Distributed Control System - Turbine Generator
CurrentPowerplant Boiler CFB (2x150t/h) and Turbine (2x25 MW) • Commissioning Boiler CFB and Turbine Generator- Drying and baking boiler with low and high temperature- Performed and prepared line-cleaning activity packages for OSBL and ISBL - Flushing, Blowing, Leak test- Commissioning procedure ( acceptance test , performance test- Started up and shut down the turbine, Synchronized turbine to the generator, and operated, controlled, observed, and recorded the turbine, generator, and other supporting equipment parameters.- Managed power and steam distribution