Results oriented Project Manager/ MEP Manager with over 17 years of construction management experience of major infrastructure projects, such as: power plants, factories, pump stations,water treatment stations and world’s 3rd biggest textile plant in Algeria. Exceptional project management capabilities and an outstanding record of managing complex construction projects exceeding $2B in investment value, from the planning and feasibility stage, construction, commissioning, and client delivery.
Valve And Pump
-
FounderValve And Pump Jul 2022 - PresentAlgeria
-
Mep Project ManagerAstay Construction Mar 2016 - Jun 2022Relizane Vilayeti, Cezayir* Effectively supervised 420 workers , 3 engineers and mechanics from 3 different subcontractors to ensure safe constructions operations, such as: assembly works, stainless steel works, P.E. welding, metal works, pipe welding, sand blasting, steam curing, paint works, steel roofs and hydraulic tests.* Managed the logistics for heavy equipment transport and ensured compliance with site safety procedures to mitigate operational risks.* Coordinated all pipeline works from water treatment station to factory. Installed 17 km steel pipeline with DN 1000 and Dn 800.* Managed the installation of mechanical systems for potable water, plumbing & sewage, fire - fighting, irrigation, HVAC, vapor and pump stations equipments, valves, cranes and pipes inside the stations and buildings.* Obtained required safety documents for equipments imported from different countries. Completed required tests to get safety certificates.* Controlled all mechanical works of plant such as trigeneration power plant, water treatment plant, pump stations, underwater pump stations, fabric buildings etc.* Responsible all anti-fire systems in the plant. Constructed a main ring fire line in accordance with NFPA 20 standard. Commissioned and get acceptance from all local authorities for settlement.* Design and installation of CO2 automatic fire extinguishing systems inside local electrical rooms in accordance with NFPA 12 standard.* Responsible all natural gas systems in the factory. Constructed a main line with pressure reducing stations. Commissioned and get acceptance from all local authorities for settlement.
-
Mep Project ManagerKayi Construction Sep 2014 - Mar 2016Algeria* Responsible for overall construction project engineering, progress payment, operational planning, material procurement, quality control, contract administration, shop drawing review, submittals, project scheduling & planning and overall supervision of field activities.* Ensuring ASHRAE standards code of HVAC designing for Hospital, involvement in all technical meetings with Consultant and Contractor* Strong knowledge and exposure to all technical aspects pertaining to MEP services and other low current systems like BMS, ACS, CCTV, RAS, PTS, IPS, IPTV, UPS, CBS, PA, FAP and medical gas engineering. Also been a part of Testing and Commissioning of all the services installed in the building* Preparing daily, weekly and monthly progress report of the construction site to analyse the delay factor, assist Project Superintendent and Project Manager in establishing the construction code of practice.* Ensuring and execution of construction plans in line with specifications in accordance with all applicable codes and standards pertaining to hospital.* Preparing minutes of meeting and follow up very closely with the contractor/vendor for the aggressive progress of the project -
Mechanical EngineerGama Power Systems Engineering And Contracting, Inc. Oct 2012 - Sep 2014Algeria* Successfully managed the construction of the Gas Turbine Power Plant to ensure completion within established timeline, budget, QA and client requirements. Responsibilities begin from initial phase of business development through proposal generation, design engineering, procurement, construction, commissioning and final customer acceptance.* Key stakeholder actively involved in the planning, commissioning and O&Ms phases to streamline mechanical and piping operations and to ensure timely completion of projects.* Oversaw policy development, site planning and set specific KPI’s to keep projects on track and to ensure safety of all systems.* Cut annual costs by spearheading an improvement initiative of operational processes and procedures to enhance project delivery within specific constraints.* Managed project budget, defined and allocated required resources for project completion within established timeframe.* Reviewed and approved the contractor’s drawings to ensure compliance with project requirements and company’s guidelines. * Monitored expenditures by efficiently checking and approving material requests.* Identified and managed risks that may have impact on quality and technical integrity by implementing effective corrective actions.* Spearheaded constructability reviews to optimize erection schedule and assess the performance of the * Contractor’s construction organization and supervision. * Contributed to the development and implementation of the site quality plan and inspected construction process, with emphasis on piping and mechanical works, to ensure compliance with contractual agreements -
Mechanical EngineerGroupment Degremount Mapa Construction Sep 2005 - Aug 2012Algeria, Algeria* Directed large capital projects exceeding $1B in investment value by providing strategic management and operational oversight for all project phases. Responsibilities begin from initial phase of business development through proposal generation, design engineering, procurement, construction, commissioning and final customer acceptance.* Created and designed proposals, execution plan, project parameters and strategy documents for potential clients, outlined key resource requirements and timelines including pricing and position.* Carried as a key person all responsibility of all 60 km pipeline. Managed the project from first excavation till hand in to customer.* Managed as a key person who is responsible from all the works in the pipeline with subcontractor ( X-ray control,protection cathodic,welding,testing,bandaging etc.* Managed project budget, defined and allocated resources to ensure cost optimization and operational efficiency.* Managed the logistics for heavy equipment transport and ensured compliance with site safety procedures to mitigate operational risks.Effectively supervised 120 civil workers and mechanics to ensure safe constructions operations, such as: tower crane erections, assembly works, stainless steel works, P.E. welding, metal works, pipe welding, sand blasting, steam curing, paint works, steel roofs and hydraulic tests.Managed the logistics for heavy equipment transport and ensured compliance with site safety procedures to mitigate operational risks.Key contributor to the development and implementation of the site quality plan and inspected yard construction process.Coordinated all water pipeline works from water treatment station to dam. Installed 11 km steel pipeline with diameter Dn 800- Dn 1800Managed the installation of mechanical systems for potable water, plumbing & sewage, fire - fighting, irrigation, HVAC, and of pump stations equipment, valves, cranes and pipes inside the station.
Frequently Asked Questions about Ali Ozdes
What company does Ali Ozdes work for?
Ali Ozdes works for Valve And Pump
What is Ali Ozdes's role at the current company?
Ali Ozdes's current role is Mechanical Engineer & Founder - Valve & Pump Algerie.
Not the Ali Ozdes you were looking for?
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial