Anko Bos Email and Phone Number
Anko Bos work email
- Valid
- Valid
Anko Bos personal email
- Valid
Seasoned Marine Construction Professional, having extensive experience in a variety of dredging and offshore energy related projects. Projects around the globe and which involved removal of soils including solid rock, contaminated soils, placing of underwater rock, beach nourishment, land reclamation, capital dredging, maintenance dredging, breakwaters, revetments and installation of arctic loading facilities. Projects based on either charter, construct only, alliance or EPC principles. Projects in size varying from roughly 1 million EURO up to 200 million EURO.Have worked over the years in several roles, from Government Client Representative, Contract Manager, Surveyor, Cost estimator, Engineer, Superintendent, Project Manager, Country Manager, QHSE Manager, trouble shooter and since start 2024 Board of Directors member at Wasa Dredging Oy.Consider myself to be a team player, which in an open relation, based on fairness and trust aims to achieve a maximum sustainable result for the company, owners, colleagues and other stakeholders.
Wasa Dredging
View- Website:
- wasadredging.fi
- Employees:
- 25
-
Project Manager For The Paldiski Harbour Terminal 6A ProjectWasa DredgingHamburg, Hh, De -
Project Manager, Lunetteholmen, DenmarkWasa Dredging Oct 2024 - PresentVaasa, Ostrobothnia, FinlandDredging services for client Rohde Nielsen.This project started with fast track contracting. We worked duly, with our knowledgeable and known client, and in a week developed this from an initial request for support, via a proposal into a contract.Scope will be added at later stage as work is progressing.Equipment deployed consists of:Backhoe Dredger "Harald"Two Split Hopper Barges "Jenna" and "Laura"and tug "Baltsund" -
Project Manager Lulea-Malmporten Dredging ProjectWasa Dredging Jul 2024 - PresentVaasa, Ostrobothnia, FinlandWasa Dredging provides dredging services for Malmporten Dredging Contractors, a JV of Boskalis and Van Oord. Our dredging spread of Backhoe "Optimus" and the self propelled barges "Boann" and "Sinann" are provided to perform dredging works. My role is to arrange that the works are executed as agreed, keep track of the day to day progress, that works are being paid for and that we work according to our own and clients QHSE requirements. -
Member Board Of DirectorsWasa Dredging Jan 2024 - PresentVaasa, Ostrobothnia, FinlandTogether with the Chairman and the other Members of the Board keep track of the general health of the company and on basis of that determine where action is needed in our project driven organisation. We determine targets and objectives and see where there are possibilities or need for investment. We keep track of the changing world and determine the changes or investments needed to be able to operate still tomorrow. We aim to have zero incidents/accidents. My main topics with in the Board are… Show more Together with the Chairman and the other Members of the Board keep track of the general health of the company and on basis of that determine where action is needed in our project driven organisation. We determine targets and objectives and see where there are possibilities or need for investment. We keep track of the changing world and determine the changes or investments needed to be able to operate still tomorrow. We aim to have zero incidents/accidents. My main topics with in the Board are Projects, Engineering and Estimating, QHSE, IT and Marketing. In this role I also full the task of secretary to the Board of Directors. Show less -
Project Manager For The Paldiski Harbour Terminal 6A ProjectWasa Dredging Oct 2023 - PresentWorks related to ground improvement under a future port terminal. In view of the high load of the future terminal, 20 tons/m², the end client, Tallinn Harbour, has ordered the dredging of the unsuitable soft soil masses. Initially some 330,000 m³ is to be dredged and taken to the dumping area out at sea. During the execution the scope is extended with a trench and a fairway to be dredged, bringing the total volume to dredge at some 461,573 m³. As basis for our cooperation with our employer… Show more Works related to ground improvement under a future port terminal. In view of the high load of the future terminal, 20 tons/m², the end client, Tallinn Harbour, has ordered the dredging of the unsuitable soft soil masses. Initially some 330,000 m³ is to be dredged and taken to the dumping area out at sea. During the execution the scope is extended with a trench and a fairway to be dredged, bringing the total volume to dredge at some 461,573 m³. As basis for our cooperation with our employer "Insenerehituse AS" we use a FIDIC Blue Book contract. For the execution of the works we used our Backhoe Dredger "Optimus", Self Propelled Split Hopper Barges "Boann", "Sinann" and Tug "Leonardo" in combination with Split Hopper Barge "Elbe". Show less -
Director For Marketing And TendersWasa Dredging Oy Ltd Jan 2017 - PresentVaasa, Ostrobothnia, FinlandBOD / Steering Committee Member. Developing of prospects into projects for Wasa Dredging. In this position also working as Project Manager, Contracts Developer and Manager, Manager of ISO based QHSE system, Cost Estimator, Engineer and Problem Analyzer / Solver.Wasa Dredging is a private owned Marine Construction company with close to 40 years of experience. To be able to provide maximum durability and efficiency to our customere, we developed the marine tools used in-house. We are… Show more BOD / Steering Committee Member. Developing of prospects into projects for Wasa Dredging. In this position also working as Project Manager, Contracts Developer and Manager, Manager of ISO based QHSE system, Cost Estimator, Engineer and Problem Analyzer / Solver.Wasa Dredging is a private owned Marine Construction company with close to 40 years of experience. To be able to provide maximum durability and efficiency to our customere, we developed the marine tools used in-house. We are looking into Marine Projects worldwide, but with a focus on Europe and Scandinavia in particular.Our speciality is removal of hard soils by means of Backhoes and if so required apply drilling and blasting techniques. Show less -
Contract Manager Esbjerg ProjectWasa Dredging Feb 2024 - May 2024Vaasa, Ostrobothnia, FinlandTaking care of the day to day management of the charter agreement with our client Høj Nordic Marine Contractors. Under the agreement two Self Propelled Split Hopper Barges ""Boann" and "Sinann" were rented out to perform transport of dredged and rock material in the Port of Esbjerg. To check and enact that operations under the charter agreement follow Wasa Dredging policies in respect of Quality, Health, Safety and Environment. -
Project Manager For Trenching Works Related To The Ost See Lng ProjectWasa Dredging Mar 2023 - Nov 2023Trenching works related to the Ost See LNG project. A high-profile offshore project. Wasa Dredging performs assistance to Rohde Nielsen from Denmark using a Bimco Offshore Supply Time Agreement. The services are due to permit issues split in two campaigns. Works are performed in a strict QHSE environment, as applied to Offshore works. Under the agreement our Backhoe Dredger "Optimus", Self Propelled Split Hopper Barges "Boann", "Sinann" and Tug "Leonardo" in combination with Split Hopper Barge… Show more Trenching works related to the Ost See LNG project. A high-profile offshore project. Wasa Dredging performs assistance to Rohde Nielsen from Denmark using a Bimco Offshore Supply Time Agreement. The services are due to permit issues split in two campaigns. Works are performed in a strict QHSE environment, as applied to Offshore works. Under the agreement our Backhoe Dredger "Optimus", Self Propelled Split Hopper Barges "Boann", "Sinann" and Tug "Leonardo" in combination with Split Hopper Barge "Elbe" were deployed. Show less -
Project Manager For Dredging Of Berth 64-65-65A In KlaipedaWasa Dredging Feb 2023 - Apr 2023Capital dredging in the harbour of Klaipeda, Lithuania for our client BMGS. A total volume of some 43,000 m³ of sandy clays dredged in a challenging and confined berth area. Works were performed for main contractor BMGS, from Latvia, using a Fidic Blue Book contract. For the works our Backhoe Dredger "Optimus" and Self Propelled Split Hopper Barges "Boann", "Sinann" were used. -
Project Manager For The Senjahopen Design And Construct ProjectWasa Dredging Oct 2021 - Jan 2023Deepening of the Fairway and Harbour in Senjahopen, Senja Kommune in Norway. Contract used is a Design and Construct contract under NS 8407:2011. The design activities are focusing on the geo-technical, noise, turbidity and HSE elements in the project. As part of the scope water and sewage pipelines were removed or relocated. Soils dredged, some 275,000 m³ are to be placed with help of dump trucks into two onshore dumpsites. -
Project Manager For The Phase 2 – Expansion Project In Port Of RønneWasa Dredging Mar 2022 - May 2022Dredging of some 70,000 m³ of soils for the Phase 2 – Expansion Project. Soils will be dredged with Backhoe dredger “Harald”. The dredged material will be loaded in a towed split barge and dumped in the offshore appointed disposal area. -
Project Manager For The Baltic Pipe ProjectWasa Dredging Nov 2021 - Feb 2022Providing Back-filling services by a backhoe dredger to Rohde Nielsen for the Baltic Pipe project in the Danish waters near Køge. -
Project Manager For Baltic Pipe ProjectWasa Dredging Oy Ltd Apr 2021 - Jul 2021Providing trenching services with a Backhoe Dredger for the Baltic Pipeline, a gas pipe between between Denmark and Poland www.baltic-pipe.eu. The trenches made will provide a shelter and natural protection for the gaspipe. Services are rendered through our client Rohde Nielsen from Denmark. -
Project Manager For Capital Dredging Works To 15.0 M Depth In Klaipėda State SeaportWasa Dredging Oy Ltd Mar 2021 - Jul 2021Removing the bulk of the material using a Backhoe Dredger and transport the dredged soils with help of several Self Propelled Split Hopper Barges to an offshore appointed disposal area. Works are monitored using bathymetric survey techniques. In total to remove some 1 million m³ in about 16 weeks. Working as Subcontractor to Rohde Nielsen. -
Project Manager Kokkola Harbour And Fairway Deepening ProjectWasa Dredging Oy Ltd Jul 2018 - Mar 2021Vaasa Area, FinlandIn the project the Kokkola Harbour and Fairway are deepened to receive bigger vessels. The works include the removal of contaminated soils, cleanup of UXO areas after which the dredging of several soil types varying from soft clays till rock will start. The suitable granular soils are to be used to build the bunds for the disposal areas. Materials are disposed of according their characteristics in six separate dumps. As part of the project also a new erosion protection is being installed near… Show more In the project the Kokkola Harbour and Fairway are deepened to receive bigger vessels. The works include the removal of contaminated soils, cleanup of UXO areas after which the dredging of several soil types varying from soft clays till rock will start. The suitable granular soils are to be used to build the bunds for the disposal areas. Materials are disposed of according their characteristics in six separate dumps. As part of the project also a new erosion protection is being installed near the quay walls nr. 10, 11 and 12. The project is performed in a JV with Van Oord and involves several dredging tools to perform the works. The project is executed under a strict QHSE regime, meaning no part is executed without having the necessary QHSE plans, means and tools in place. The project is handed over in October 2020. Show less -
Project Manager For The Norrköping Hamn Extension ProjectWasa Dredging Oy Ltd Sep 2019 - Dec 2020Interesting multidisciplinary project, which involves dredging, drilling and blasting, removal of contaminated soils, sheet piling, environmental monitoring and survey activities. Wasa Dredging working as Main Contractor. -
Project Manager At The Baltic Connector Pipeline ProjectWasa Dredging Oy Ltd May 2018 - Jul 2019Trenching and Backfilling works for Tideway on the Baltic Connector Pipeline Project. A natural gaspipeline between Finland and Estonia. Works were performed during two years. Responsible for the drafting, implementation and execution of the construction contract(s). Completed to full satisfaction of client and other steak holders! -
Project Manager For Dredging Works In KlaipedaWasa Dredging Oy Ltd Jan 2019 - Jun 2019Dredging of several berth pockets for Van Oord in the port of Klaipeda. Responsible for drafting, implementation and execution of the contract(s). Deployment of backhoe dredge Optimus and several self-propelled split hopper barges, such as Wasa Dredging owned Boann and Sinnan. Completed successfully -
Branch Manager RussiaVan Oord Sep 2014 - Dec 2016Moscow, Russian FederationDevelopment of commercial opportunities for both our dredging as our offshore division, from initial information via commercial advice / proposals and drafting contracts up to execution phase.Operational responsible for the offices, licences, workpermits, taxes, finances, employment and company structures in Russia. -
Branch Manager RussiaVan Oord Jun 2010 - Sep 2014Moscow, Russian FederationDevelopment of commercial opportunities for our offshore division, from initial information via commercial advice / proposals and drafting contracts up to execution phase.Operational responsible for the offices, licences, workpermits, taxes, finances, employment and company structures in Russia. -
Rel. Project ManagerVan Oord May 2011 - Dec 2011Bayderatskaya Bay, Russian FederationDredging and Backfilling of trenches for installation of gas pipelines in Bayderatskaya Bay and Enisey river (Russia).Main equipment used, TSHD's: Vox Maxima, Utrecht and the Geopotes 15. -
Branch Manager RussiaVan Oord Apr 2005 - Nov 2010Saint Petersburg, Russian FederationDevelopment of commercial opportunities for our dredging devision, from initial information via commercial advice / proposals and drafting contracts up to execution phase.Operational responsible for the office, licences, workpermits, taxes, finances, employment and company structures in Russia. -
Project ManagerVan Oord Jun 2010 - Aug 2010Vysotsk, Russian FederationCapital dredging work in the Port of Vysotsk, with TSHD Ostsee -
Project ManagerVan Oord Apr 2009 - Sep 2009Saint Petersburg, Russian FederationReclamation works related to the new Marine Passenger Terminal west of Vasillievski Island. -
SuperintendantVan Oord Jun 2006 - Nov 2007Saint Petersburg, Russian FederationDredging and Reclamation works related to the new Marine Passenger Terminal west of Vasillievski Island. -
Cost EstimatorVan Oord Feb 2000 - Jan 2006Cost Estimator for several dredging and reclamation projects throughout the world. Screening of tender documents, determine the needs, request of the client, and asses all other factors that influence the work method, planning and pricing of the works. And come with internal and external available resources to the best possible cost level. -
Head Of Support UnitRijkswaterstaat 1998 - 2000Making of RAW and time charter contracts for dredging works, department budgets, analyses of the executed works, contract administration, knowledge databases, quality control. Actively involved in development of TDS-system and the foreshore replanishment programms. -
Contract Administrator / Directie UavRijkswaterstaat 1997 - 1998 -
Supervisor / Contract AdministratorRijkswaterstaat 1996 - 1997RijswijkFor department specialized in dredging works -
TraineeVan Oord Acz Jun 1994 - Oct 1994
-
TraineeBoskalis Jan 1994 - Jun 1994
Anko Bos Skills
Frequently Asked Questions about Anko Bos
What company does Anko Bos work for?
Anko Bos works for Wasa Dredging
What is Anko Bos's role at the current company?
Anko Bos's current role is Project Manager for the Paldiski Harbour Terminal 6A Project.
What is Anko Bos's email address?
Anko Bos's email address is an****@****ail.com
What schools did Anko Bos attend?
Anko Bos attended Stichting Bedrijfskunde, Hanze, Winschoter Scholen Gemeenschap (Wsg).
What are some of Anko Bos's interests?
Anko Bos has interest in Sailing.
What skills is Anko Bos known for?
Anko Bos has skills like Dredging, Contract Management, Inspection, Civil Engineering, Maritime, Reclamation, Project Planning, Construction, Contract Negotiation, Pipelines, Procurement, Engineering.
Who are Anko Bos's colleagues?
Anko Bos's colleagues are Sami Turppo, Mihkel Pajula, Philip Norrdahl, Janne Huhtala, Pekka Lievonen, Jonas Wilson, Lionel Mgonda.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial