Arif Hashmi personal email
- Valid
Arif Hashmi is a Manager I and E and Technical Authority ICE at BP Pakistan Exploration & Production.
Bp Pakistan Exploration & Production
-
Manager I And E And Technical Authority IceBp Pakistan Exploration & ProductionPakistan
-
Manager I & E & Technical Authority IceBp Pakistan Exploration & Production Aug 2009 - PresentKarachi PakistanProjects in hand:1. Looking after project Instrument upgrade with complete Automation of LPG and Gas Plant based on SIL 2 safety instrumented system for ESD system and Control System (BPCS) for plant instrument.Project Cost - 1.4 Million USD.2.Custody transfer meter project for BP Pakistan operation, along with Prover for meter proving system for Oil Dispatching system.Project Cost - 1.4 Million USD.3.Moisture analyzer system for BP Pakistan worth of Project Cost - 0.50 Million USD.4.Unmanning project Laghari Oil Facility with complete SCADA systemProject Cost - .45 Million USD5.Projects Gas Compressor in BP.Lead for ICE on 04 Gas compressor projects in BP Pakistan Project Cost: Each project cost 2.5 Million USD.Added Role in Projects:1.Role as Commissioning Engineer for ICE (Instrument, Control and Electrical) For Gas Compressors in BP Pakistan in absence of Expiate Engineer.2.Role is shared as Technical Authority in BP Pakistan for ICE.3.Lead on all Instrument, Control and Electrical in Projects and Engineering.4.RCFA member for Incident Investigation Teams in special reference to expertise in ICE.Jobs done in Projects:1.Project and Engineering conceptualization based on Functional Safety and IEC-61508/61511 Functional Safety Standards. Establishment of SOR (Specification of Requirement) of Automation of LPG and Dehydration/Amine plant based on SIL 2 application2.Developed basic requirements for the Instruments & Control System under the De-bottlenecking Project.3.Involved in the Process Instruments, Control Valves, Fire & Gas Devices, Shutdown valves, Process Control System and Safety Instrumented Systems (SIS) selection/Ordering.4.Reviewed Engineering Design from Contractor as per the SOR (Specification of Requirement). 5.Co-ordination with the Engineering team on Instrument, Control System & Safety Instrumented System (SIS) & Electrical Design Technical Issues in project package.
-
Maintenance SuperintendentBp Pakistan Exploration & Production Inc Jul 2006 - Aug 2009Developed maintenance procedures and identified critical spares for plant inventory. Trained Production Staff and Instrument Technicians. Lead team 24 Instrument and Electrical Techs, Supervisor and Engineers.Responsible for troubleshooting for Instrument and Electrical based network.Identified critical spares and reviewed & optimized the existing heaters & incinerators inventory.Developed and implemented the extensive proactive maintenance strategies for the process instrumentation, control valves, fuel skids, SCADA all power and instrumentation network.Manage maintenance KPI's through Maximo and Crystal reporting. Key member for the launch of Maximo, maintenance database management system in BP Pakistan.Documentation Management from Instrument & Electrical related procedure. Collected, compiled and analyzed the history data for the identification of repetitive problems.Carried out complete SIS System Audit with the Vendor engineer as per the methodology developed. Developed engineering solution to improve the overall SIS System architecture with increased reliability.Review critical spares for inventory.Implemented the Audit recommendations. Compiled a detail report on the Audit. ESD system, complete design overview and Troubleshooting and yearly PM.
-
Project Engineer/TechnologistTg Engineering Inc Sep 2005 - Jul 2006Project, Design and Commissioning Engineering for Tallow Oil Company, England project in Bangladesh, Complete conceptualization and Bid document for I & E scope and project timeline and costing.Complete design of MCC and Power network. Ordering, approval and FAT of the system.Complete design of Control System based on AB Contrologix PLC and HMI. FAT with Client and Commissioning of the Plant in Bangor Gas Field in BangladeshScope of Work for Area Classification for Projects in Alberta as per NA standards.Worked Water management system and other PLC based project in CANADA with programming and Commissioning of Contrologix and HMI.Worked as PLC expert in Alberta for up gradation of PLC and Automation network for different companies in Alberta, like Conaco Philips, Shell & bp etc.
-
I & E EngineerBp Pakistan Exploration & Production Inc Nov 1998 - Aug 2005Maintenance activities pertaining to instruments such as Pressure Safety Valves, Pneumatic/ Digital process variable controllers, Control Valves, Gas Flow Meters, RTDs and Thermocouples, Turbine Meters, Transmitters, Recorders etc. Maintenance activities pertaining to electrical such as Generators, MCC System, PLC programming and troubleshooting, UPS, Power distribution network. Collected, compiled and analyzed the history data for the identification of repetitive problems.Hand son Allen Bradley and Siemens PLC and designing of HMI screens & graphics and Murphy based software Like Millennium Controller and IO Tool Kit.Caterpillar (Gas /Diesel) Generators controlsWoodward Speed Governors (2301 A), Load Sharing Modules & SPMA synchronizers3 phase Induction Motors controls and Soft Starter Units (Siemens/Benshaw) Switchgear system up to 1600 Amps, MCC design and calculation for single line, power cables based on IEC, NEC and CEC codes. As Maintenance Involve in troubleshooting of the switchgear system as well.Troubleshooting and Maintenance of Gas Compressors controls (Murphy), Jet pumps and Water Injection Pumps and MCC's.Three Phase UPS units (15KVA - Solid State Controls Inc. and HDR) and Battery Chargers. Troubleshooting and maintenance. Design, specification for maintenance
-
Design EngineerZelin Pvt. Limited Mar 1996 - Sep 1998Instrument and Power system design of SEPCOL 123 MW project with ABB and BC Hydro Canada, Developed basic methodology for the Process Safety System Re-assurance Program. Design if MCC, UPS, lighting & fire Alarm system for the power plant along with power distribution network based on NEC and BS requirement. Design of PLC and Control system for Power plant Utility System, Worked on SLC software and HMI page development. Commissioning of Fire water control system and all Zelin Supplied power and control instrumentation. .
Arif Hashmi Education Details
-
Electrical, Instrumentation, Electronics And Power
Frequently Asked Questions about Arif Hashmi
What company does Arif Hashmi work for?
Arif Hashmi works for Bp Pakistan Exploration & Production
What is Arif Hashmi's role at the current company?
Arif Hashmi's current role is Manager I and E and Technical Authority ICE.
What is Arif Hashmi's email address?
Arif Hashmi's email address is ha****@****ail.com
What schools did Arif Hashmi attend?
Arif Hashmi attended Ned University Of Engineering And Technology.
Not the Arif Hashmi you were looking for?
Free Chrome Extension
Find emails, phones & company data instantly
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial