Anil Srivastava
AeroLeads people directory · profile

Anil Srivastava Email & Phone Number

Team Leader at Indian Technocrat Ltd at Indian Technocrat Ltd
Location: Ranchi, Jharkhand, India 20 work roles 1 school
LinkedIn matched
✓ Verified July 2026 3 data sources Profile completeness 86%

Contact Signals

LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Team Leader at Indian Technocrat Ltd
Location
Ranchi, Jharkhand, India
Company size

Who is Anil Srivastava? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

Anil Srivastava is listed as Team Leader at Indian Technocrat Ltd at Indian Technocrat Ltd, a with 70 employees, based in Ranchi, Jharkhand, India. AeroLeads shows a matched LinkedIn profile for Anil Srivastava.

Anil Srivastava previously worked as Team Leader at Indian Technocrat Ltd and General Manager at Mbl Infrastructures Ltd. Anil Srivastava holds B. Sc - 1980, Be (Civil) - 1985, Civil Engineering from Manipal Institute Of Technology, Manipal, India.

Company email context

Email format at Indian Technocrat Ltd

This section adds company-level context without repeating Anil Srivastava's masked contact details.

Indian Technocrat Ltd

Review company-level records connected to Anil Srivastava before choosing the right outreach path.

Profile bio

About Anil Srivastava

Anil Srivastava is a Team Leader at Indian Technocrat Ltd at Indian Technocrat Ltd.

Current workplace

Anil Srivastava's current company

Company context helps verify the profile and gives searchers a useful next step.

Indian Technocrat Ltd
Indian Technocrat Ltd
Team Leader at Indian Technocrat Ltd
new delhi, delhi, india
Website
Employees
70
AeroLeads page
20 roles

Anil Srivastava work experience

A career timeline built from the work history available for this profile.

Team Leader

Current

Name of Project & Value - Consultancy Services for Authority’s Engineer for Improvement to two lane with paved shoulder of the existing road Vikash-Booty More –Kantatoli Namkum Bridge (ROB) – Rampur Junction Road (Urban Portion of NH-33) on EPC mode. Costing Rs. 228.68 Crores. Name of Client - State Highways Authority of Jharkhand, Ranchi Major Scope of work - 2-Laning of flexible pavement – 25.35 kmJob Responsibilities - Overall In-charge of all construction activities.Liaison with client/contractor on day to day basis for all technical matters.Liaison with local bodies.Implementation of quality control of the projectGetting the work executed through a team of engineers.Detailed planning of the works.

Aug 2017 - Present

General Manager

Kolkata, West Bengal, India

Name of Project & Value - Strengthening & Widening to Four lane of Dankuni to Chandannagar Section of SH-13 from Km 0+000 to Km 21+061 – Package 1. Costing Rs. 318.45 Crores.Name of Client - West Bengal Highway Development Corporation Limited, KolkataName of Supervision - URS Scott Wilson India Private Limited, KolkataConsultant Major Scope of work - 4-Laning of flexible pavement – 21.060 kmJob Responsibilities - Overall In-charge of all construction activities.Liaison with client/consultant on day to day basis for all technical matters.Liaison with local bodies.Implementation of quality control of the projectEffective deployment of all kinds of equipment and their utilisation.Getting the work executed through a team of engineers/supervisors/skilled workers/ unskilled workers.Detailed planning of the works.

Mar 2015 - May 2017

Joint General Manager

Walong, Arunachal Pradesh, India

Name of Project & Value - Infrastructure Development works at six locations in Arunachal Pradesh-Walong, Costing Rs. 177.79 CroresName of Client - Chief Construction Engineer(NEP)(AF), New DelhiName of Supervision - Satyavani Project and Consultants Pvt. Ltd., Hyderabad ConsultantMajor Scope of work - Runway and BuildingJob Responsibilities - Overall In-charge of all construction activities.Liaison with client/consultant on day to day basis for all technical matters.Liaison with local bodies.Implementation of quality control of the projectEffective deployment of all kinds of equipment and their utilisation.Getting the work executed through a team of engineers/supervisors/skilled workers/ unskilled workers.Detailed planning of the works.

Oct 2013 - Dec 2014

Joint General Manager

Lalitpur, Uttar Pradesh, India

Name of Project & Value - Assistance (Loan No. 2154-IND) Jhansi-Lakhnadon Section Contract Package No. ADB-II/C3, km. 94.000 to km. 132.000.Costing Rs. 240.38 Crores.Name of Client - National Highways Authority of India, New DelhiName of Supervision - RI – CEG JV Ltd., New DelhiConsultant Major Scope of work - 4-Laning of flexible pavement – 38.280 kmJob Responsibilities - Overall In-charge of all construction activities.Liaison with client/consultant on day to day basis for all technical matters.Liaison with local bodies.Implementation of quality control of the projectEffective deployment of all kinds of equipment and their utilisation.Getting the work executed through a team of engineers/supervisors/skilled workers/ unskilled workers.Detailed planning of the works.

Jan 2007 - Sep 2013

Deputy General Manager

Silchar, Assam, India

Name of Project & Value - Widening & Strengthening of National Highway from km 300.875 to km 275.00of Silchar to Balachera section of NH-54 in Assam on East West corridor under phase-II programme of NHDP, EW-II(AS-01).Costing Rs. 115.86 Crores Name of Client - National Highways Authority of India, New DelhiName of Supervision - I C T Pvt. Ltd., New DelhiConsultant Major Scope of work - 4-Laning of flexible pavement – 25.875 kmJob Responsibilities - Overall In-charge of all construction activities.Liaison with client/consultant on day to day basis for all technical matters.Liaison with local bodies.Implementation of quality control of the projectEffective deployment of all kinds of equipment and their utilisation.Getting the work executed through a team of engineers/supervisors/skilled workers/ unskilled workers.Detailed planning of the works.

May 2006 - Dec 2006

Deputy General Manager

Barpeta, Assam, India

Name of Project & Value - Widening & Strengthening of National Highway from 2 lane to 4 lane from km 1013.00 to 983.00 of Nalbari to Bijni section of NH-31 in Assam on East West corridor under phase-II programme of NHDP, EW-II(AS-8).Costing Rs. 187.07 Crores Name of Client - National Highways Authority of India, New DelhiName of Supervision - BCEOM-STUP-AARVEE JV, New DelhiConsultant Major Scope of work - 4-Laning of flexible & rigid pavement – 30.000 kmJob Responsibilities - Overall In-charge of all construction activities.Liaison with client/consultant on day to day basis for all technical matters.Liaison with local bodies.Implementation of quality control of the projectEffective deployment of all kinds of equipment and their utilisation.Getting the work executed through a team of engineers/supervisors/skilled workers/ unskilled workers.Detailed planning of the works.

Dec 2005 - Apr 2006

Senior Project Manager

New Delhi, Delhi, India

Name of Project & Value - Construction of ROB at level crossing No.32-B at kurali on Sirhind Nangal Dam Section of Northern Railway Crossing Chandigarh-Ropar Road(NH-21) at km. 26.428 under BOT Scheme with Toll RightsCosting Rs. 18.81 Crores Name of Client - Public Works Department (Govt. of Punjab),PatialaName of Supervision - Consulting Engineering Services(India) Pvt. Ltd, New DelhiConsultantMajor Scope of work - ROB and its approaches.Job Responsibilities - Overall In-charge of all construction activities.Liaison with client/consultant on day to day basis for all technical matters.Liaison with local bodies.Implementation of quality control of the projectEffective deployment of all kinds of equipment and their utilisation.Getting the work executed through a team of engineers/supervisors/skilled workers/ unskilled workers.Detailed planning of the works.

Apr 2004 - Nov 2005

Senior Project Manager

New Delhi, Delhi, India

Name of Project & Value - Up gradation / Improvement & Widening of Nangal- Ahilgram- Kalwan Mor Road from km 0 to km 14.830 Costing Rs. 14.50 Crores Name of Client - Punjab Infrastructure Development Board, ChandigarhName of Supervision - Sir Owen William Innovment, NoidaConsultantMajor Scope of work - 2-Laning of flexible pavement – 14.830 kmJob Responsibilities - Overall In-charge of all construction activities.Liaison with client/consultant on day to day basis for all technical matters.Liaison with local bodies.Implementation of quality control of the projectEffective deployment of all kinds of equipment and their utilisation.Getting the work executed through a team of engineers/supervisors/skilled workers/ unskilled workers.Detailed planning of the works.

May 2003 - Mar 2004

Senior Project Manager

New Delhi, Delhi, India

Name of Project & Value Construction of Bye-Pass at Morinda from R.D 0.00 to 6.733 (Excluding ROB No.1 and ROB No.2 with approaches) on Ludhiana Chandigarh Road(off take point at RD 61.816 and Meeting at R.D. 67.800 of NH-95) Costing Rs. 19.60 Crores Name of Client Punjab Infrastructure Development Board, ChandigarhName of Supervision R.S.Shukla & Co., New DelhiConsultant Major Scope of work 4-Laning of flexible pavement – 6.738 kmJob Responsibilities Overall In-charge of all construction activities.Liaison with client/consultant on day to day basis for all technical matters.Liaison with local bodies.Implementation of quality control of the projectEffective deployment of all kinds of equipment and their utilisation.Getting the work executed through a team of engineers/supervisors/skilled workers/ unskilled workers.Detailed planning of the works.

Aug 2002 - Apr 2003

Senior Project Manager

New Delhi, Delhi, India

Name of Project & Value Widening and Strengthening and Raising of Zirakpur-Rajpura Road from R.D. 0 to 28.110 of (NH-64) alongwith Construction of Nabha Sahib and its approaches including 4-laning a portion of Banur Town from R.D. 13.500 to 15.813 Costing Rs. 29.00 CroresName of Client Punjab Infrastructure Development Board, ChandigarhName of Supervision R.S.Shukla & Co., New DelhiConsultant Major Scope of work 2-Laning of flexible pavement – 28.110 kmJob Responsibilities Overall In-charge of all construction activities.Liaison with client/consultant on day to day basis for all technical matters.Liaison with local bodies.Implementation of quality control of the projectEffective deployment of all kinds of equipment and their utilisation.Getting the work executed through a team of engineers/supervisors/skilled workers/ unskilled workers.Detailed planning of the works.

Mar 2001 - Jul 2002

Project Manager

New Delhi, Delhi, India

Name of Project & Value - Construction of Group housing, Faridabad Costing Rs.18.76 Crores Name of Client - Housing Board HaryanaName of Supervision - Housing Board HaryanaConsultant Major Scope of work - Construction of 774 nos. double storey housesJob Responsibilities - Overall In-charge of all construction activities.Liaison with client/consultant on day to day basis for all technical matters.Liaison with local bodies.Implementation of quality control of the projectEffective deployment of all kinds of equipment and their utilisation.Getting the work executed through a team of engineers/supervisors/skilled workers/ unskilled workers.Detailed planning of the works.

Oct 2000 - Feb 2001

Project Manager

New Delhi, Delhi, India

Name of Project & Value - Construction of Group housing, Faridabad Costing Rs.18.76 Crores Name of Client - Housing Board HaryanaName of Supervision - Housing Board HaryanaConsultant Major Scope of work - Construction of 774 nos. double storey housesJob Responsibilities - Overall In-charge of all construction activities.Liaison with client/consultant on day to day basis for all technical matters.Liaison with local bodies.Implementation of quality control of the projectEffective deployment of all kinds of equipment and their utilisation.Getting the work executed through a team of engineers/supervisors/skilled workers/ unskilled workers.Detailed planning of the works.

Jan 1999 - Sep 2000

Resident Manager

Golaghat, Assam, India

Name of Project & Value - Construction of Hydrocracker Unit/ Hydrogen Unit, Numaligarh near Golghat. Costing Rs. 18.00 Crores Name of Client - Numaligarh Refinery Limited, GuwahatiName of Supervision - Engineers India Limited, New DelhiConsultantMajor Scope of work - Construction of major foundations and structural worksJob Responsibilities - Overall In-charge of all construction activities.Liaison with client/consultant on day to day basis for all technical matters.Liaison with local bodies.Implementation of quality control of the projectEffective deployment of all kinds of equipment and their utilisation.Getting the work executed through a team of engineers/supervisors/skilled workers/ unskilled workers.Detailed planning of the works.

Apr 1996 - Oct 1997

Site In-Charge

Tecnimount Icb Limited

Name of Project & Value - Coal Handling Plant/ Coal Preparation Plant/Rapid Loading System, Piparwar near Ranchi, Costing Rs. 80.00 Crores Name of Client - Central Coalfield Limited, RanchiName of Supervision - Tecnimount ICB Limited, MumbaiConsultant Major Scope of work - Civil & Structural works for CHP/CPP/RLSJob Responsibilities - As lead Planning EngineerPreparation of overall planning of the Project.Preparation & Monitoring of Budget of the ProjectPreparation of contractors Work Orders & certification of Bills.Material & Equipment Planning for the Project.Correspondence with client in technical matters and Document/Data Control.Preparation of working Drawings, Cross-sections etc.Liaison with client/consultant on day to day basis on technical matters.Preparation of Quality Assurance Plan & Quality Control Plan for the Project.

Jan 1994 - Mar 1996

Site In-Charge

Tecnimount Icb Limited

Name of Project & Value - Gas compressor station ,Jambusar near Baroda Costing Rs. 12.00 Crores Name of Client - Oil & Natural Gas Corporation Limited, MumbaiName of Supervision - Tecnimount ICB Limited, MumbaiConsultant Major Scope of work - Construction & Commissioning of plantJob Responsibilities - As lead Planning EngineerPreparation of overall planning of the Project.Preparation & Monitoring of Budget of the ProjectPreparation of contractors Work Orders & certification of Bills.Material & Equipment Planning for the Project.Correspondence with client in technical matters and Document/Data Control.Preparation of working Drawings, Cross-sections etc.Liaison with client/consultant on day to day basis on technical matters.Preparation of Quality Assurance Plan & Quality Control Plan for the Project.

Jan 1993 - Dec 1993

Site In-Charge

Tecnimount Icb Limited

Jalgaon, Maharashtra, India

Name of Project & Value Starch Plant, Maladabhadi near Jalgaon. Costing Rs. 46.00 Crores Name of Client Jalgaon District Co. Op. Starch Producing Society Limited, JalgaonName of Supervision Tecnimount ICB Limited, MumbaiConsultant Major Scope of work Construction of Starch plant with all utilitiesJob Responsibilities As lead Planning EngineerPreparation of overall planning of the Project.Preparation & Monitoring of Budget of the ProjectPreparation of contractors Work Orders & certification of Bills.Material & Equipment Planning for the Project.Correspondence with client in technical matters and Document/Data Control.Preparation of working Drawings, Cross-sections etc.Liaison with client/consultant on day to day basis on technical matters.Preparation of Quality Assurance Plan & Quality Control Plan for the Project.

Apr 1992 - Dec 1992

Construction In-Charge

Bangkok, Bangkok City, Thailand

Name of Project & Value - Construction of worsted yarn Project, Lobpuri near Bangkok. Costing Rs. 20.00 Crores Name of Client - Indo-Rama Textiles (Thai) Limited, Bangkok.Name of Supervision - Indo-Rama Textiles (Thai) Limited, BangkokConsultantMajor Scope of work - Construction and installation of machinery with all utilitiesJob Responsibilities - As lead Planning EngineerPreparation of overall planning of the Project.Preparation & Monitoring of Budget of the ProjectPreparation of contractors Work Orders & certification of Bills.Material & Equipment Planning for the Project.Correspondence with client in technical matters and Document/Data Control.Preparation of working Drawings, Cross-sections etc.Liaison with client/consultant on day to day basis on technical matters.Preparation of Quality Assurance Plan & Quality Control Plan for the Project.

Mar 1994 - Mar 1995

Site In-Charge

Name of Project & Value - Construction of spinning Mills, Boitamari near Bongaigaon. Costing Rs. 14.00 Crores Name of Client - Assam Co. Op. Spinning Mills Ltd, Boitamari near BongaigaonName of Supervision - Gherzi Eastern Limited, MumbaiConsultantMajor Scope of work - Construction and commissioning of plantJob Responsibilities - As lead Planning Engineer Preparation of overall planning of the Project.Preparation & Monitoring of Budget of the ProjectPreparation of contractors Work Orders & certification of Bills.Material & Equipment Planning for the Project.Correspondence with client in technical matters and Document/Data Control.Preparation of working Drawings, Cross-sections etc.Liaison with client/consultant on day to day basis on technical matters.Preparation of Quality Assurance Plan & Quality Control Plan for the Project.

Aug 1987 - Mar 1992

Assistant Engineer

Simplex Concrete Piles(I) Limited

Name of Project & Value - Construction of Gas Sweetening Plant, Hazira near Surat Costing Rs. 3.50 Crores Name of Client - Oil & Natural Gas Corporation Limited, MumbaiName of Supervision - Engineers India Limited, New DelhiConsultant Major Scope of work - Civil & Structural works for Gas Sweetening PlantJob Responsibilities - Billing, Supervision & Quality Control

Aug 1986 - Aug 1987

Trainee Engineer

Gannon Dunkerly & Co. Limited

Name of Project & Value - Construction of Kinetic Honda Motors Limited, Pitampura near Indore, Costing Rs. 4.25 Crores Name of Client - Kinetic Honda Motors Limited, PuneName of Supervision - Gherzi Eastern Limited, MumbaiConsultant Major Scope of work - Civil & Structural works for Scooter PlantJob Responsibilities - Billing, Supervision & Quality Control

Aug 1985 - Jul 1986
Team & coworkers

Colleagues at Indian Technocrat Ltd

Other employees you can reach at itl.net.in. View company contacts for 70 employees →

1 education record

Anil Srivastava education

FAQ

Frequently asked questions about Anil Srivastava

Quick answers generated from the profile data available on this page.

What company does Anil Srivastava work for?

Anil Srivastava works for Indian Technocrat Ltd.

What is Anil Srivastava's role at Indian Technocrat Ltd?

Anil Srivastava is listed as Team Leader at Indian Technocrat Ltd at Indian Technocrat Ltd.

Where is Anil Srivastava based?

Anil Srivastava is based in Ranchi, Jharkhand, India while working with Indian Technocrat Ltd.

What companies has Anil Srivastava worked for?

Anil Srivastava has worked for Indian Technocrat Ltd, Mbl Infrastructures Ltd, Ncc Limited, Punj Lloyd Limited, and Pbil-Apex Consortium Ltd..

Who are Anil Srivastava's colleagues at Indian Technocrat Ltd?

Anil Srivastava's colleagues at Indian Technocrat Ltd include Narendra Prasad, Ram Kishor Yadav, Sayeedul Islam, Rajesh Kumar, and Rajendra Dandare.

How can I contact Anil Srivastava?

You can use AeroLeads to view verified contact signals for Anil Srivastava at Indian Technocrat Ltd, including work email, phone, and LinkedIn data when available.

What schools did Anil Srivastava attend?

Anil Srivastava holds B. Sc - 1980, Be (Civil) - 1985, Civil Engineering from Manipal Institute Of Technology, Manipal, India.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the Anil Srivastava you were looking for.

View similar profiles