Construction Engineer
CurrentProject deliveredMuddy Creek renewal naturalisation channel project. A tidal stormwater concrete channel project which includes demolition and replacement of pedestrian bridge, landscaping package, replace the old concrete banks with sandstone and native plants, install a new elevated walkway to replace the existing pedestrian bridge near the netball.