Manager Geology
CurrentProject: Detailed Design and project management consultancy service for construction of tunnel bridge and formation of work from chainage(18+444 to 33+097): Tunnel No 02 (6460m), Bridge No 03 (Guller ) Embakment at Guller (600m), Tunnel No 03 (6720m), Minor Bridge 2 nos, and Emb. Byasi station Part Yard (450m) Yuksel Proje A under package 2 in connection with new single line broad gauge railway between rishkesh and karnaprayaag 125km in the state of uttarakhand Key responsibilities: Review of geological data available for tunnel and bridge structures,Review and Supervision of tunnel geological mapping, 3-d logging, Q-value, RMR/rock classification, reviewing tunnel supporting system and slops stabilisation, supporting as per geological condition, review of design document and drawing for the tunnel and rock slope, probing for advance assessment of geological condition, review instrumentation and monitoring data for the tunnel and rock slope