Nevada Professional Engineer, #15561 Arizona Professional Engineer, # 46530Specialties: Civil Engineer, Infrastructure, Land Development
-
Sr PmGcw, Inc. Apr 2023 - Aug 2024Las Vegas, Nevada, Us -
Principal Civil EngineerRick Engineering Company Jul 2021 - Apr 2023San Diego, Ca, Us -
Sr Project ManagerGulf Consult Nov 2009 - Jul 2021Shuwaikh, Safat, KwManaged the design of all utilities associated with the new Kuwait Terminal 2:, Water, Sewer, Irrigation, TSE water, storm water systems as well as total rainwater harvesting system for reuse in supplementing the irrigation water, as part of LEED gold certification. KNPC Oil Refinery: retrofitting a complete sewer system (both gravity and force mains) for a large and old oil refinery (1200 ha site) which previously had no sewer system. Also Managing other projects including Infrastructure Master Plan programming of Basra Iraq, Kuwait University - New Campus. Duties include design management, coordinating ongoing infrastructure design with project partner architects and engineers, contracts, scope changes, meeting and negotiating with local government agencies.Basra Iraq – Master Plan programming, covering stormwater management, waste water collection and treatment, solid waste collection and disposal Master Planning Studies- Responsible for the infrastructure portion of several master planning Studies. Basra Master Plan 2035, Kuwait City 2030 Master Plan, Kuwait Northern Regional Master Plan. -
Sr Project ManagerCdm Smith Nov 2008 - Sep 2009Boston, Ma, UsDowntown Jebel Ali, Project Manager, Dubai, UAE.Downtown Jebel Ali is a mixed-use development located between the Dubai waterfront and Techno Park, spanning an area of 200 hectares. Once completed, it will accommodate to over 200,000 people, 70,000 of whom will be residents. The development area will consist of four separate Zones. Downtown Jebel Ali will be made up of a total of 326 buildings of which 237 have been designated as residential. The first phase of the development is expected to be finished in 2009, with the final phase completed by 2011. -
Project ManagerGc Wallace Jun 2006 - Feb 2008Las Vegas, Nevada, UsLas Vegas, Nevada Project Manager, PE Managed a design team working on various land development projects; Prepared budgets and proposals and monitored project budgets and billings; Clients: Pulte, Del Webb, Woodside Homes, Astoria Homes. Project involvement: Sun City Mesquite Phase 1, 3 and Sun City Recreation Center Kyle Canyon Phase 1A, 1B and III Madeira Canyon Recreation Center. -
Project ManagerRbf Consulting Aug 2004 - Jun 2006Irvine, Ca, UsManaged a design team working on various land development projects; Supervised closely design process, developed improvement plans, coordinated water studies, drainage studies and traffic studies; Prepared budgets and proposals and monitored project budgets and billings. Meeting with clients and agencies on a regular basis regarding project related issues. Clients include Pardee Homes, Woodside Homes and Trident Development. Project involvement: Lake Las Vegas Parcel 5/10 (Woodside Homes) Bella Fiore and Parcel J (Pardee) Shea Commercial (Jones/ Eldorado) Maryland/Cactus Commercial Plaza (Stinson Properties) Avondale Commercial Center - McDowell Road and 99th, Phoenix, AZ. -
Project ManagerCarter Burgess Sep 2003 - Aug 2004Las Vegas, Nevada Project Manager, PE Responsibilities include the following: Managed a design team working on various residential land development projects; Supervised closely design process, developed improvement plans, coordinated water studies, drainage studies and traffic studies; Prepared budgets and proposals and monitored project budgets and billings; Met with clients and agencies on a regular basis regarding project related issues. Clients include Beazer Homes, Woodside Homes, American West and Carina Corp. Project involvement: Lamplight Square and Lamplight Cottages (Carina Homes) Pebble Creek Phase 1,2,3 and 4 (Woodside) Finisterre Phase 1 and 2 (Woodside)
-
Project ManagerG.C. Wallace, Inc. Mar 2002 - Sep 2003Las Vegas, NV Project Manager, PE Responsibilities include the following: Managed a design team working on various residential land development projects, mostly KB Homes; Supervised closely design process, developed improvement plans, coordinated water studies, drainage studies and traffic studies; Prepared budgets and proposals and monitored project budgets and billings; Met with clients and agencies on a regular basis regarding project related issues. Project involvement: Northstar Business Park Craig/Lamb, Desert Willows Phases 1, 1A, 2A, 3A, 4B, 5A, 5B (KB Homes) Walnut Glen Phases 1,2,3,4.(KB Homes) Riverwalk Phases 1 and 2.
-
Sr DesignerRick Engineering Company Feb 2001 - Feb 2002San Diego, Ca, UsSan Diego, CACivil Engineer Responsibilities include the following: Black Mountain Ranch Responsible for the design and plan preparation for a 4 lane collector backbone of a 5000 unit subdivision with very complex utility design constraints; Prepared improvement plans, grading plans, water studies, sewer studies, drainage studies. Formally trained in MicroStation and Inroads with Company sponsored in 2 month- 64 hour courses. -
Sr DesignerLatitude 33 Planning And Engineering Dec 1998 - Feb 2001LATITUDE 33 PLANING AND ENGINEERING La Jolla, California December 1998 - February 2001 Civil Engineer Responsibilities include the following: Worked on several large residential projects (Pacific Highlands Ranch- 6500 unit master planned residential development) and some commercial/ Institutional projects; Prepared improvement plans, grading plans, water studies, sewer studies, drainage studies, plats, maps and easements; Liaised with government agencies, architects, utility representatives and title companies. Project involvement: USD Jenny Craig Pavillion USD Science Center USD Joan Kroc Institute for Peace and Justice.
-
Sr DesignerCornerstone Engineering Feb 1998 - Dec 1998Responsibilities include the following: Worked on several large commercial projects. Prepared improvement plans, grading plans, water studies. Project involvement: Pool Products Inc. Vista Chevrolet Ann Rd/95 Candlewood Suites
Andre Leonard Education Details
-
University Of OttawaCivil Engineering -
Ecole Secondaire Theriault
Frequently Asked Questions about Andre Leonard
What is Andre Leonard's role at the current company?
Andre Leonard's current role is Sr PM at GCW, Inc. | Civil Engineering, Infrastructure.
What schools did Andre Leonard attend?
Andre Leonard attended University Of Ottawa, Ecole Secondaire Theriault.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial