Marine Engineer
CurrentResponsible for all the projects related to : 1. Vessel Modeling 2. Vessel Hydrostatic Analysis and Validation 3. Vessel Ballasting ( Loadout and/or Transportation analysis) 4. Vessel Hydrodynamic Analysis 5. Vessel Mooring Analysis (Catenary) 6. Pipeline and other Flexible Structure Analysis Notable Project Experience :1. PC KETAPANG II LTD - Provision Of EPCIC Of BTJT-B Wellhead Platform, Infield Pipelines, And Host Tie-In Modification For Bukit Tua Phase 2B Development Project- Jacket Transportation and Motion Analysis2. PT. PERTAMINA HULU MAHAKAM - Engineering, Procurement, Supply, Construction, and Commissioning Contract for North Sisi, North Nubi, and Jumelai Project- Transportation Analysis for JML1 Topside, WPS3 Topside-Jacket, and WPN4 Topside3. LUKOIL - Detailed Design Documentation for Subsea Multiphase Interfield Pipeline Construction at V. Grayfer Field Development Project- Pipeline Above Water Tie-In Analysis- Armada Constructor Mooring Analysis- Armada Installer Mooring Analysis4. CHEVRON - 2022 Wellhead Platform And Pipeline Installation And Wellhead Platform Removal Campaign-Platforms Removal (SET 13) Transportation Analysis-Platforms Removal (SET 14) Transportation Analysis5. PETRONAS Carigali Sdn. Bhd. - Provision Of Engineering, Procurement, Construction, Installation And Commissioning (EPCIC) Alliance For Kasawari Carbon Capture & Storage (CCS) Project - KSCCS Substructure Launching Analysis Report- KSCCS Substructure Floatation And Upending Analysis Report - Structural Integrity6. EPCI Contract for Pipeline Project 2024 - Package 2 (UYA-UA, UA-UWJ, ESA-EPRO).- ESA - EPRO Mooring Analysis for Pipeline Installation (Start-up, Normal Lay, A&R and Laydown)- UYA-UA, UA-UWJ, & ESA-EPRO Riser Spool Installation (Stalk-on and Subsea Tie-in Method)7. Other Project - Pipeline Detail Engineering Design- On-Bottom Roughness Analysis- On-Bottom Stability Analysis- Expansion Analysis- Dynamic and Static Pipelay Analysis