Andrea Sesenna
AeroLeads people directory · profile

Andrea Sesenna Email & Phone Number

Site Engineer - Koysha Hydroelectric Project at Webuild
Location: Italy 7 work roles
1 work email found @itineraspa.it LinkedIn matched
✓ Verified August 2026 3 data sources Profile completeness 71%

Contact Signals · 1 work email

Work email a****@itineraspa.it
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Site Engineer - Koysha Hydroelectric Project
Location
Italy
Company size

Who is Andrea Sesenna? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Andrea Sesenna is listed as Site Engineer - Koysha Hydroelectric Project at Webuild, a with 6679 employees, based in Italy. AeroLeads shows a work email signal at itineraspa.it and a matched LinkedIn profile for Andrea Sesenna.

Andrea Sesenna previously worked as Site Engineer - Arena Santa Giulia Milano PalaItalia at Itinera and Site Engineer Prefabrication Area - Storstrom Bridge SBJV - Denmark at Itinera.

Company email context

Email format at Webuild

This section adds company-level context without repeating Andrea Sesenna's masked contact details.

{first}.{last}@itineraspa.it
86% confidence

AeroLeads found 1 current-domain work email signal for Andrea Sesenna. Compare company email patterns before reaching out.

Profile bio

About Andrea Sesenna

Andrea Sesenna is a Site Engineer - Koysha Hydroelectric Project at Webuild.

Current workplace

Andrea Sesenna's current company

Company context helps verify the profile and gives searchers a useful next step.

Webuild
Webuild
Site Engineer - Koysha Hydroelectric Project
Ethiopia
Employees
6679
AeroLeads page
7 roles

Andrea Sesenna work experience

A career timeline built from the work history available for this profile.

Site Engineer - Koysha Hydroelectric Project

Ethiopia

Site Engineer - Arena Santa Giulia Milano Palaitalia

Milan, Lombardy, Italy

Construction of the MSG Arena that will host the 2026 Winter Olympic games.The Arena appears as a building with elliptical geometry and dimensions of approximately 175/180 m x 145/150 m.The Arena basin, conceived as a large amphitheater with a horseshoe shape, is able to accommodate around 16.000 spectators and is organized into two rings of stands.The access to the Arena for the spectators is from the outside mainly through two levels : level 0, located at the street level and level 1, located at the level of the “Piazza” raised from the street level by 3,2 m.The vertical distribution inside the building occurs thanks to the presence of a series of stairwells, escalators and elevators, located both adjacent to the basin and along the facade.

Site Engineer Prefabrication Area - Storstrom Bridge Sbjv - Denmark

Denmark

Construction of a prefabricated viaduct of 3.512 m with 44 piers, a main cable stayed bridge of a length of 320 m with a central pylon 101 m high.Site Engineer of Prefabrication Area : Building 4 (Pier Elements & Deck Top Pier Elements) and Superpiers (Pier Erection).Management of the construction process, coordination with subcontractors and suppliers, management and application of safety regulations, monitoring of the quality of the construction work, preparation of production reports and neccesary documentation.1. Construction of Pier Elements in variable sections along the elevation : heavy steel reinforcement assembly, steel and wood carpentry activities, positioning of Doka and Hunnebeck steel formworks, casting in S4 and S5 concrete, heavy lifting activities of elelements (100 Ton - 150 Ton weight) with the use of Gantry Cranes of 260 Ton of lifting capacity .2. Pier Elements Positioning : erection of piers with the use of a Sheerleg Crane (HEBO 9), steel reinforcement activities and casting of construction joints in SCC concrete.3. Pier Head Construction : Doka and Hunnebeck platforms positioning on the piers erected, heavy steel reinforcement activities, Doka and Hunnebeck steel formworks positioning, Post Tensioning predisposition assembly and casting with SCC concrete, Post Tensiong stressing activities and lifting of the piers with the use of a 800 Ton lifting capacity Sheerleg crane (HEBO 9).4. Construction of Deck Top Pier Elements : heavy steel reinforcement assembly, assembling and laying of Post Tensioning predispositions (PT ducts, Cast Iron Blocks assembly, laying of strands and stressing activities), steel and wood carpentry activities. Constructionof the elements in 2 different construction phases for either steel, Hunnebeck formwork and post tensioning lauyouts. Casting in SCC concrete, heavy liftings (450 Ton - 500 Ton weight) with the use of a 800 Ton Sheerleg crane (HEBO 9).

Feb 2023 - Feb 2024

Cost Controller - Storstrom Bridge Sbjv - Denmark

Vordingborg, Zealand, Denmark

Aug 2022 - Mar 2023

Cost Controller - Start-Up Of Hammarby Kanal Project And Södra Hagalund-Arenastaden Metro Project

Stockholm, Stockholm County, Sweden

- Hammarby Kanal Metro Project : execution of rock excavation and civil works, approximately 1.100 m of main tunnel and service tunnel (m3 of exc. 239.300). The contract also includes the service platform in the main tunnel, two escalator shafts and two ventilation shafts.- Södra Hagalund - Arenastaden Metro Project : construction of two new stations Arenastaden and Sodra Hagalund with associated service tunnels and rail tunnels. Each station has two accesses from ground level and four ventilation shafts. Total length of the lot is km 2,50 (m3 of exc. 377.449).

May 2022 - Jul 2022

Junior Cost Controller - Storstrom Bridge Sbjv - Denmark

Vordingborg, Zelandia, Danimarca

Construction of a prefabricated viaduct of 3.512 m with 44 piers, a main cable stayed bridge of a length of 320 m with a central pylon high 101 m.

Mar 2020 - May 2022

Apprentice Cost Controller

Tortona, Piemonte, Italia

Stage in the Cost Control Department.

Nov 2019 - Mar 2020
Team & coworkers

Colleagues at Webuild

Other employees you can reach at webuildgroup.com. View company contacts for 6679 employees →

FAQ

Frequently asked questions about Andrea Sesenna

Quick answers generated from the profile data available on this page.

What company does Andrea Sesenna work for?

Andrea Sesenna works for Webuild.

What is Andrea Sesenna's role at Webuild?

Andrea Sesenna is listed as Site Engineer - Koysha Hydroelectric Project at Webuild.

What is Andrea Sesenna's email address?

AeroLeads has found 1 work email signal at @itineraspa.it for Andrea Sesenna at Webuild.

Where is Andrea Sesenna based?

Andrea Sesenna is based in Italy while working with Webuild.

What companies has Andrea Sesenna worked for?

Andrea Sesenna has worked for Webuild, Itinera, and Itinera Spa.

Who are Andrea Sesenna's colleagues at Webuild?

Andrea Sesenna's colleagues at Webuild include Corey Makelim, Camille Espinasse, Domenico Ant. Chiera, Worku Kebede, and Firdavs Khasanov.

How can I contact Andrea Sesenna?

You can use AeroLeads to view verified contact signals for Andrea Sesenna at Webuild, including work email, phone, and LinkedIn data when available.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Andrea Sesenna you were looking for.

View similar profiles