Project Manager
Current
India
During Design :-a)Site Visitsb)Heat load calculation in accordance to the building survey following the ISHRAE,ASHRAE Standards.c)Equipment Selection (Chiller ,Cooling Tower,AHU,FCU,Split AC,Pumps,Exhaust Fans,Ventilation Fans,Diffuser,Grills,VCD,Air Washer etc.)d)Calculation of air quantities, duct sizes, pipe sizing, static pressure Calculation, pump head etc.e)Design of Mechanical SystemDesign of Piping and fittingDURING TENDERING:-a)Detailed study of scope of work, specifications, Equipment’s Schedule and BOQ(Tender)etc.b)Prepare questionnaire to the consultant/client in case of discrepancy in the tender documents.c)Preparation of bill of quantities in Excel format for Lump sum projects as per Principles of Measurementsd)Pricing of the complete job from the basic details ,market and with the Latest plant layout & material cost.e)All post-tender process for winning jobs including value engineering & supplier negotiation.f)Preparing Discrepancies between tender drawings and construction drawings, calming variation to consultant.g)Procurement of high side and low side materials.DURING EXECUTIONa)Heat Load Calculationb)Preparation of Technical Data SheetDesigning of Equipment layout drawing, Duct Layout Drawing and GA Drawing of Equipment’sc)Preparation of P&IDd)Preparation of Electrical Load Liste)Preparation of MDL,BOQ for consultant approval.f)Preparation of work method statement as per specification and standard norms.g)Coordinating with the back office staff and/or supplier towards timely delivery of material on site.