- Leading operation team during testing and commissioning of the plats and witnessing the final handing over to the client -
Project EngineerBesix/Orascom Construction Industries – Oci, Egypt Aug 2010 - Dec 2010Alexandria Governorate, EgyptProject Name: ABU QIR Thermal Power Plant 650MW x 2My responsibilities on the project involved; to co-ordinate the preparation of MEP drawings and general arrangement layouts, performing site selection, material specification, supervision of piping installation according to P& ID, isometric and pipe plans, supervision of pipe installation according to ASME.I also, was in charge of managing the mechanical execution team for; -Material control for pipe materials like carbon steel, stainless steel, HDPE, ductile, cast iron, copper, PVC, UPVC.- Revising shop drawings and reporting variations,- Planning erection activities at site and manpower break down, and I was directly reporting to the Project Manager.
-
Technical Office EngineerOrascom Construction Plc Feb 2009 - Jul 2010Alexandria Governorate, EgyptProject Name: Nile Sugar Factory Project As Technical Engineer I was committed to:- Review all materials submittals before submission to consultant to ensure that its prepared based on Approved design.- Materials control for all deliveries and verifying it based on approved materials submittals.- Participating in preparation of weekly and monthly progress reports. - Participating in preparation of invoice supporting documents to the client. -
Site EngineerOrascom Construction Plc Jun 2008 - Jan 2009Alexandria, Alexandria, EgyptProject Name: Nile Sugar Factory Project As Site engineer, I was committed to:- Supervising the installation of all embedded parts for all projects equipment and steel structures with coordination between civil team and structural designer - Supervising the installation of steel structure and all equipment for main process building like extraction tower, carbonation tanks, filling film evaporators, condensate tanks, centrifugal, vacuum bans, sugar dryer ,sugar cyclones, pumps, plate heat exchangers and screw conveyors -
Operation And Maintenance EngineerSecond Military Army – Egypt Armed Force Oct 2005 - Apr 2008Ismailia Governorate, EgyptProject Name : Military Slaughter Factory Project Supervising all equipment from slaughtering line, water treatment station, boiler systems and recycling stations for waste are maintained and working well. Poultry factory included refrigeration plant with capacity of 250 ton for keeping 30 ton of stock and I was involved in O&M of this plant.The slaughter factory got extended later, and my responsibly as implementation Engineer was to supervise the erection of steel structures for three building, installation of equipment such as refrigeration plant, fire tube boiler, slaughtering line devices.
Ali Ibrahim Skills
Ali Ibrahim Education Details
Frequently Asked Questions about Ali Ibrahim
What company does Ali Ibrahim work for?
Ali Ibrahim works for Mace Qatar
What is Ali Ibrahim's role at the current company?
Ali Ibrahim's current role is BSc of Mech Engineering, PMI-PMP®, PMI-PBA®, PMI-RMP®, UPDA Emergency Service Manager- Zonal Framework - Q West CatchmentPublic Works Authority.
What is Ali Ibrahim's email address?
Ali Ibrahim's email address is en****@****ail.com
What schools did Ali Ibrahim attend?
Ali Ibrahim attended Alexandria University.
What skills is Ali Ibrahim known for?
Ali Ibrahim has skills like Have Good Experience In Construction Filed Especially Beet Sugar Factory, Identifies Resources Needed And Assigns Individual Responsibilities, Manages Day To Day Operational Aspects Of A Project And Scope, Executes Project Work Plans And Revises As Appropriate To Meet Changing, Minimizes Our Exposure And Risk On Project, Have Good Experience In Construction Filed Especially Beet Sugar Factory, Executes Project Work Plans And Revises As Appropriate To Meet Changing, Identifies Resources Needed And Assigns Individual Responsibilities, Manages Day To Day Operational Aspects Of A Project And Scope, Minimizes Our Exposure And Risk On Project.
Who are Ali Ibrahim's colleagues?
Ali Ibrahim's colleagues are Hazim Mohammed, Mahmoud Alged, Shams Iqbal, Mohammad Umar Alam Umar, Asif Shahid, Shifas Nizamudheen, Md. Amanullah Khan.
Not the Ali Ibrahim you were looking for?
-
-
1protecind.com
-
1darwishholding.com
-
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial