Arvind Kumar

Arvind Kumar Email and Phone Number

Assistant Manager-Train Operation & Training Coordinator, Rapid metro(DMRC-HMRTC) @
Arvind Kumar's Location
New Delhi, Delhi, India, India
Arvind Kumar's Contact Details

Arvind Kumar personal email

About Arvind Kumar

Assistant Manager/Train Operation & Safety(O&M) in Rapid Metro having vast experience in Operation(OCC & Train) with a demonstrated history of working in the transportation/Metro rail industry in India & Gulf countries. Skilled in Operations Management, Railway Signaling(ATS & ATP), Railway Systems, Transportation, and Siemens computerized Interlocking(LZB 700M). Operational management including Train, OCC & Depot Control management. • Responsible for reducing Service Affecting Failures thus ensuring the safe, punctual, and passenger comfort train operation.• Responsible for preparation of Failure Analysis Report after scrutiny of incident/accident investigation reports.• Organize mock drills to improve staff knowledge, skill, effectiveness, responsiveness, and behavior training.• Organize refresher training of O&M staff and induction training for newly joined staff.• Impart technical training to Station Controller/Train Operator regarding train driving & awareness training.• Rostering and leave the management of Train drivers.• Responsible for Train operator’s competency training and refresher courses to sharpen their knowledge for fault troubleshooting.• Conduct safety drive to sensitize Train Operators about safe and efficient Train Operation.

Arvind Kumar's Current Company Details
for Rapid Metro Gurgaon (DMRC-HMRTC)

For Rapid Metro Gurgaon (Dmrc-Hmrtc)

Assistant Manager-Train Operation & Training Coordinator, Rapid metro(DMRC-HMRTC)
Arvind Kumar Work Experience Details
  • For Rapid Metro Gurgaon (Dmrc-Hmrtc)
    Assistant Manager-Train Operation & Training, Rapid Metro(Dmrc-Hmrtc)
    For Rapid Metro Gurgaon (Dmrc-Hmrtc) Jan 2021 - Present
    New Delhi, Delhi, India
    • Responsible for reducing in Service Affecting Failures thus ensuring the safe, punctual and passenger comfort train operation.• Looking after of Train Operation (Crew Management) and Depot control operation.• Responsible for preparation of Failure Analysis Report after scrutiny of incident/accident investigation reports.• Organize mock drills to improve staff knowledge, skill, effectiveness, responsiveness and behavior training.• Conduct safety drive to sensitize Train Operators about safe and efficient Train Operation.• Conducting Train Operator’s competency training and refresher courses to sharpen their knowledge for fault troubleshooting.• Roster and leave management of Train drivers.
  • Bechtel Corporation
    Bacs Riyadh Metro
    Bechtel Corporation Jun 2019 - Jan 2021
    Al-Riyadh Governorate, Saudi Arabia
  • Rapid Metro Rail Gurgaon Limited
    Chief Controller
    Rapid Metro Rail Gurgaon Limited Jan 2018 - Jun 2019
    Gurgaon, Haryana, India
  • Rapid Metro Rail Gurgaon Limited
    Train Traffic Controller(Occ)/Depot Controller
    Rapid Metro Rail Gurgaon Limited Oct 2012 - Jan 2018
    Gurgaon, India
    RESPONSIBILITIES DURING OPERATIONAL/TESTING(PROJECT) PHASE Manages smooth real-time Metro operations across the network (including both Depots). Supervise and control the train movement on the main line by utilizing variouscomputerized tools to ensure train adhere to predetermined schedule, monitor themovement of trains on the ATS( Vicos OC 501) console. Liaise with train crew team leader and depot controller to ensure availability of trains andtrain crew to cater for unexpected incidents/events. Direct station Controller/in charge and train operator during incident and emergencies,monitor passenger level at platform via CCTV system and regulate the service to mitigatecapacity problem and overcrowding. Manage and ensure continuous Train-monitoring is carried out effectively to provide thebest possible assistance in case of any deviation or diversion from the normal operationalplan.  Testing and Commissioning of Complete ATS (Automatic train supervision) VICOS OC 501system. Managing the working of Operation Control Centre (OCC) including Time-TableManagement. Fault troubleshooting of Onboard ATO/ATP system and all Rolling Stock failures. Introductory knowledge FTGS and basic Signaling. Permit to Work coordination with Maintenance activities during Operation shutdown (NonRevenuehours). Setting routes for trains manually and Incorporating TSR’s, skip stations, caution Ordersalong with punctuality in train services. As Depot controller coordinate with train controller for train insertion and removal andadditional special train service. As Depot controller prepare weekly train plan for schedule maintenance of Train & itsstabling in Depot/Mainline. Coordination with OCC Chief Controller & Other OCC controllers e.g., Traction powercontroller, Fault Controller and Security Controller during Emergency and Normal conditions. Escalation of incident/accident report OCC Manager/other operation Manager.
  • Reliance Metro(Delhi Metro Airport Express Line)
    Station Controller/Train Operator(Sc/To)
    Reliance Metro(Delhi Metro Airport Express Line) Jan 2010 - Oct 2012
    1. STATION CONTROLLER• Station controller at Back-up Operation control centre along with Interlocking station.• Management of BEMS system at station.• Controlling administration and house-keeping at station level. 2. TRAIN OPERATOR• Train driving in ATP & Non-ATP modes.• Train troubleshooting during revenue hours.• Testing of Rolling stock and Signalling i.e., ATP.

Arvind Kumar Skills

Contract Management Public Transport Railway Light Rail Rolling Stock Rail Metro Transportation Railway Signalling Signalling Commissioning Operations Management Railway Systems Testing Atp Rail Operations Troubleshooting

Arvind Kumar Education Details

Frequently Asked Questions about Arvind Kumar

What company does Arvind Kumar work for?

Arvind Kumar works for For Rapid Metro Gurgaon (Dmrc-Hmrtc)

What is Arvind Kumar's role at the current company?

Arvind Kumar's current role is Assistant Manager-Train Operation & Training Coordinator, Rapid metro(DMRC-HMRTC).

What is Arvind Kumar's email address?

Arvind Kumar's email address is ar****@****ail.com

What schools did Arvind Kumar attend?

Arvind Kumar attended Ambedkar Polytechnic, Bte Delhi, Kendriya Vidyalaya.

What are some of Arvind Kumar's interests?

Arvind Kumar has interest in Economic Empowerment, Civil Rights And Social Action, Education, Disaster And Humanitarian Relief, Health.

What skills is Arvind Kumar known for?

Arvind Kumar has skills like Contract Management, Public Transport, Railway, Light Rail, Rolling Stock, Rail, Metro, Transportation, Railway Signalling, Signalling, Commissioning, Operations Management.

Not the Arvind Kumar you were looking for?

Free Chrome Extension

Find emails, phones & company data instantly

Find verified emails from LinkedIn profiles
Get direct phone numbers & mobile contacts
Access company data & employee information
Works directly on LinkedIn - no copy/paste needed
Get Chrome Extension - Free

Aero Online

Your AI prospecting assistant

Download 750 million emails and 100 million phone numbers

Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.