General Manager / Head (Power Plants & Mechanical)
Lahore
Worked in National Engineering Services Pakistan (Pvt.) Ltd in Lahore, Pakistan from October, 2012 to August, 2015 as General Manager / Head (Power Plants & Mech.); worked from July 2010 to October, 2012 as General Manager Power Plants (Elect./I&C) / Project Mgr; and from December, 2009 to June, 2010 as Chief Engineer Power Plants (Elect,/I&C) / Project Mgr. Leading a multi-disciplinary team of engineers, was mainly responsible for power plant and mechanical projects, project management including preparation of conceptual and front-end engineering design, detailed design review, feasibility and due-diligence studies, technical specifications, proposals for engineering services, testing and commissioning, cost estimation and bid evaluation reports of hydropower, steam & combined cycle/ co-generation power plant and barrage projects. Specific assignments handled during the above period include:1. DPM of MWH-NESPAK JV / PM NESPAK for Up-gradation and Refurbishment of Mangla Power Station. 2. Feasibility studies, PC-1, bidding documents and technical bid evaluation of 1200 MW each R-LNG based CCPP projects at Bhikki, Haveli Bahadur Shah and Balloki..3. Feasibility studies of a 20 MWp Solar PV PP at Manga Mandi, and PV system for NESPAK House Lahore.4. Technical Due-diligence studies for 100 MW Kotli and 135 MW Taunsa HPPs.5. 6600 MW Gaddani Power Park, K-Energy’s Bin Qasim Coal Conversion Project Units 3 & 4 and Sahiwal CFPP Project.6. Design review of 84 MW New Bong Escape and 22 MW Jabban Rehabilitation HPPs and 747 MW CCPP Guddu. 7. Feasibility level design of Electrical and I&C systems and tender documents for 840 MW Suki Kinari HPP and Ganges Barrage / HPP.8. Ranking (10) / feasibility studies (5) of 10 raw sites for small HPPs in Punjab. 9. FAT of DCS and GCBs for 425 MW Nandipur and 747 MW Guddu CCPP Projects respectively.10. Technical specifications for the state of the art Substation Automation System (SAS) for Gujrat and Lahore EHV Substations.