Performance Monitoring At Ntpc Khargone 2×660 Mw
CurrentOperation and Efficiency Engineer at NTPC Khargone 2x660 MW, Conduct Performance Testing of 2x660 MW Power Plant, Water Balance and Audit, Boiler Efficiency Testing, APH analysis by using Flue Gas analyser, Cooling Tower Performance Testing, Daily Heat Rate Monitoring, Flow measurement through Ultrasonic Flow meter, Condenser performance Testing, TD BFP.