António Nôro
AeroLeads people directory · profile

António Nôro Email & Phone Number

Works Manager (Dredging and Rock Installation) at DEME Group
Location: Soure, Coimbra, Portugal 14 work roles 5 schools
1 phone found area 191 LinkedIn matched
✓ Verified Jul 2026 4 data sources Profile completeness 100%

Contact Signals · 1 phone

Direct phone (191) ***-****
LinkedIn Profile matched
3 free lookups remaining · No credit card
Current company
Role
Works Manager (Dredging and Rock Installation)
Location
Soure, Coimbra, Portugal
Company size

Who is António Nôro? Overview

A concise factual answer block for searchers comparing this professional profile.

Quick answer

António Nôro is listed as Works Manager (Dredging and Rock Installation) at DEME Group, a with 5197 employees, based in Soure, Coimbra, Portugal. AeroLeads shows phone signal with area code 191 and a matched LinkedIn profile for António Nôro.

António Nôro previously worked as Construction Manager EPC (Marine & Infrastructure) at Deme Group and Works Manager (Dredging) at Deme Group. António Nôro holds Master’S Degree, Master In Mining And Geological Engineering from Universidade De Coimbra.

Company email context

Email format at DEME Group

This section adds company-level context without repeating António Nôro's masked contact details.

DEME Group

Review company-level records connected to António Nôro before choosing the right outreach path.

Profile bio

About António Nôro

António Nôro is a Works Manager (Dredging and Rock Installation) at DEME Group. They possess expertise in engenharia, autocad, ms project, pyramid, visual basic and 32 more skills. They is proficient in French, Spanish and English.

Listed skills include Engenharia, Autocad, Ms Project, Pyramid, and 33 others.

Current workplace

António Nôro's current company

Company context helps verify the profile and gives searchers a useful next step.

DEME Group
Deme Group
Works Manager (Dredging and Rock Installation)
Soure, PT
Website
Employees
5197
AeroLeads page
14 roles

António Nôro work experience

A career timeline built from the work history available for this profile.

Works Manager (Dredging And Rock Installation)

Soure, Pt

Construction Manager Epc (Marine & Infrastructure)

Current

Port-La-Nouvelle, Occitanie, France

Port-La-Nouvelle Port Extension Project, Port-La-Nouvelle, France

Dec 2023 - Present

Works Manager (Dredging)

Porto, Portugal

Acessibilidades Marítimas do Porto de Leixões, Porto, PortugalCapital dredging of the entrance channel and turning basin of the Port of Leixões, Portugal to depths of 16,85 and 15,50 meters, respectively, and reusage of part of the dredged material (granite rock) for the extension of the exterior breakwater of the Port of Leixões by 300 meters, being the remaining material dumped offshore. Dredging works were performed with TSHDs (Trailing Suction Hopper Dredgers) and a CSD (Cutter… Show more Acessibilidades Marítimas do Porto de Leixões, Porto, PortugalCapital dredging of the entrance channel and turning basin of the Port of Leixões, Portugal to depths of 16,85 and 15,50 meters, respectively, and reusage of part of the dredged material (granite rock) for the extension of the exterior breakwater of the Port of Leixões by 300 meters, being the remaining material dumped offshore. Dredging works were performed with TSHDs (Trailing Suction Hopper Dredgers) and a CSD (Cutter Suction Dredger) and rock installation in the breakwater core with SHB (Split Hopper Barge). Estimated total project cost: € 130,2 million. Show less

Jul 2022 - Nov 2023

Works Manager (Dredging & Land Reclamation)

Altamira, Tamaulipas, Mexico

Altamira Port Deepening Project, Altamira, MéxicoCapital dredging of the entrance channel, turning basin and inner port of the Port of Altamira, Mexico, to depths up to 15,30 meters, and reusage of part of the dredged material (sand) for the hydraulic filling of a port area inland. The dredging works were performed with a TSHD (Trailing Suction Hopper Dredger and a CSD (Cutter Suction Dredger). Estimated total project cost: US$ 38,0 million.

Feb 2023 - Apr 2023

Project Controls Manager / Deputy Engineering Manager (Dredging)

Porto, Portugal

Acessibilidades Marítimas do Porto de Leixões, Porto, PortugalCapital dredging of the entrance channel and turning basin of the Port of Leixões, Portugal to depths of 16,85 and 15,50 meters, respectively, and reusage of part of the dredged material (granite rock) for the extension of the exterior breakwater of the Port of Leixões by 300 meters, being the remaining material dumped offshore. Dredging works were performed with TSHDs (Trailing Suction Hopper Dredgers) and a CSD (Cutter… Show more Acessibilidades Marítimas do Porto de Leixões, Porto, PortugalCapital dredging of the entrance channel and turning basin of the Port of Leixões, Portugal to depths of 16,85 and 15,50 meters, respectively, and reusage of part of the dredged material (granite rock) for the extension of the exterior breakwater of the Port of Leixões by 300 meters, being the remaining material dumped offshore. Dredging works were performed with TSHDs (Trailing Suction Hopper Dredgers) and a CSD (Cutter Suction Dredger) and rock installation in the breakwater core with SHB (Split Hopper Barge). Estimated total project cost: € 130,2 million. Show less

Jun 2021 - Jun 2022

Works Manager (Land Reclamation) / Quarry Qa/Qc Manager

Szczecin, Zachodniopomorskie, Poland

Świnoujście-Szczecin Fairway Deepening Project, Polandwidening the channel to a minimum of 100 m and deepening it to a depth of 12.5 m along with the reconstruction of the shoreline slopes without fortifications, bottom levelling, construction and reconstruction of shore protection and marine structures together with the adjacent infrastructure, deepening and widening the Turning Basins and Land Reclamation of two artificial island of 1,3 km and 1,8 km of diameter… Show more Świnoujście-Szczecin Fairway Deepening Project, Polandwidening the channel to a minimum of 100 m and deepening it to a depth of 12.5 m along with the reconstruction of the shoreline slopes without fortifications, bottom levelling, construction and reconstruction of shore protection and marine structures together with the adjacent infrastructure, deepening and widening the Turning Basins and Land Reclamation of two artificial island of 1,3 km and 1,8 km of diameter. Estimated total project cost: € 313,0 million. Show less

Feb 2021 - Jun 2021

Project Controls Manager / Deputy Project Manager (Dredging & Land Reclamation)

Setúbal, Portugal

Melhoria da Acessibilidade Marítima ao Porto de Setúbal, PortugalCapital dredging of the access channel to the Port of Setúbal, Portugal, over an extension of approximately 12.8 km and Turning Basin, with land reclamation works at the east of the Ro-Ro terminal, and the excess material dumped offshore. The dredging works were performed by a TSHD (Trailing Suction Hopper Dredger). Project cost: € 16,0 million.

Oct 2020 - Feb 2021

Opportunity And Risk Management Engineer Eci

Belgium

ECI & Tender for Amaala Triple Bay Marine Basin, Saudi ArabiaA competitive Earlier Contractor Involvement (ECI) with simultaneous Tendering for a Design and Build (D&B) project, Amaala Triple Bay Marina Basin, which included the development of the BoD, ITT documents and Client’s requirements that would be the base for the D&B Bid proposal. This project, consisted of the development of a ‘Marina Basin’ requiring approximately 2,000 meters of quay wall and it includes the… Show more ECI & Tender for Amaala Triple Bay Marine Basin, Saudi ArabiaA competitive Earlier Contractor Involvement (ECI) with simultaneous Tendering for a Design and Build (D&B) project, Amaala Triple Bay Marina Basin, which included the development of the BoD, ITT documents and Client’s requirements that would be the base for the D&B Bid proposal. This project, consisted of the development of a ‘Marina Basin’ requiring approximately 2,000 meters of quay wall and it includes the excavation of a basin, the main entrance channel to the Marina from the Red Sea, two flushing channels and rock revetment installation. Show less

Jul 2020 - Sep 2020

Project Controls Manager (Dredging)

Setúbal Area, Portugal

Melhoria da Acessibilidade Marítima ao Porto de Setúbal, PortugalCapital dredging of the access channel to the Port of Setúbal, Portugal, over an extension of approximately 12.8 km and Turning Basin, with land reclamation works at the east of the Ro-Ro terminal, and the excess material dumped offshore. The dredging works were performed by a TSHD (Trailing Suction Hopper Dredger). Project cost: € 16,0 million.

Oct 2019 - Jun 2020

Superintendent (Dredging & Rock Installation)

Reunion

Nouvelle Route du Littoral, MT 5.2, La ReunionWorks package for the construction of a causeway (MT5.2) of a coastal road of 12.5 km long, comprising three main segments, a 5.4 km long coastal viaduct (MT3) and two causeways (MT5.1 and MT5.2). The dredging and rock installation works of the MT5.2 was performed with a BHD (Backhoe Dredger) and SSDV (Side Stone Dumping Vessel). Estimated total project cost: €1,66 billion.

May 2019 - Sep 2019

Superintendent (Underwater Drilling And Blasting & Rock Dredging)

Karwar E Região, Índia

Project Seabird – Phase II A, IndiaDevelopment of the Seabird Navy Port in Karwar, state of Karnataka, India. The work package MWC01 comprise the works of dredging, reclamation, revetment installation, quarrying and navigational aids. The underwater D&B was performed by a dedicated pontoon equipped with purpose design drill rigs and the following dredging works were performed by means of a BHD (Backhoe Dredger) and a TSHD (Trailing Suction Hopper Dredger). Project… Show more Project Seabird – Phase II A, IndiaDevelopment of the Seabird Navy Port in Karwar, state of Karnataka, India. The work package MWC01 comprise the works of dredging, reclamation, revetment installation, quarrying and navigational aids. The underwater D&B was performed by a dedicated pontoon equipped with purpose design drill rigs and the following dredging works were performed by means of a BHD (Backhoe Dredger) and a TSHD (Trailing Suction Hopper Dredger). Project estimated cost: € 1,7 billion. Show less

Sep 2017 - Apr 2019

Site Manager

Widnes, United Kingdom

The Mersey Gateway Project (Main Bridge), United KingdomSub-contract works for the main bridge superstructure construction at the Mersey Gateway Project. The main works include the construction of a cable-stayed, using inferior Form Travellers, with three towers that, including the approach viaducts on each side, has 2,130 metres long with a river span of 1,000 metres. Project estimated cost: £ 600 million (€ 696 million).

Jan 2017 - Aug 2017

Deputy Production Manager

Vila Real, Portugal

A4/IP4 - Marão Tunnel, PortugalContract in designing/building of two road tunnels of 12 meters diameter, about 100 m2 section, approximately 12 kilometres in total length. The main works include excavation using explosives and the final lining execution in reinforced concrete. Contract value: € 88,8 million.

Aug 2015 - Jan 2016

Site Engineer (Tunnel Excavation And Construction)

Vila Real, Portugal

A4/IP4 - Marão Tunnel, PortugalContract in designing/building of two road tunnels of 12 meters diameter, about 100 m2 section, approximately 12 kilometres in total length. The main works include excavation using explosives and the final lining execution in reinforced concrete. Contract value: € 88,8 million.

Jan 2015 - Aug 2015
Team & coworkers

Colleagues at DEME Group

Other employees you can reach at deme-group.com. View company contacts for 5197 employees →

5 education records

António Nôro education

Master’S Degree, Master In Mining And Geological Engineering

(In Progress) Knowledge’s in earthworks engineering, prospecting of natural resources, applied hydrogeology, underground exploration, open.

Master In Civil Engineering (Integrated Master), Geotechnics

Knowledge’s in rock mechanics, critical state soil mechanics, earthworks engineering, geotechnical earthquake engineering, excavation.

Bachelor At Civil Engineering Sciences (Integrated Master), Civil Engineering

Knowledge’s in maths, applied mathematics, physics, chemistry, technical drawing, applied static’s, structural analysis, reinforced.

Insurance Agent, Non-Life

Instituto De Seguros De Portugal

High School In Scientific, Scientific-Humanistic Of Sciences And Technologies

Instituto Pupilos Do Exercito
FAQ

Frequently asked questions about António Nôro

Quick answers generated from the profile data available on this page.

What company does António Nôro work for?

António Nôro works for DEME Group.

What is António Nôro's role at DEME Group?

António Nôro is listed as Works Manager (Dredging and Rock Installation) at DEME Group.

What is António Nôro's phone number?

AeroLeads has found 1 phone signal(s) with area code 191 for António Nôro at DEME Group.

Where is António Nôro based?

António Nôro is based in Soure, Coimbra, Portugal while working with DEME Group.

What companies has António Nôro worked for?

António Nôro has worked for Deme Group, Construgomes Engenharia S.A., and Epos - Empresa Portuguesa De Obras Subterrâneas, S.A..

Who are António Nôro's colleagues at DEME Group?

António Nôro's colleagues at DEME Group include Michel Verburgh, Stam Richard, Joao Teodoro, Gayathri Vijayakumar, and Valerio Finco.

How can I contact António Nôro?

You can use AeroLeads to view verified contact signals for António Nôro at DEME Group, including work email, phone, and LinkedIn data when available.

What schools did António Nôro attend?

António Nôro holds Master’S Degree, Master In Mining And Geological Engineering from Universidade De Coimbra.

What skills is António Nôro known for?

António Nôro is listed with skills including Engenharia, Autocad, Ms Project, Pyramid, Visual Basic, Rocscience, Plaxis, and Microsoft Excel.

Find 750M verified contacts

Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.

People with similar names

Check these profiles if this is not the António Nôro you were looking for.

View similar profiles