Arun Valleti Email & Phone Number
Who is Arun Valleti? Overview
A concise factual answer block for searchers comparing this professional profile.
Arun Valleti is listed as Site Manager - DEWA 132 and 11 KV Substation Construction at Danway Electrical & Mechanical Engineering LLC, a with 840 employees, based in Dubai, United Arab Emirates. AeroLeads shows a matched LinkedIn profile for Arun Valleti.
Arun Valleti previously worked as Site Manager - DEWA 132/11 KV Substation Construction at Danway Electrical & Mechanical Engineering Llc and Site Manager - EtihadWE - 33/11 KV Substaions Construction at Danway Electrical & Mechanical Engineering Llc. Arun Valleti holds Bachelor'S Degree, Electrical And Electronics Engineering, First Class from Sri Venkateswara University.
Email format at Danway Electrical & Mechanical Engineering LLC
This section adds company-level context without repeating Arun Valleti's masked contact details.
Review company-level records connected to Arun Valleti before choosing the right outreach path.
About Arun Valleti
I have 23+ years solid Experience in Construction of 220/132/33/11 kV GIS Substations & Associated Cabling Works as a Site ManagerHolds both Diploma & B Tech in Electrical & Electronic Engineering with Division First class.Gained 16+ Years Gulf Experience and worked in all Major clients like DEWA, ADWEA, TRANSCO, AADC, ADDC, FEWA, SEWA, & OMAN Transco etc.Strong Motivational & dedicated Team Player to work in any type of Multi national Leading Organization.
Listed skills include Project Engineering, Project Management, Project Planning, Electricity, and 14 others.
Arun Valleti's current company
Company context helps verify the profile and gives searchers a useful next step.
Arun Valleti work experience
A career timeline built from the work history available for this profile.
Site Manager - Dewa 132/11 Kv Substation Construction
Project : Construction, Supply Installation Testing and Commissioning of MOSTWDAT 132/11 kV Substation and Associated WorksClient : Dubai Electricity & Water Authority (DEWA) Location : Dubai, UAE Position : Site Manager Period : Nov 2023 to Till Date Responsibilities : Approved Site Manager for DEWA’s new concept of DOSS (Digitally Optimized Sub Station) Project at 132/11 kV MOSTWDAT S/S. Implementation of LEAN approach (OBS structure & Scrum framework) for ITC phase to achieve in 6 months duration of the 132/11kV Substation project. Organizing Daily SCRUM meetings with Client and schedule Weekly / Monthly SPRINT Mapping of Progress. Site in charge for overall site level Focal point for coordination and daily operations. Overall Site level responsible for implementation of HSE procedures & Quality practices MSRA approval as per HSE manual & PQP plan with ITP & Checklist. Coordination with Design Team for Drawings RFC approval & material MTS approvals. Vendor Coordination for Dispatch clearance and Delivery of Major Long Lead items of various equipments and Materials to the site. Request raising for RCDR / SRC inspections and certification followed by CIF invoicing. Coordination of Various teams for achieving the MEP Access clearances & Equipment Access clearances.
Site Manager - Etihadwe - 33/11 Kv Substaions Construction
Project : 163E/2019 – 33/11 kV Distribution Substation Works in North Area.Client : Etihad Water & Electricity (ETIHAD WE) Location : Ras Al Khaimah, UAE Position : Site ManagerPeriod : Dec 2021 to Nov / 2023 Responsibilities : Approved Site Manager and Successfully Completed SEBU 33/11 kV S/S and delivered to client as per given Target dates. Coordinated & Achieved various Commissioning Procedures as per ETIHAD WE requirement timely to energize the substation. Microlevel Scheduling, Planning, Design Coordination, Bill of Materials, Resource Forecast deployment, Budget estimation, Costing, Vendor coordination for deliverables. Lead the various Site Teams mainly civil construction, Equipment installation, Testing & commissioning activities. Organize various Site Progress Review Meetings with the client/ consultant and planning of Agenda and MOM points record and follow up for target completion. Respond and comply Site Notes immediately in coordination with design team and vendors as per specification standards of the project. Overall Site level responsible for implementation of HSE procedures & Quality practices for Activity based MSRA as per HSE manual & PQP plan with ITP & Checklist forms. Direct Supervising & executing all the Electrical works, Coordinate for Civil, MEP clearances for various stages of the Project execution. Prepare and submit Monthly LTE Progress Measurements and obtain approval from client/ consultant.
Construction Manager - Brick Built Substation In 33 & 11Kv Distribution Network - Al Ain
Project : Supply, Installation & Construction of 11/0.415 kV Brick Built S/S (100 Nos.)Client : Al Ain Distribution Company (AADC) Location : Al Ain, UAE Position : Construction Manager - SubstationsPeriod : July 2019 to Dec 2021 Responsibilities : Overall Site in charge for construction of 100 nos. Brick Built sub-stations. Successfully completed more than 100 nos. shutdowns for 11kV Load diversion works and energization in AADC Power Distribution network. Preparation and approval of 100 Nos. sub-Station Survey plans, Scheme drawings, SLDs, Temp./Final load diversion drawings, Earthing/ Lightning protection & Equipment Layouts, Commissioning reports and as built drawings. Deploying and monitoring parallel activities with more than 10 Nos. different construction Teams based on area wise mobilization and demobilization techniques. Daily work allocation to various Teams & Weekly target % of progress planned Vs achieved in line with Baseline schedule. Implementation of HSE procedures & Quality methods as per approved client ITP & Checklist templates. Prepare and submit Monthly Re-measurable Progress certification and obtain approval from client/ consultant.
Site Manager - Dewa, 132/11 Kv Substaion Construction
Project : 132/11 kV Substations @DUBAI CRYSTAL & MARINA COMMUNITY. Client : Dubai Electricity & Water Authority (DEWA) Location : Dubai, UAE Position : Site Manager Period : Sept 2016 to July 2019 Responsibilities : Approved Site Manager for 132/11kV Substation site. Coordination with Area developer for various NOC / Permit approvals and target to give Workfront for various infrastructure & Area development Projects. Overall Site In charge for Coordination, execution supervision control / monitoring Site progress of works like Civil, MEP, ELECTRICAL, TELECOM & SCMS including Testing & commissioning works. Plan for various site construction & installation activities in line with project BL schedule and coordination between various sub-Contractors & Vendors timely delivery of equipments. Forecast Resource and deployment timely, Cost control, productivity measures. Day to day Follow up & coordinate for Civil / MEP construction works completion timely for Installation of various electrical Equipment’s / panels and cables and SCMS system as per given Mile stone dates. Reviewing OEMs GA & Scheme & installation drawings of various equipment’s such as IDT, GIS, AIS, ET, C&R Panel, Cap Bank, LVAC, DC & Cables etc. and obtain RFC drawings approval timely to progress site works effectively. Implementation of Safety& Quality procedures, MSRA and achieve the overall Site Progress as per given time frame.
Site Manager - Fewa 33/11 Kv Substations Construction
Project : E19/2012(1): 33/11 kV Substation works in Northern Emirates. Client : Federal Electricity & Water Authority (FEWA) Location : Ras Al Khaimah, UAE Position : Site Manager Period : July 2013 to Sept 2016 Responsibilities : Approved Site Manager initially for 3# New&2# Exist. 33/11 KV S/S modification works. Repot to Project Manager Day to day progress of Site Establishment works. Civil & Electrical Design coordination for issue of RFC drawings and MTS approvals to progress the site works affectively. Supervising site activities and follow up with Sub Contractors team at Site for timely mobilisation of various work fronts. Overall responsible for Site Execution in line with Scope, Contractual procedure & tech. specs/standards as per client requirements. Resource (Material, Machinery &Manpower) planning allocation & controlling depends on the project running phase. Co-ordination for Site Progress Review Meetings with the client, consultant, Subcontractor & vendors at site.
Sr. Project Engineer- Oetc - 220/132/11 Kv Grid Station Construction
Project : New 220/132 kV Grid Station with 400 kV OHL & 220 KV UG Cabling works Client : Oman Electricity Transmission Company (OETC) Location : Sur, Oman Position : Sr. Project Engineer Period : Jan 2011 to July 2013 Responsibilities : Approved Sr. project Engineer for Sub-station Electrical works OETC competency Permit Holder for Modification works in the Existing 132 kV S/S. Overall Site Electrical In charge for 220/132 kV Grid station Construction works. Review of all vendor drawings such as Power Tr., GIS, NER, EAT, C&R Panel, Power Cables etc. Direct supervision of Site installation and testing and commissioning works in the Substations. OEM coordination for 220 kV GIS, 132 kV GIS & 500 MVA Transformer, C& R Panels installation and Testing works at site level. Prepare technical submittals, Coordinate Material procurement, delivery and installation as per Client Standard Technical specifications. Preparation of Cable schedules and supervise laying and termination at site level. Supervision of the Shut down and extension works in132/33/11kV Switch yard works in ex. S/S Prepare and submit Monthly LTE site Progress Measurements for certification.
Project Engineer -132 Kv & 33/11 Kv Substation Modification & Extension Works
Project : E11/2009: - 132/33/11kV Substation works in Northern Emirates. Client : Federal Electricity and Water Authority (FEWA). Consultant : Mott MacDonald LLC (MML)Location : Ajman, UAE Position : Project EngineerPeriod : April 2010 to December 2010 Responsibilities : Site Execution, installation, modification & Shutdown works in Existing.132/33 kV substation and modification works. NOC approval, Route PERMITS approvals for 33kV & 11kV UG cabling and FO cable laying works. Vendor /Manufacturer co-ordination for dispatch clearance and timely delivery of various Equipments & Materials to the site. Attend IDT, ET, LVAC Panels FAT inspection with client / Consultant Engineers & submission of FAT MOM compliance & coordinate for issuance of dispatch clearance. Prepare Micro Schedules for Various Site Activities and get client approvals. Supervision of Installation of various Major Equipments as per approved MSRA and RFC drawings at site. coordination with Testing Team and support the site execution team to complete the balance works timely.
Sr. Electrical Engineer - Aadc -33/11 Kv Substations Construction & Ug Cabling
Project : Expansion & Reinforcement of 33/11 kV Substations & Network in Al Ain Client : ADWEA/ AADC Location : Al Ain, UAE Position : Sr. Electrical Engineer Period : September 2007 to April 2010 Responsibilities : Site Electrical Engineer for 3 Nos of 33/11kV Distribution Substation Works. Planning, execution, monitoring & control of Project baseline Schedules of works as per Work Breakdown Structure (WBS) System. Preparation of Technical submittals, Material planning, approvals, receipts, inspection and installation as per Client Standard specification. Preparation of Method Statements & Risk Assessment for site level installation, Testing & commissioning activities. Supervise the 33 kV GIS, 11kV AIS switchgear, 20/25 MVA HVDT Transformer, Outdoor type Capacitor Banks and Aux Transformer, C&R panels & SCADA/Telecom panel’s 110V & 48V DC system installation, Testing and commissioning works. Power, Control, Telecom and SCADA Cable Schedule Preparation, Laying in Cable ladders/Trays & Supports and Termination Woks. UG Power Cables & FO cable works- Route approvals, installation in Trench, testing, termination and energizing works. Co-ordination / Support design team by providing existing station equipment’s field data for modification of remote end works in ex-stations. Preparation of Daily / Weekly Site Progress Reports and Raise Inspection (RFI) for client / consultant inspection.
Project Engineer - Hvds Project For 11Kv System Improvement
Project : Conversion of 3-Ǿ LT to HT (11kV) network in HVDS Project, Tirupati, INDIA. Client : APSPDCL / AP TRANSCO Location : Tirupati, INDIA Position : Project Engineer Period : January 2006 to September 2007 Responsibilities : Approved project Engineer for HVDS project in Southern region. Site survey, peg markings, route approvals with local authorities as per approved existing route design drawings. Conversion of LT 3-Ǿ Network to HT Network in High Voltage Distribution System (HVDS) Project. Layout Design, drafting of 11KV & LT Network Diagrams using Auto CADD and obtaining authority engineer approvals. Supervision of Pole Erection, Installation, Testing and Commissioning of Pole Mounted Transformers along with laying & Termination of LV AB cable. Co-ordination with client for work done BOQ Inspections and submission of Monthly Billing documents to client.
Maintenance Engineer - 33 Kv Out Door Substations & 11Kv Capacitor Banks
Project : System expansion& Improvement of 11 kV Network Client : AP DISCOM / AP TRANSCO Location : Tirupati, INDIA Position : Maintenance Engineer Period : April 2000 to April 2005 Responsibilities : Erection and Installation of 11kV & 33kV AIS switch Gear and Vacuum Circuit Breakers (VCB) at 33/11kV Out door Switchyards. Installation, testing, Commissioning of 11KV, 2 MVAR Capacitor banks including maintenance works. Erection, installation and testing of Distribution transformer, Control & Protection Panels, switch gear panels. Maintenance of Circuit Breakers, Control Panels, CT, VT and Auxiliary equipment. Co-ordination for design and site engineering works.
Service Engineer - 11Kv & 33Kv Capacitor Banks & Control Panels
Project : System expansion& Improvement of 11 kV Network Client : AP DISCOM / AP TRANSCO Location : Tirupati, INDIA Position : Service Engineer Period : April 1999 to April 2000 Responsibilities : Erection, installation of 132 kV, 33 KV &11 kV switch yards in primary & Grid stations. Erection, installation, Testing and commissioning and Maintenance of 11 KV, 5 MVAR detuned capacitor/reactor banks. Servicing and Monthly maintenance of 11kV Capacitor Banks. Attending Emergency Outage works for 11kV Circuit Breaker and Control Panels. Data downloading from MVAR &Tri-vector meter for Energy evaluation monthly billing.
Colleagues at Danway Electrical & Mechanical Engineering LLC
Other employees you can reach at danwayeme.com. View company contacts for 840 employees →
Mohammad Arman
Colleague at Danway Electrical & Mechanical Engineering LlcPatna, Bihar, India
View →
JD
James Daniel Dsouza
Colleague at Danway Electrical & Mechanical Engineering LlcUnited Arab Emirates
View →
VP
Vijayan Pillai
Colleague at Danway Electrical & Mechanical Engineering LlcThiruvananthapuram Taluk, India
View →
JC
Jitendra Chavan
Colleague at Danway Electrical & Mechanical Engineering LlcDubai, United Arab Emirates
View →
BP
Baiju Poulose
Colleague at Danway Electrical & Mechanical Engineering LlcDubai, United Arab Emirates
View →
RL
Roger Linsangan
Colleague at Danway Electrical & Mechanical Engineering LlcUnited Arab Emirates
View →
AC
Anoop Chandran
Colleague at Danway Electrical & Mechanical Engineering LlcDubai, United Arab Emirates
View →
NC
Nitin Chavan
Colleague at Danway Electrical & Mechanical Engineering LlcMumbai, Maharashtra, India
View →
SJ
Shine Joseph
Colleague at Danway Electrical & Mechanical Engineering LlcUnited Arab Emirates
View →
YN
Yaser Noor
Colleague at Danway Electrical & Mechanical Engineering LlcRas Al-Khaimah, United Arab Emirates
View →
Arun Valleti education
Bachelor'S Degree, Electrical And Electronics Engineering, First Class
Diploma In Electrical & Electronic Engineering (Deee), Electrical And Electronics Engineering, First Class
Frequently asked questions about Arun Valleti
Quick answers generated from the profile data available on this page.
What company does Arun Valleti work for?
Arun Valleti works for Danway Electrical & Mechanical Engineering LLC.
What is Arun Valleti's role at Danway Electrical & Mechanical Engineering LLC?
Arun Valleti is listed as Site Manager - DEWA 132 and 11 KV Substation Construction at Danway Electrical & Mechanical Engineering LLC.
Where is Arun Valleti based?
Arun Valleti is based in Dubai, United Arab Emirates while working with Danway Electrical & Mechanical Engineering LLC.
What companies has Arun Valleti worked for?
Arun Valleti has worked for Danway Electrical & Mechanical Engineering Llc, Engineering Solutions Electromechanical & General Contracting Llc, Jazeera Emirates Power, National Contracting Company, and Geco M&E Ltd.
Who are Arun Valleti's colleagues at Danway Electrical & Mechanical Engineering LLC?
Arun Valleti's colleagues at Danway Electrical & Mechanical Engineering LLC include Mohammad Arman, James Daniel Dsouza, Vijayan Pillai, Jitendra Chavan, and Baiju Poulose.
How can I contact Arun Valleti?
You can use AeroLeads to view verified contact signals for Arun Valleti at Danway Electrical & Mechanical Engineering LLC, including work email, phone, and LinkedIn data when available.
What schools did Arun Valleti attend?
Arun Valleti holds Bachelor'S Degree, Electrical And Electronics Engineering, First Class from Sri Venkateswara University.
What skills is Arun Valleti known for?
Arun Valleti is listed with skills including Project Engineering, Project Management, Project Planning, Electricity, Electrical Engineering, Construction, High Voltage, and Engineering.
Search by job title, company, industry, location, and seniority. Export verified B2B contact data when you need it.
Start free trial