Graduate Engineer
Current- Currently working on the delivery of the FRP scope for the structural concrete works of the Powerhouse on the Kidston Pumped Storage Hydro Project, a 250MW renewable energy scheme joint venture between McConnell Dowell and John Holland and is a flagship project of the Kidston Clean Energy Hub in Far-North Queensland, utilising an abandoned gold mine with the Wises and Eldridge Pits acting as the upper and lower reservoirs (Max 218m water head) that can generate, store and release renewable energy on demand during peak cycles. - Previously worked on the construction planning and delivery for the pipeline scope of works of the Fitzroy to Gladstone Pipeline Project in Central Queensland, a joint venture between McConnell Dowell and BMD constructing a 117km pipeline that runs from the Lower Fitzroy River in Rockhampton and connects to Gladstone Area Water Board’s existing water network at Yarwun, comprising of a water treatment plant, reservoirs and pump stations along its alignment including Laurel Bank, Alton Downs and Aldoga and addressing the single source water supply risk from Awoonga Dam and enabling long-term water security for the region including supporting Gladstone’s emerging hydrogen and renewables industry with a capacity to transport 30 gigalitres of water per annum from the Fitzroy River to Gladstone.