Andrey Tarabrin
AeroLeads people directory · profile

Andrey Tarabrin Email & Phone Number

Operations Manager at LUKOIL
Location: Yuzhno-Sakhalinsk, Sakhalin, Russian Federation 8 work roles 2 schools
1 work email found @lukoil.com LinkedIn matched
✓ Verified July 2026 4 data sources Profile completeness 100%

Contact Signals · 1 work email

Work email a****@lukoil.com
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Operations Manager
Location
Yuzhno-Sakhalinsk, Sakhalin, Russian Federation
Company size

Who is Andrey Tarabrin? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Andrey Tarabrin is listed as Operations Manager at LUKOIL, a with 6507 employees, based in Yuzhno-Sakhalinsk, Sakhalin, Russian Federation. AeroLeads shows a work email signal at lukoil.com and a matched LinkedIn profile for Andrey Tarabrin.

Andrey Tarabrin previously worked as Senior production technologist at Sakhalin Energy and Production Superintendant at Zn Vostok. Andrey Tarabrin holds Master Degree, Operation Of Oil Wells In The Complicated Conditions, 4.93 from Russian State University Of Oil And Gas.

Company email context

Email format at LUKOIL

This section adds company-level context without repeating Andrey Tarabrin's masked contact details.

{first}.{last}@lukoil.com
89% confidence

AeroLeads found 1 current-domain work email signal for Andrey Tarabrin. Compare company email patterns before reaching out.

Profile bio

About Andrey Tarabrin

I’m a petroleum engineer. I have experience (11 years) in international oil and gas projects in Iran, Iraq, Kazakhstan, and Russia. I got the master’s and bachelor’s degree at Russian State University of oil and gas in 2012. Since 2022, I have been working in Sakhalin Energy ltd. (Senior production technologist) in Russia.Key advantages:1. I have experience with the ESP pumps, progressive cavity pumps (PCP), natural flow and rod pumps;2. I have experience with special software: Petex Prosper & GAP, Schlumberger Pipesim, IHS Perform & SubPump, Avtotekhnolog, Baker Hughes Autograph and Weatherford Wellflo;3. I was working at the largest oilfield "West Qurna-2". I got the experience with Smart Field projects;4. I have experience of local people management at oilfields in Iran;5. I have experience with gas production wells located on offshore platform;6. I have knowledge of English at the upper-intermediate level.

Listed skills include Профессиональная Ответственность, Командная Работа, Нефтегазовое Дело, Анализ Данных, and 27 others.

Current workplace

Andrey Tarabrin's current company

Company context helps verify the profile and gives searchers a useful next step.

LUKOIL
Lukoil
Operations Manager
Cairo, Cairo Governorate, EG
Website
Employees
6507
AeroLeads page
8 roles

Andrey Tarabrin work experience

A career timeline built from the work history available for this profile.

Operations Manager

Cairo, Cairo Governorate, Eg

Senior Production Technologist

Current

Yuzhno-Sakhalinsk, Sakhalin, Russia

Responsibilities and tasks: 1. Operational modes and limits of gas production wells were created during smart development control;2. "Production wells-gathering system" integrated model (IM) were done to identify the potential of wells and develop recommendations for gas wells and for the collection system. Updating the model after new well studies performing;3. PWRI and CRI systems information updating and monitoring the parameters of back-injection of water on the Lunskoye platform. Reporting about PWRI and CRI wells to the management;4. Participation in daily meetings with information supply of the gas wells parameters at the Lunskoye field. Filling out the operational summary daily;5. Well intervention programs were prepared for gas production wells and PWRI and CRI wells aimed to optimize production and water back injection during smart development;6. “Clean up and build up” and multi-rate test” programs were prepared for gas production wells. Real time control during these programs was performed.

Oct 2022 - Present

Production Superintendant

Tehran, Iran

Responsibilities and tasks:1. Operational control of production and utilization wells and pipelines from the wellheads to the CPF. Testing of measuring equipment at production and disposal wells; 2. Organization of work with local working staff to perform the daily oil production plan (startup of production wells into operation, changing of the operating mode and working out of production wells to the burn pit);3. Review and control of daily activities (collection of well samples, measurement of wellhead and linear pressures, measurement of annular and inter-column pressures);4. HSE execution of production plans, provision of preventive measures to avoid and eliminate violations in production process;5. Preparation of statistical, managerial and other required reports.Results:1. Oil production and delivery plans and water utilization for 2021 year were performed;2. The minimum number of emergency situations on the production wells and pipelines were provided;3. Schemes, forms and working documentation were created for daily activities in the oilfield;4. Perfect cooperation with local operators was organized. An official procedure of cooperation between the production supervisor and the operator was developed and signed.

Nov 2021 - Oct 2022

Lead Engineer

Lukoil "Nk Yugranefteprom"

Moscow, Russia

Responsibilities and tasks:1. Development of the software "C-CROT" for the conceptual design of oil and gas fields together with Russian university “MIPT”. Preparation of technical specifications for calculation of existing oilfield in PJSC "Lukoil. Organization of "C-CROT" licensing for PJSC "Lukoil";2. Development of solutions and pilot test organization of the downhole equipment for simultaneous oil production from two layers at hard-to-recover deposits with high deposit temperature;3. Developing of the integrated model "well-gathering system" of the Sredne-Nazymskoe, Aprelskoe and Galyanovskoe oilfields in the Schlumberger Pipesim software;4. Development of solutions and pilot test organization of the downhole equipment for low-flow wells working in the periodic operation mode.Results:1. The technical specifications were created and the contract was signed with “MIPT” to perform calculations on new license oil and gas fields of the Frolovskaya area. The licenses of C-CROT software were purchased for LUKOIL-engineering LLC;2. A contract was signed with NPF PACKER for pilot work of a single packer with a submersible electric valve for simultaneous oil production from two layers; 3. The gathering system model of the Sredne-Nazymskoye field was created in the Schlumberger Pipesim software package;4. A contract was signed with Elkam Company for pilot work of plunger pumps with a submersible linear motor.

Jun 2021 - Nov 2021

Senior Production Engineer

Kumkol, Turgai Petroleum, Kazakhstankumkol, Turgai Petroleum, Kazakhstan

Responsibilities and tasks:1. Optimization of the oil and gas gathering system and reservoir pressure maintenance, calculation of the required operating mode for surface equipment (pipelines, pumping stations, heaters and compressors) in the software Schlumberger Pipesim and IPM GAP;2. Selection of downhole equipment (ESP, sucker rod pump, tubing) for production and injection wells in the software Avtotekhnolog, IPM Prosper and Schlumberger Pipesim;3. Analysis of the production and injection wells stock with low failure interval. Performance of measures to increase failure interval (changing of operating well mode, introduction of new experimental equipment, changing of well repair schedule);4. The bottleneck analysis. Formation of measures to reduce the influence of complicating factors (paraffin, salt deposition, corrosion, mechanical impurities, radiation);5. Implementation and control of new developments in the oilfield (smart control stations for sucker rod pumps, LRP top drive systems, new deep equipment against mechanical impurities and corrosion);Results:1. The network of production and injection wells has been optimized, which allows oil and water flow prediction in the case of wells stoppage;2. New oilfield pipelines have been calculated. The new export pipeline with a heater for commercial oil has been calculated also;3. New methods against corrosion and salt deposition have been introduced. Planned failure interval equipment and oil production for each year have been achieved;4. The database of monthly equipment failure reports have been created, which is provided to the management to make strategic decisions;5. The method of "poor" failures has been developed, which allows to identify the most reliable pumping equipment (ESP, rod pump and others) of different manufacturing plants;6. A technical and economic analysis of tubing has been created, which allows to determine the most optimal type of tubing for each well.

Jun 2016 - Nov 2020

Shift Supervisor

Oilfield «West Qurna-2»

Responsibilities and tasks:1. Participation in control of oil and gas production system (over 100 production wells, 24 injection wells), drilling (3 teams), oil treating (9 technical lines), water treatment plant (6 installations), gas turbine power plant (GTPP) and oil transportation system. The ensuring of trouble-free operations;2. Preparation, analysis, consolidation and sending of daily reports to Iraq oil ministry and shareholders of the Company). Closing the day by compiling an operational production summary in 2 languages (English and Russian versions);3. Participation in the coordination of all rescue services (ERS, medics, production departments). Notifying staff about emergencies, training sessions, and other incidents. Logging of emergency events. Analysis of occurred incidents to prevent them in the future;4. Participation in the coordination of production services (Production, CPF, Power Operations) during production shutdowns, oil delivery, and emergency power shutdowns;5. Updating process diagrams in the automated process control system (Siemens XHQ, Dashboard, PI ProcessBook, etc.).Results:1. All annual parameters of oil production, oil delivery and new wells drilling for 2014 and 2015 were performed;2. The minimum number of emergencies and the absence of serious accidents at the oilfield were ensured;3. There are no remarks or errors during report generating, summaries, or other documents for company management;4. Optimization and visualization of production schemes (well temporary lines, gas system, and well placement) in the PI Process Book software was performed.

Oct 2014 - Jun 2016

Production Engineer

Oilfield «North Buzachi»

Responsibilities and tasks:1. Selection of downhole equipment for production wells, taking into account complicated factors (directional survey, free gas, oil viscosity) in the software Schlumberger Pipesim, Weatherford WellFlo and Baker Hughes Autograph;2. Analysis of the well stock with progressive cavity and sucker rod pumps with low failure interval. Participation of geological and technical events. Development of measures to reduce the complicated factors influence (paraffins, high oil viscosity, mechanical impurities);3. Implementation and control of new developments in the oilfield (new types of rods for progressive cavity and sucker rod pumps, LRP top drive systems, new measuring systems for well flow rate, high-performance progressive cavity pumps for wells with low failure interval and new centralizer for rods);4. The bottleneck analysis. Formation of measures to reduce the influence of complicating factors (the influence of free gas on suction submersible pump, loss of well flow rate when the ambient temperature decreases, rod failure during production).Results:1. The selection method of progressive cavity pumps was developed, the Company is still using. This method is universal and can be used for any oilfield where progressive cavity pumps are used;2. A progressive cavity pump stand for testing was placed in operation. Dozens of progressive cavity pumps of different sizes and manufacturers were tested, and the criteria for the applicability of new and repair progressive cavity pumps were determined;3. The selection method of sucker rod pumps was developed, the Company is still using. This method is universal and can be used for any oilfield where sucker rod pumps are used;4. A technical and economic analysis of the well pumps was created, which takes into account the cost of equipment, maintenance, electricity costs and the cost of well repair.

Aug 2012 - Oct 2014

Trainee

Branch Of Company In Moscow

Responsibilities and tasks:1. Analysis of Natural Flow wells, comparison of gas lift and downhole pumps possibilities, selection of pumping equipment in software IHS Perform and IHS Subpump for the West Qurna-2 field;2. Selection of isolation valves and safety valves in oil production wells to prevent oil gushing during natural flow production. Calculation of the best well design (vertical, horizontal or directional wells) for the West Qurna-2 oilfield;3. Improving of KarakudukMunai oilfield efficiency for 2011-2013 with the help of proposed measures: The introduction of jet pumps and well reperforation with a PowerJet perforator.Results:1. At the end of the first year internship, the necessary measures were determined to improve the efficiency of the KarakudukMunai oilfield. Capital and operating costs and profit were calculated;2. At the end of the second year of the internship, a master's dissertation and the final project of the internship were written on the topic: "The research and selection of the equipment for high production natural and mechanized wells on deposit West Qurna 2".

Jun 2010 - Aug 2012
Team & coworkers

Colleagues at LUKOIL

Other employees you can reach at lukoil.com. View company contacts for 6507 employees →

2 education records

Andrey Tarabrin education

Master Degree, Operation Of Oil Wells In The Complicated Conditions, 4.93

A theme of master dissertation «the research and selection of the equipment for high production natural and mechanized wells on deposit.

Bachelor Degree, Develop And Exploitation Of Oil Fields, 4,67

A theme of bachelor dissertation «Gas separation on suction submersible pump» - excellent.

FAQ

Frequently asked questions about Andrey Tarabrin

Quick answers generated from the profile data available on this page.

What company does Andrey Tarabrin work for?

Andrey Tarabrin works for LUKOIL.

What is Andrey Tarabrin's role at LUKOIL?

Andrey Tarabrin is listed as Operations Manager at LUKOIL.

What is Andrey Tarabrin's email address?

AeroLeads has found 1 work email signal at @lukoil.com for Andrey Tarabrin at LUKOIL.

Where is Andrey Tarabrin based?

Andrey Tarabrin is based in Yuzhno-Sakhalinsk, Sakhalin, Russian Federation while working with LUKOIL.

What companies has Andrey Tarabrin worked for?

Andrey Tarabrin has worked for Lukoil, Sakhalin Energy, Zn Vostok, Lukoil "Nk Yugranefteprom", and Lukoil International Secondment B.V..

Who are Andrey Tarabrin's colleagues at LUKOIL?

Andrey Tarabrin's colleagues at LUKOIL include Anastasia Kalugina, Davide Mauro, Alexey Yerachin, Юрий Никифоренко, and Abbas Alburiahi.

How can I contact Andrey Tarabrin?

You can use AeroLeads to view verified contact signals for Andrey Tarabrin at LUKOIL, including work email, phone, and LinkedIn data when available.

What schools did Andrey Tarabrin attend?

Andrey Tarabrin holds Master Degree, Operation Of Oil Wells In The Complicated Conditions, 4.93 from Russian State University Of Oil And Gas.

What skills is Andrey Tarabrin known for?

Andrey Tarabrin is listed with skills including Профессиональная Ответственность, Командная Работа, Нефтегазовое Дело, Анализ Данных, Разведка И Добыча, Ipm Prosper, Ihs Perform, and Ihs Subpump.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Andrey Tarabrin you were looking for.

View similar profiles