Automation Engineer
Current•Execution of the project engineering involving Installation, commissioning, testing and supervision of RTU control panel of substations and its implementation with SCADA for any new site installation. •Software Installation, feeding database, graphics designing for any new project andediting for running project. •Weekly maintenance report and checked bySenior Section Engineer. •Preparation of SCADA schematic diagram, I/O tags developments, Cable termination schedule etc.•The client wanted to monitor electrical parameters such as voltage, current, Power Factor, MVA of its 132/25 KV Traction Sub Stations and Sectioning Post of Railways OHE. They also wanted continuous monitoring of Transformer's Taps and Alarms, Circuit-Breakers alarms, Catenaryalarms.Equipped RTU as a controller on sub-stations. For controlling purpose of electricity flow we provide Breakers ON-OFF• Provided MMI for Traction Power Controllers, proper arrangement done withFEP, Servers.system database. •Protocol Used: IEC-60870-5-103, SPORT (b/ w Master and Slave station) and Baud Rate:600 & 1200. • Electronic data communication betweenbus such as ARC Net, CAN Bus. •Involve in troubleshooting ofCommunication failure of Sites by Loop back check, Loop check method and analyze noisein signal. •Planning, Execution, Installation, Testing and Commissioning of Equipments used inMaintenance of instruments, good exposureto engineering surveys & documentation, material take-offs and as-built drawings etc. •Monitoring and Predictive maintenance of critical equipment and corrective actions to avoid breakdown