Assistant Construction Manager
Current**Delhi International Airport Limited Phase 3A:****Planning & Execution of ECT (Eastern Cross Taxiway):**- Developed India’s first dual elevated taxiway.- Constructed landside and terminal passenger building spanning over 210,000 square meters.**Execution of Finishing Works:**- Arrival, Node, and Pier buildings: Included wall claddings, ceilings, façades, flooring, railings, column claddings, toilets, forecourt, passenger lifts, airline counters, and baggage reclaim… Show more **Delhi International Airport Limited Phase 3A:****Planning & Execution of ECT (Eastern Cross Taxiway):**- Developed India’s first dual elevated taxiway.- Constructed landside and terminal passenger building spanning over 210,000 square meters.**Execution of Finishing Works:**- Arrival, Node, and Pier buildings: Included wall claddings, ceilings, façades, flooring, railings, column claddings, toilets, forecourt, passenger lifts, airline counters, and baggage reclaim belts.**Key Features of ECT:**- Major bridge and underpass, along with associated structures such as the ECT sump and substation building.**Project Oversight:**- Reviewed method statements, as-built drawings, and certified RA bills for both the ECT and terminal building.**Landside Developments:**- Constructed two major bridges and an underpass.- Developed a 15-kilometer road network and a 20-kilometer drainage network. Show less