Amelito Deleon Email and Phone Number
Amelito Deleon work email
- Valid
Amelito Deleon personal email
Amelito Deleon is a Field Engineer at Fluor Corporation at Fluor Corporation.
-
Field EngineerFluor Corporation -
Field EngineerFluor Corporation Dec 2012 - Oct 2016Al Jubail Ksa Prepare working package for PARS Pre-Assemble Pipe Racks for the early works jobs. To guide and support the contractor prepare their submittals e.g. Hydrotest Package, Methods of Statements. To approved contractor test package hydraulic test or pneumatic test calculation. Answer RFI for Piping and Civil and Structural per DOW and Saudi Aramco Project Standard. Re-design the Piping FRP and Civil and Structural supports for the Cooling Towers. Coordinate to client for new and up coming design revision requirement by SADARA Client DOW and SAUDI ARAMCO To review GAP Analysis for Piping and Civil Design for early works issued drawing and report to FLUOR Home Office Houston USA for UNIT 730 and FLUOR Farnborough UK for Unit 530 SGU for new revision. Review and approve contractors MDS Material Data Sheets per Saudi Aramco Program Specification. Assigned as Piping Lead Piping for a group of SGU piping engineers for piping punch listing / piping restoration. Site walkthrough check and marked up P&ID. Coordinate with HO Fluor Home Office process engineer if found discrepancies on IFC Iso’s or vendor packages to match approved P&ID. (Audit for IFC Dwg.) Coordinate and close out client punch list. If required new dwg /design, take the lead for group of field engineers produce a new design, to meet client requirements per client punch list. Project close out work- -- Assigned to do Piping Material Reconciliation on the (3) three assets ICF, SGU, WT. – Check HO Home office final as-built . Iso’s, P&ID’s. ( Support the HO office process engineers for the final P&ID’s OPC and final issuance to Client and POL Project On Line) -
Project EngineerFluor Corporation Dec 2010 - Sep 2012Khanboudg Sum South Gobi Mongolia To review design packages from MWP (Maison Worley Parson) designer. 157 Km Pipe Line from 18 bore well, 22 pump station, 157Km of 35KV Power Transmission Line, 4Million Cubic Meter RWSS DAM (Biggest Man Made Water Reservoir build in Mongolia), 185Km of access road from Bore Well to Mining Site. To guide the construction per project industry standard and help construction to meet the owner schedule. To review GAP Analysis for Piping and Civil Design per minimum industry standard. In-charge for a group of local surveyor to re-survey the 157km pipe line and 35KV power transmission line. As-built for new design the RWSS main pipe line per actual survey. Prepare and develop turn over packages for Piping and Civil & Structural. Coordinate with RWSS designer MWP for the revised design and design drawing per actual survey. Over all Lead/Project Engineer for RWSS Engineering Department Design Disclipine Engineers; Piping, Civil, Electrical, Instrument, Structural, and Telecoms. -
Feild Qa/Qc EngineerFluor Corporation Nov 2009 - Mar 2010Jubail Indusrial City, Kingdom Of Saudi Arabia To review QVD’s Quality Verification Documents for piping hydro test packages. Signed and approved QVD’s are submitted to Complete it for signing off. To guide the Piping Contractor for preparation of Piping QVD’s and Complete it Turn over Books. To witness Pipe testing, Hydro testing, Leak test, Visual inspection, line checking to confirms as per design. To verify the test package and approved the piping re-instatement per quality assurance standard. -
Feild Piping EngineerFluor Corporation Feb 2008 - Nov 2009Jubail Indusrial City, Kingdom Of Saudi Arabia To answer RFI (Request For Information) give correct information to subcontractor as per drawing; as per design; as per specification; and as per standard ASME, API. To answer or make correct disposition for NCR raised by CMT QC as per specification or as per standard. To approved and evaluate subcontractor Methods of Statement , Material Submittals, Material Substitution that are not available in the kingdom. Coordinate to HO (Home Office of the project FLUOR CANADA/FLUOR GREENVILLE HOUSTON USA) for revision and generate isos or update P&IDs Line list and issue to subcontractor thru FCN Field Change Notice. To evaluate EDCN (Engineering Design Change Notice) from HO whether this need to update the drawing and implement in actual site condition and to report in HO Engineering if is done in site. TCP Technology Control Plan has been granted by American Chamber of Commerce for the access of restricted document for all the area AA Acetate Acid plant this document, drawing, design are under TCP jurisdiction. Attend construction meetings for various subcontractors to answer their query per engineering ASME standard and specification clarification. Involved for the preparation of system turnover for the piping scope. In-charge for the design of Foam Deluge and Fire Water for the AA and VAM Tankage Area. Full time Piping Engineer for JAC Utilities Area meaning in-charge for all the Piping works of Utilities; design changes, generating new Iso drawing , Updating P&IDs. Involved in the Punch clearing and Final Walkdown with the Client of the Sub-System for the Turn-over of Utilities Piping and Civil. -
Field Piping EngineerHyundai Engineering & Construction Co.,Ltd. Jun 2007 - Dec 2008Rlic- Ras Laffan Industrial City, Islamic Republic Of QatarTrained by SARPLAST INIZIATIVE INDUSTRIALI SpA ITALY for GRP/FRP Piping Superintendent specialized for the lamination joint and installation of bell and spigot joint: Assign in fabrication of spool and site installation of GRP/FRP pipe Glass Reinforced Pipe and Carbon steel for all underground works Directly in-charge for Subcontract daily activities work; work performance and the quality of product; safety of workers to meet and satisfy the client SHELL Standards Represent the THC Toyo Hyundai Consortium UG Department for weekly meeting and monthly meeting Also assign for the fabrication of spool for all carbon steel underground works Represent the Consortium for the interface of underground piping to other IC meaning coordination and scheduling for all tie in joint to other consortium -
Mechanical Piping EngineerHyundai Engineering & Construction Co.,Ltd. Jan 2007 - May 2007Knoc-Kner Amhadi Refinery, Kingdom Of Kuwait Assign for all tie in works for AG / UG piping to live gas plant. Preparation of work document for PTW permit / risk analysis evaluation for the execution work. In-charge to group of Subcontractor for tie in job ; hot tapping, cold cutting. In-charge for the supervision of Subcontractor UG piping works remaining works for all cement line piping underground. -
Mechanical Piping EngineerEni-Hyundai Engineering & Construction Co.,Ltd. May 2005 - Oct 2006Assalouyeh, Islamic Republic Of Iran In- charge for the re-construction MP/HP of Phase 4& 5 FLARE STACK ; PHASE 5 HP riser removal and re-construction also removal of HP KO drum ( during September Shutdown/turnaround). To assist the damaged on Phase 4&5 Flare Stack together with the Vendor and ENI AGIP Engineering and come with the solution PTW permit to work receiver for piping; mechanical; painting; insulation; prepare PTW document work procedure and isolation electrical and mechanical. Preparation of work document for PTW shutdown work and correspondence also line isolation for Flare Stack during shutdown In-charge for the clearing of remaining punch and WDN warranty defect for painting and insulation. Assist Vendor for company item WDN (Warranty Defect Notification) e.g. HVAC Carrier. To check the contract if it is company item and within the warranty period; coordinate with vendor for parts replacement or to be repaired in HDEC/ENI AGIP workshop. Modification of sulphur recovery unit third stage super heater heat transfer exchanger and repair of third stage reactor.
-
Mechanical Piping EngineerHyundai Engineering & Construction Co.,Ltd. Nov 2003 - Dec 2004Assalouyeh, Islamic Republic Of Iran Line checker during the construction for Gas train Unit 101-104-105(Train 1& 3) Sulfur Recovery Unit-108 (Train 3&4) and Propane Refrigeration Unit 111 (Train 1,2,3) In- charge for the construction of pipe line for the following equipment (Gas Treating Train) Feed Flash KO Drum; Cold Box; Feed Gas Expander; Treated Gas Compressor; De-methaniser Condenser; De-ethaniser Reflux Drum; Amine Sump Drum; ( Sulfur Recovery Unit) Sulfur Degassing Pit (Jacketed Pipe) Monitoring/line checking everyday work executed by the subcontractor, e.g. to check pipe alignment and coordinates wether it conform to isometric and plan drawing. Checking the line as per test package; if the line is complete within the target limit then it will be notify to QC for walk down or line checking. Directly in-charge for punch clearing of test packages; meaning test package walk down by QC will be cleared by a group of worker under my direct supervision and notify for final walk down prior to hydro testing. For final punch clearing / reinstatement and commissioning also in-charge for the rotating equipment such as horizontal pump, compressor, expander discharge and suction of flange final alignment as per vendor required. Also directly in-charge in punch clearing of commissioning punch during commissioning. -
Piping Engineer / Piping InspectorFormosa Petrochemical Co., Dec 2000 - Jun 2003No 1 Industrial Park Mailiao District Yunlin County, Taiwan R.O.C. Coordinate with the process engineer for the new additional piping job / new pipe line. In-charge for the checking and assessment of Furnace radiant coil/tube, refractory lining, and burner during OLIFEN 1 expandtion Estimate and prepare materials for new pipe line and in-charge for the construction. Prepare isometric drawing for new pipe line. Check additional piping line whether it confirms in design specification and ASME code and API code as well. RBI - Risk Based Inspector Familiarized with the ASME code prior to the inspection of existing pipe line expand using UTM and NDE on weak point with the SK South Korean Petrochemical Corp. counterpart Study together and prepare reports. In-charge in hot tapping job on high pressure line for big and small bore piping. During plant shutdown responsible for the isolation of line from equipment to piping mechanical isolation. Responsible for the re-face of column damage manhole flange during plant shutdown. During furnace shutdown in-charge for the repair of refractory and testing of radiant coil/tube & repair and maintenance. Responsible for the maintenance and repair OLIFEN -1 heat transfer exchanger e.g. hydro test on tube bundle repair & maintenance . Conduct non destructive test on shell and tube bundle and also braze plate in aluminum heat transfer exchanger as well. -
Field Civil Engineer / Qa/Qc EngineerFormosa Petrochemical Co., Jun 2000 - Dec 2000No. 1 Industrial Park, Mailiao District Yunlin Country, Taiwan R.O.C. In-charge of the general construction for additional works; structural and civil. Daily inspection of subcontractor work performance and check the quality of work. Estimate material for take-off for all additional works. Prepare shop drawing for additional woks. In-charge for the design revision of furnace burner (structural plate & stiffener) to coordinate with Gas Burner Vendor and prepare structural drawing and detailing refractory dimension and submit to OLIFEN 1 Furnace designer which is STONE WEBBER of UNITED KINGDOM. For approval and directly in-charge for the execution of work. In-charge for architectural design of OLIFEN 3 Maintenance shop & office. During construction of OLIFEN 2 in-charge for the construction of spherical tank foundation structural and concreting and erection -
Civil Project EngineerLocal Philippines Apr 1990 - Sep 1990PhilippinesTOTAL 10 YEARS IN EXPERIENCE OF CIVIL WORKS IN VARIOUS PROJECTS ESPECIALLY IN CONSTRUCTION OF HIGH RISE BUILDING AND CONDUMINIOM FROM STRUCTURAL TO ARCHETICTURAL FINISHES:ENGAGED IN VAROUS CONSTRUCTION FOR MAT & BED FOUNDATION CONVENTIONAL & COMPSITE BEAMS & COLUMN; PRE STRESSED & STRESSED STRUCTURE In charge on the daily activities in relation to plan and specification. Plan proper activities to be done daily and rely it to Foreman and Leadman for implementation. Monitor and check the daily activities if it conforms with the approved plans and specifications Estimate the required material for a given period of time and submit to Head Office Purchaser. Attend a Pre Bid meeting for a future projects likewise do the cost estimate prepare document. Attend a weekly meeting with Designer, Owner, Architects, Project Management, together with the company president regarding new revision and work schedule. In charge on the testing of material e.g. concrete cylinder for compression test, deformed bars, post tension cables for tensile stressing, x-ray on structural weld joint, others etc.
Amelito Deleon Education Details
-
Bachelor Of Science In Civil Engineering
Frequently Asked Questions about Amelito Deleon
What company does Amelito Deleon work for?
Amelito Deleon works for Fluor Corporation
What is Amelito Deleon's role at the current company?
Amelito Deleon's current role is Field Engineer at Fluor Corporation.
What is Amelito Deleon's email address?
Amelito Deleon's email address is am****@****uor.com
What schools did Amelito Deleon attend?
Amelito Deleon attended University Of Pangasinan.
Who are Amelito Deleon's colleagues?
Amelito Deleon's colleagues are Michael Chapa, Amirah Johnson, Rhonda Beck, Jim Gutsch, Bhupinder Chadha, Bri Taylor, Christine Hering.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial