AeroLeads people directory · profile

Alper Toprak Email & Phone Number

Construction & Quality Manager in Oil & Gas, Available for New Opportunities.NEBOSH Cetified, PMP Trained, BSc in Metallurgical Engineering, BSc in Business Administration
Location: ÇAnkaya, Ankara, Turkey 11 work roles 2 schools
LinkedIn matched
✓ Verified August 2026 3 data sources Profile completeness 71%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Role
Construction & Quality Manager in Oil & Gas, Available for New Opportunities.NEBOSH Cetified, PMP Trained, BSc in Metallurgical Engineering, BSc in Business Administration
Location
ÇAnkaya, Ankara, Turkey

Who is Alper Toprak? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Alper Toprak is listed as Construction & Quality Manager in Oil & Gas, Available for New Opportunities.NEBOSH Cetified, PMP Trained, BSc in Metallurgical Engineering, BSc in Business Administration based in ÇAnkaya, Ankara, Turkey. AeroLeads shows a matched LinkedIn profile for Alper Toprak.

Alper Toprak previously worked as Construction Delivery Manager at Rumaila Operating Organisation - Roo and Corporate Quality Manager at Tanap Natural Gas Transmission Company. Alper Toprak holds Bachelor Of Science - Bs, Metallurgical Engineering, 3,34/4 from Istanbul Technical University.

Profile bio

About Alper Toprak

Alper Toprak is a Construction & Quality Manager in Oil & Gas, Available for New Opportunities.NEBOSH Cetified, PMP Trained, BSc in Metallurgical Engineering, BSc in Business Administration.

11 roles

Alper Toprak work experience

A career timeline built from the work history available for this profile.

Construction Delivery Manager

Basra, Al Başrah, Iraq

Rumaila is one of the largest oil field in the world with a production level of 1.4 million barrel/d, operated by the ROO, a partnership between BP and China National Petroleum Company, for the Basra Oil Company. Delivery of below Projects involved as per planned schedule and within budget without comprimising Company HS policies and Quality requirements / specifications.- Degassing Station (DGS) 3, Free Water Know Out (FWKO) which contain 2 train with 2 stage, 3 phase seperator, 1 FWKO drum, associated tie-ins to existing plant, civil works, structural fabrication and installation works, mechanical installation works, piping fabrication works and E&I works.- Temporary Water Injection Plant which contain 4 Weatherford water injection pumps, 4 VSD panel, 2 switchgear and 2 transformer, water injecton manifold, its associated tie-ins to existing system, civil works, structural steel fabrication and installation, piping fabrication and installation works and E&I works. - Cluster Pump Station (CPS) 6, New CPS station construction which contain, 5 nos Sulzer Injection Pumps, SPX Inlet Filter, Surge Relief Skid, Air Handling system, Containerised Electrical Distribution System, Cooling Water system, Overhead Crane, Control Building, Maintenance and Workshop Building, Badging Office, its associated tie-ins to existing system, civil works, architectural works, structural steel fabrication and installation works, mechanical installation works, piping fabrication and installation works, E&I pre-fabrication and installation works

Apr 2018 - Jul 2020

Corporate Quality Manager

Cankaya, Ankara, Turkey

1850 km of cross country pipeline, consist of 1380 km of 56” and 470 km of 48” pipeline from Georgian-Turkey Border (From SCPx Project) to Greece – Turkey (To TAP Project) border, include 2 Compressor stations, 4 metering stations, offshore Dardanel crossing (Twin 19 km of 36” offshore pipeline), 49 block valve stations. 58% share of SOCAR, 30% share of BOTAS, 12% share of BP. Achievements; Develop Project overall QA/QC strategy, philosophy and quality requirements including site and shop inspection requirements for Company, EPCM (Worley Parsons), Construction Contractor and Vendors.  Establish Company IMS consist of ISO 9001, ISO 14001 and OHSAS 18001 Ensure implementation of Company QMS. Plan and Conduct Internal and External audits.  Manage QA/QC resources consist of 25 head office expat and local national employee including specialist, engineers from all disciplines i.e. NDE Level III, Welding Engineer, Vendor Package Lead, Consturuction Leads, Coating Specialist, E&I Engineers, QA Engineers; and approx. 120 site based inspectors from all disciplines in onshore, offshore, stations, telecom and scada activities.  Plan estimated Project QA/QC budget, schedule and manage QA/QC bugdet (approx. $ 45M) include 2 nos Third Party Inspection Company, 2 nos Consultant Company. Measure, analyses the trend analysis of Construction Contractors and Vendors; and take necessary pro-active actions to eliminate, decrease the defected works.  Participate engineering reviews, contructability reviews.  Review and endorse DVRs, TQs raised by Construction Contractors and Vendors. Promote Pipeline contractors to implement ECA (Engineering Critical Assessment) as per API 1104 Appendix A. Review the requirements of WPS, PQR, Welder Qualifications, PMI. Ensure Project Quality Documentation (plans, procedures, ITPs etc.) issued by EPCM Contractor, Construction Contractors and Vendors reviewed and endorsed. Provide inputs for commissioning strategy and process.

Apr 2014 - Apr 2018

Construction And Completion Manager

Bp

Cankaya, Ankara, Turkey

- BTC Pipeline 1,2 Expansion Project / Turkey Section (DRA Project)- BTC Pipeline Enhancement Project / Turkey Section - 790 m. pipeline section reroute works, Hot-Tap and Stopple operations.- BTC Pipeline Shutdown (TAR) Works, 42” Isolation Valve Changeouts and Replacement works.- 3 BVT Subsidence rectification works with pile method on live pipeline.- 3 Pump station underground header subsidence rectification works on live stations.- BVT 30 Reinstatement and Security Upgrade Project including civil, piping, E&I scope.- Marine Terminal Off Shore (Jetty), Pump Stations and BVT’s CP (Cathodic Protection) installation works - Geohazard 2012 Scope (18 River Crossing Repair) repair works - Geohazard Phase II (River Crossing and Mudslide) repair works- Surge Relief System Nitrogen Panel Instrument Modifications project- Dent Repair Works along the Pipeline including composite wrapping, coating - Pump Station SDR (Suction Discharge Recycle) Header re-coating and backfilling works- WWTP (Waste Water Treatment Plant) construction. - BVT 28 Underground MV Cable Installation- Geohazard 2011 (River Crossing and Landslide) works - Ceyhan Marine Terminal CP (Cathodic Protection) works - 5 Security Critical BVT (Block Valve Station) Security Fortification works including Civils, Piping and E&I - 4 Landslide rectifications works along the pipeline on live pipeline. - 14 Security Critical BVT (Block Valve Station) Security Fortification works including Civil and E&I

Apr 2008 - Apr 2014

Qc Expert

Cankaya, Ankara, Turkey

- Support Wind Power, Simple Cycle and Combined Cycle Power Plant works Lead preparations for extention of Management System Certificates scope of work. Establish QC system and reparation of QC manuals including procedures, forms, ITP’s, WPS, PQR. Supporting Tender preparation activities especially mechanical, piping, structural part of the tender.

Sep 2007 - Apr 2008

Quality Assurance Quality Control Engineer

Düzce, Turkey

 Customers: BOTAŞ (Turkey), DSİ (Turkey), ASKİ (Turkey), İSKİ (Turkey), GAMA-NUROL (Turkey), CAMEG (Libya), SONATRACH (Algeria), Alfa Pipe (Algeria), SIDEM (France, Libya). Work with standards: Manufacturing : API 5L, EN 10217-1, EN-10224, ASTM A252, ASTM A53, NFA 49150, Coating: DIN 30670, NFA 49710, AWWA C-203, TS 5139, TS 4356, NFA 49709, AWWA C-205, DIN 2614, NFA 49701. Management and guide QC Inspectors. (UT,RT, Visual and Dimensional, Coating, Laboratory, Material, Shipment, Documentation Inspectors/Personnels, Total: 25 Inspector, 2 Foreman, 3 Shift)  3 Online Ultrasonic Station, 1 Flouroscopy (Real Time) X-Ray Station, 2 Visual and Dimensional Inspection Station, 1 Coating Inspection Station, 1 Mechanical Laboratory) Preparation of ITP’s, QP’s, WPS, PQR.) Lead company for application and get CE marking certification for EN 10217, EN 10224. Present company during external audits such as API, TUV and during Management System Audits (ISO 9000, OHSAS 18000, ISO 14000) Guide QC foreman for preparation of final handover dossiers including quality records.

Nov 2006 - Sep 2007

Lead Mechanical Engineer

Silivri, Istanbul, Turkey

Silivri Underground Natural Gas Storage Facilities Project  Support and supervise TPAO operation personnel during construction/commissioning and start-up.  Organize and manage mechanical punh list walkdowns. Guide and manage TPAO contractor and sub-contractor in order to compile, complete and preparation of final handover documents and missing quality control records. Guide contractor’s for preparation of hydrostatic test packages and support contractors for clearance of punch list deficiencies.

Aug 2006 - Nov 2006

Quality Assurance Quality Control Engineer

Turkey

August. 2004 – January 2005 Pipeline Section Lot B Spread 1 Erzurum-Erzincan / TURKEYJanuary. 2005 – November 2005 Pump Station Section PT1 Posof – Ardahan / TURKEYNovember. 2005 – August 2006 Pump Station Section PT4 Ulas – Sivas / TURKEY Prepare and implement an audit program and perform audits.  Undertake CAR / NCR analysis and provide overall status monitoring. Monitor the Management of Change (MOC) implementation. (FQ, FCN, TQ, Concession Requests…) Manage and report on quality assurance on site.  Act as custodian of assurance packages (i.e. Certification Route Plan, WPS, WPOR, ITP’s, MS’s, Procedures and Specifications) and ultimate their implementation. Monitor on any trends for set “Key Performance Indicators” , identify and discuss necessary action plans and rectify negative trends. Establish coordination and communication with all site functions on compliance issues, and assess that adequate site quality assurance control are in place and effective. Coordinate with contrcator QC Engineer to confirm required inspections and withnessing activities at site are being carried out in accordance with the defined , approved project documents. Review progress on related handover documentation, certification and compliance with Certification Route Map.

Aug 2004 - Aug 2006

Mechanical Inspector

Gemlik, Bursa, Turkey

Technocenghiz Oil Refinery Project Pressure Vessels Fabrication at CIMTAS Gemlik/Bursa-TURKEY & AD-DEMIREL İzmit-TURKEY. Inspect fabrication activities on behalf of Technochengiz Oil Refinery Project’s contractor PFD as a 3rd party inspection of pressure vessels and waste heat boiler, from material receiving stage to shipment stage in CIMTAS Factory. Inspect fabrication activities opn behalf of Technochengiz Oil Refinery Project’s contractor PFD as a 3rd party inspection of thermal oxidizer unit from material receiving stage to shipment stage in AD-DEMIREL Factory. Monitoring pressure vessels fabrication as per ASME code. Reviewing approved drawings, quality procedures, NDT procedures, material certificates, heat treatment charts, NDT results and Radiography Films, and fabrication, fit-up and welding activities. Wittnessing dimensional controls, welding activity visual controls, hydrostatic tesiting, painting and shipping preparation activities of pressure vessels.

May 2004 - Aug 2004

Piping Engineer

Azerbaijan

BP- BTC – 42” Crude Oil Export Pipeline Project  Supervision of the spool fabrication and site installation activities, welding, painting and testing of 19 Nos 42” Block Valve Stations, 3 Nos 42” Check Valve Stations, 3 Nos Pig Station piping works. Preparation of WPS’s for AGI (Above Ground Installation) as per ASME 31.3, ASME Section IV and API 1104 . Preparation of Piping, Hydrostatic Testing, Painting, Mechanical Works MS’s (Method of Statement) and Procedures. Procurement of Welding Equipments, Welding Consumables and Painting Materials. Supporting construction departments for civil (backfilling, concrete works) and electrical activities

May 2003 - Apr 2004

Qa/Qc Manager & Mechanical Supervisor

Bandirma, Balıkesir, Turkey

ETIBOR – Sulphuric Acid Plant Turn Key Project Supervising the erection, inspection & testing, dimensional checks of stainless steel and carbon steel tanks as per API 650  Supervising the installation, inspection of the mechanical equipment erection such as ESP (Electrostatic Precipitator), package units, conveyors, pre-fabricated storage tanks and vessels. Coordinate erection and inspect welding activities of WHB (Waste Heat Boiler) as per ASME Standards. Check and control the refractory and insulation activities of mechanical equipments, piping and ducting.  Supervising the installation of CS and SS piping as per ASME B31 and ducting activities.  Inspect steel structure erection activities. Follow up NDT (Non-Destructive Testing) tests and procedures as per ASME Section V. Follow up welding procedures, and inspecting the weld seems as per ASME B 31.3.  Punching of remaining works on tanks for preparation of hydrostatic testing and issuing test package. Monitoring the quality of work at the site during mechanical installation, civil works, steel structure works and fabrication of tanks. Identifie the problems at field and find solutions for field troubles . Inspection of received materials for project use. Preparing the QA/QC reports and issuing the relevant reports.

Oct 2002 - May 2003

Quality Assurance Quality Control Engineer

Al Karak, Jordan

JORMAG- MgO Plant Turn Key Project  Prepare quality procedures, WPS’s and PQR’s. Follow up NDT (Non-Destructive Testing) tests. Preparation of hydrostatic est packages for pipes as per ASME B31.3 and tanks as per API 650. Inspection of pressure vessels and tanks erection (API 650) and welding as per ASME Section IX standard. Inspection of Steel Structure for Torque Inspection and find solutions for field troubles. Inspection of sandblasting and painting of tanks, vessels, silos, pipe and steel structure. Guide all construction disiplines to follow the quality of the work and prepare the relevant reports. Maintain quality records and handover dossiers.  Monitor and follow-up the commissioning activities.

Jul 1999 - Oct 2002
2 education records

Alper Toprak education

Bachelor Of Science - Bs, Metallurgical Engineering, 3,34/4

Projects: Non-Destructive Techniques, Corrosion Control and Protection, Statistical Process Control.

Bachelor Of Business Administration - Bba, Business Administration And Management, General, 64/100

FAQ

Frequently asked questions about Alper Toprak

Quick answers generated from the profile data available on this page.

What is Alper Toprak's role at their current company?

Alper Toprak is listed as Construction & Quality Manager in Oil & Gas, Available for New Opportunities.NEBOSH Cetified, PMP Trained, BSc in Metallurgical Engineering, BSc in Business Administration.

Where is Alper Toprak based?

Alper Toprak is based in ÇAnkaya, Ankara, Turkey.

What companies has Alper Toprak worked for?

Alper Toprak has worked for Rumaila Operating Organisation - Roo, Tanap Natural Gas Transmission Company, Bp, Çalık Enerji A.Ş., and Erciyas Steel Pipe.

How can I contact Alper Toprak?

You can use AeroLeads to view verified contact signals for Alper Toprak, including work email, phone, and LinkedIn data when available.

What schools did Alper Toprak attend?

Alper Toprak holds Bachelor Of Science - Bs, Metallurgical Engineering, 3,34/4 from Istanbul Technical University.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Alper Toprak you were looking for.

View similar profiles