Turbine Desk Engineer
Current• Overall operation of the 4×600MW as a turbine desk engineer, which include starting/shutdown, routine and Emergency operation of Steam Turbine, Generator, and auxiliaries following "safe and standard operating procedures.• Emergencies handling as Blackout operation.