Arun Kumar R V Email and Phone Number
Heat load and ventilation calculation, submitting technical specifications to customer, studying scope of work, procuring equipment’s as per technical specifications, preparing project schedule , inspecting production of equipment’s, executing hvac job at site with client satisfaction, coordination for inspection as per checklist at site , commissioning of hvac systemPreparing P&ID, D&ID, Equipment drawing, foundation drawing and refrigerant piping layout and getting approval from client.
Climate Changers Technology Solutions Private Limited
View- Website:
- climatechangers.in
- Employees:
- 5
-
Project EngineerClimate Changers Technology Solutions Private LimitedBengaluru, Ka, In -
Project EngineerClimate Changers Technology Solutions Private Limited Nov 2020 - PresentBengaluru, Karnataka, Indiaindustrial refrigeration, integrated cold storage -
Hvac Mechanical EngineerAl Taweq Aldhabi Technical Contracting Jun 2019 - Sep 2019Uae
-
Mechanical Engineer-MepAkkawi Engineering Consulting Oct 2017 - May 2019Uae
-
Project & Design Engineer - HvacKwiks Systems And Service Apr 2016 - Apr 2017Calicut, Kerala• Calculate the design cooling load of proposed building for HVAC and submit to consultant/ client for review & approval.• Prepare HVAC Drawings respect to design requirements and contract requirements with coordination of other disciplines and submit as per the approved schedules to the consultant/ client for review & approval.• Handled responsibilities of developing duct design, pipe design, Equipment selection, preparing technical documents, reviewing supplier design, inspection and approval, cost estimation, bill of materials preparation.• Calculate ventilation rate, pressure drop and head loss through pipe and ventilation systems.• Providing effective planning/scheduling functions on projects in accordance with clients/ company policies, procedures, specifications and project baseline.• Estimates, prepares and assigns the resources such as manpower, materials, equipment, tools, etc., required for all Mechanical and related works prior to execution.• To monitor and control expenses related to project work and ensure organizational forecasts and budgets are met for these expenses.• To ensure safety standards and procedures are implemented and followed in accordance with contract requirements and Company guidelines.• Monitored staff performance and hired supplementary personnel as needed.• Perform the tasks of marketing and selling HVAC equipment as well as provide strategies to expand sales team.
-
Hvac EngineerKerala Refrigeration Dec 2013 - Mar 2016Calicut Area, IndiaStudy of drawing, comparison between drawing and BOQ, MRS preparing, attending weekly progress meeting, follow up with payments, execution of piping work, ducting work, insulation work and electrical work, follow up with clients for doing civil works, getting approval for measurements from clientJob ResponsibilitiesPreparation of Technical specification,BOQ’s & Tender drawings for the projectPreparing Technical data sheet of equipment, Submit and get approval of technical data sheets of equipment from consultantsPump Head Calculations for the selection of chiller pumps by considering complete chilled water supply & return pipe length and all the fitting equivalent length (Bend, Tees, Reducer, Butterfly valves, Balancing valves, NRV, Y Strainer, suction guide, globe valves etc.), also selection of stand by pumpsStudy the project by architectural, structural, elevational, sectional point of view with Beam & column legends & schedulesDesigning & sizing of duct, Chilled water and condenser water piping GPM calculations and Distribution of Chilled water to various FCU & AHU through chilled Water Supply & Return PipeMaking riser drawings for ducting, chilled water and hot water systems Preparation of detailed BOQ for high side & low side and variation statement Comparison between boq and drawingsCoordination with Purchase for timely material ordering Preparing project schedule and executing project at site as per schedule& drawings Installation of chillers,thermal storage and heat pumpsInstallation of Pumps, AHU'S & FCU'SAttending project progress meeting and sending weekly project progress to head officeMaterial requirement sheet preparing as per site situations
Arun Kumar R V Skills
Arun Kumar R V Education Details
-
Mechanical Engineering -
Erode Sengunthar Engineering College64.2%
Frequently Asked Questions about Arun Kumar R V
What company does Arun Kumar R V work for?
Arun Kumar R V works for Climate Changers Technology Solutions Private Limited
What is Arun Kumar R V's role at the current company?
Arun Kumar R V's current role is Project Engineer.
What schools did Arun Kumar R V attend?
Arun Kumar R V attended Anna University, Erode Sengunthar Engineering College.
What skills is Arun Kumar R V known for?
Arun Kumar R V has skills like Costing And Estimation, Project Estimation, Hvac Projects, Pro E, Commissioning, Hvac, Production Planning, Cad, Hvac Engineering, Pipe Design, Engineering, Chiller Systems.
Not the Arun Kumar R V you were looking for?
-
Arun Kumar V R
Chennai -
-
-
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial