Company Owner
CurrentConsultancy services in energy related projects. Experience in steam/gas turbines, steam boilers, district heating boilers, solar panels.
Please complete the CAPTCHA to continue
A concise factual answer block for searchers comparing this professional profile.
Andrei Costache is listed as Project Manager at Sun Volt Solar SRL, based in Bucharest, Bucharest, Romania. AeroLeads shows a matched LinkedIn profile for Andrei Costache.
Andrei Costache previously worked as Company Owner at Sun Volt Solar Srl and Director Comercial at Turboenergy Power. Andrei Costache holds Doctor Of Philosophy - Phd, Depolution Solutions For Power Plants from Universitatea „Politehnica” Din București.
I'm working in the energy-environmental field since 2009. During this time i participated in various industrial projects having different roles. I started as site engineer, been promoted to site manager, since 2015 i'm project manager and since then i have managed 3 large projects (over 2 million e) and maybe 5-6 smaller projects. In 2015 i graduated my PhD studies in Flue Gas Treatment for large combustion facilities at the Polytechnic Univ. Bucharest. In 2011 i graduated the master studies in Energy & Environmental policies at the same university. I'm always open to learn new things and develop. I would also consider migrating to a different domain (IT, marketing,media) in a similar or junior position.
Listed skills include Project Management, Energy Efficiency, Energy Markets, Site Management, and 11 others.
Company context helps verify the profile and gives searchers a useful next step.
A career timeline built from the work history available for this profile.
Bucharest, Romania
Consultancy services in energy related projects. Experience in steam/gas turbines, steam boilers, district heating boilers, solar panels.
Bucharest, Romania
Management of all aspects of offering, technical and economical. Keeping in touch with clients and suppliers.
Bucharest, Bucharest, Romania
technology office manager project supervision for modernisation of boiler 2 3 4 CET SUD Powerplant
Bucharest, Romania
Bidding for projects and management of contracts
Fos Sur Mer, France
Dismantling and erection of 2 complete boiler units 215to of steam/h in Arcellor Mittal Steel Plant Fos sur Mer, France
Hamburg Area, Germany
Delivery of 3 AHEX heat exchanger units for Trimet Cement plant Germany.
Estonia
Delivery and erection of 1600to of Mega Bag Filter unit for Narva, Estonia 300MW Power Plant.
București, România
Delivery of 650 tons of fabrication to UK, in 4 different locations: Dunbar, Margam, Templeborough, Teeside.6 Bagfilters-whole units, insulated with cladding, delivered on barge on the Danube- 24m height, 5.5m diameter2 Conditioning Towers- insulated with cladding, delivered on barge on the Danube- 28m height, 5.5m diameter
București, România
Project Engineer in Export Departament for various projects most of wich Desulphurization for Coal Burning Power Plants:Rovinari U 3-4-6 Desulphurization PlantsGovora U 7 Desulphurization plantQuotations for fabrication and erection works for Export Dept. contracts.
Ardal ; Norway
Site manager for bagfilter erection and Lye (NaOH) Desulphurisation plant contracted and fabricated by EnergomontajSA SAEM Romania
Bucharest Branch
IT management - database server administrator for various applications, mostly OMC (database program used by the company) - accounting /hr/ administration (SQL-Fox databases)
Navodari Romania
Site manager for Petromidia-Rompetrol works during revision of the oil plant in 2011; also for installing large diameter gas pipes (aprox. 2km DN400 pipe and 1.5km of DN 200 pipe)with ISCIR and TUV. certification.
Bucharest Branch
Quotations for worksSite managementQuality-welding Documentation
technical and design advisor
Activities and Societies: Buletinul UPBPhD in Industrial Engineering
Activities and Societies: Sesiuni comunicari stiintifice, buletin UPB
Activities and Societies: Project Management Energy Markets
Quick answers generated from the profile data available on this page.
Andrei Costache works for Sun Volt Solar SRL.
Andrei Costache is listed as Project Manager at Sun Volt Solar SRL.
Andrei Costache is based in Bucharest, Bucharest, Romania while working with Sun Volt Solar SRL.
Andrei Costache has worked for Sun Volt Solar Srl, Turboenergy Power, Electrocentrale Bucuresti (Elcen), Energoutil Contact, and Energomontaj.
You can use AeroLeads to view verified contact signals for Andrei Costache at Sun Volt Solar SRL, including work email, phone, and LinkedIn data when available.
Andrei Costache holds Doctor Of Philosophy - Phd, Depolution Solutions For Power Plants from Universitatea „Politehnica” Din București.
Andrei Costache is listed with skills including Project Management, Energy Efficiency, Energy Markets, Site Management, Industrial Erection, Energy Management, Autocad Mechanical, and C#.
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.
Start free trial Search contactsCheck these profiles if this is not the Andrei Costache you were looking for.
View similar profiles