Engineer- Project
CurrentEngineer (Project Planning & controlling): -I. Make Project Plan (Received from Mkt.)II. Erection HT & LT transmission line & sub-station (132/33 KV).III. To co-ordinate with Electrical Contractor for Electrification, Execution, Erection & Commissioning.IV. To co-ordinate with Purchase & Vendor as per material/Product requirement at site.V. To provide the entire electrical solutions as per requirement.VI. To check the entire work as according to approved drawings.VII. Adept at preventive and breakdown maintenance.VIII. Planning of allotted work as per Project to Electrical contractor.IX . Daily reporting & prepare MIS to the Management regarding Project Plan & Project Status. X . Checking & Submission of Contractor Bill. XI . Indenting Of Raw Material as per BOM & Follow-up with Purchase DepartmentTechnical Key skills:- I. Good Knowledge of High Tension Switchgear like Isolator, AB Switch, GOAB Switch, HG Fuse, DO Fuse, Lighting Arrester, Power Transformer up to 132 KV,II. Handling Erection, Testing & commissioning of substationIII. Handling all Testing of Switchgear Product such as : A - Temperature Rise Test. B - High Voltage Test. C - Contact Resistance Measurement/Milli Volt Drop-Out Test. D – Insulation Check Test. E – Galvanizing Test like Mass of Zink Coating & Peerce Test. IV. Good understanding of Electrical Drawings, Planning of Projects, Erection & Maintenance.V. Both practical as well as theoretical knowledge of Different Electrical Instruments.VI. Working more efficiently and productively so that max. output comes.Software Key skills:- I. MS Excel, MS Office 2003/2007, AutoCAD,