Ashraf Sayed Pmp Pmi-Acp Email and Phone Number
I have a total of 27 years of full-time work experience, engineering, technical support and construction project management.More of 27 years of experience working at most greatest international companies in the Middle East, like CCIC, Dar Al-Handasah, Saudi Oger & Saudi Bin Laden Group working in Mega Projects with different types (High Rise Buildings, Malls, Hotels, Oil&Gas Plants, Stadium, Academic Buildings, Airports...etc)My duties include preparing/reviewing design & shop drawings, coordinate with all discipline departments(Arch. ,MEP,QC,Planning..), preparing request of information, solving design & site problems with designers & consultants, prepare variation orders, reviewing material submittal and planning schedules.
Quality Plus
View- Website:
- sbg.com.sa
- Employees:
- 10
-
Commercial DirectorQuality PlusCairo, Cairo Governorate, Eg -
Technical ManagerSaudi Binladin Group (Sbg) Oct 2010 - PresentNew King Abdul Aziz International Airport - Jeddah , Saudi ArabiaNew King Abdul Aziz International Airport in Jeddah (From August 2011 until now). -Review and approve all the shop drawings and coordinate with site and other trades. Solving site problems related to technical drawings and issues with designer ATKINS & Dar Al-Handasah. Coordinate with other department as QC, Planning, QS and cost control.-Coordinate all design issues and approval with designers ARUP,ATKINS & Dar and with all subcontractor companies such as, Areen, Bombardier, ThyssenKrupp, Koni, Venderland.-Manage all activities, Tunnels, Roads, Bridges, APM Trains, Steel Structure, and MEP-Technical Manager at Islamic World Clock Project, Top of Tower Development of King Abdul Aziz Endowment of Makkah (From November 2010 until August 2011). -Responsible of all steel structure items (Design, Shop Drawings, Fabrication, delivery & installation). -
Deputy Structural ManagerSaudi Oger Ltd. Mar 2008 - Oct 2010King Abd Allah University For Science And Technology (Kaust), JeddahDeputy Structural Manager at the Saudi Oger Limited (Saudi Arabia)1-Jabl Omar Development Project, Makkah (From May 2009 until October 2010). -Review and approve all the shop drawings and coordinate with site and other trades. Solving site problems related to technical drawings and issues. Coordinate with other department as QC, Planning, QS and cost control.The project land area is 115,000 m2 and total built up area of 1.3 million m2, consisting of 15 high rise towers (40-60m), 1 Musalla (60,000 persons), a power station and all related infrastructure works (roads, public utilities, pedestrian passages, bridges, vehicular and utility tunnel). The project is of an estimated Value of 2.6 billion US$. 2- King Abd Allah University for Science and Technology (KAUST), Jeddah (March 2008 until May 2009). -Solving all site problems related to executing drawings and coordinates with all trades and approves all new MEP reservations required at the poured concrete items. Coordinate with QC department and solve all site and inspection request problems.Designer: HOK consultant New York, USAConsultant: Saudi AramcoThe project located along the red sea on the west coast of Saudi Arabia, north of Jeddah • Total area 6.5 million square foot• Total cost 12 billion Saudi Riyal • Academic buildings 400,000 square meters -
Design ManagerMountain View Group Sep 2007 - Mar 2008Cairo - Egypt- Review the design strategy and concept for all projects.- Coordinate between all consultant designers for all trades.- Review design documents and drawings.- Review client's requirements.- Pricing variations of clients. -
Deputy Civil Construction ManagerConsolidated Contractors International Company Feb 2006 - Aug 2007Khurasaniyah Gas Plant Project - Saudi ArabiaCoordinating of all structure and steel works between Construction Civil Department and Technical office and QC department respecting all Saudi Aramco Specifications. Preparing and checking all IR’s. Preparing Method Statement for all civil activities in site. Checking and reviewing all site civil activities such as formwork, reinforcement, levels supports of steel pipe racks. Preparing and manufacturing the anchor bolts. -
Senior Structural EngineerDar Al Handasah Aug 2004 - Feb 2006King Abdul Aziz Endowment Of Makkah Holy Haram Project -EgyptReviewing and coordinating of the workshop drawings with other trades as per ACI code.DKAAE project is a residential and commercial complex , 772000m2 in built up area on a site of 27000 m2 and compromising 4 residential towers 302000 m2 a five star hotel and a podium housing a shopping mall, restaurants and food courts, a large prayer area, luxuries studios over looking the Holy Haram. All towers are of 2 basements, ground, 2 mezzanine and 60 typical floors. -
Senior Technical Office EngineerConsolidated Contractors International Company Oct 2003 - Aug 2004Khalifa Stadium Sports Hall Project - Doha-QatarRevising contract items in tender documents, bill of quantities, drawings, detailed drawings and specifications.Preparing & reviewing of shop drawings for formwork & reinforcement details and bar binding schedule as per British Building Design Code BS 8110 -97.Preparing request of information and solving site problems. -
Senior Technical Office Engineer & Variations EngineerConsolidated Contractors International Company Sep 1999 - Oct 2003Golden Pyramids Plaza Project - Cairo,Egypt-Golden Pyramids Plaza Project (five stars hotel & commercial center) The golden pyramid plaza project (area 115217 m2) consists of: -Commercial centers 12 zones, premedical shape.-two hotel buildings 18 floor -two hotel buildings 4 floor -Eight hotels served apartment buildings 17 floors.-Two furnished apartment buildings 17 floor.-Swimming pools and entertainment parks. -Utility and maintenance buildings. *From, September 1999 to July 2001 Senior Technical Office Engineer (Engineering Department for workshop drawing & details)- Revising contract items in tender documents, bill of quantities, drawings, detailed drawings and specifications.-Preparing & reviewing of shop drawings for formwork & reinforcement details and bar binding schedule as per British Standard.- Following the steel structure works for roof cladding with Mero Company.- Preparing and arising request for information (RFI) and drawing field changes (DFC) for Engineer’s approval.*From, July 2001 till October 2003 Senior Variation Engineer (Quantity Surveyors & Variation Department)-Studying the Project’s history as per the FIDIC Contract Conditions.-Surveying the Variations occurred due to Consultants’ / Owners’ Instructions.-Estimating the costs for each variation order and elaborating the new rates.-Issuing Contractual Claims.-Reviewing and negotiating the Variations with the Project Managers (ACE, Bechtel & MB).-Monitoring the approval and payment for the variations. -
Junior Structural EngineerTalaat Moustafa Group Holding Dec 1997 - Aug 1999City Stars Project Nasr City CairoJunior Structural Engineer (Engineering Department for workshop drawing & details) - Revising contract items in tender documents, bill of quantities, drawings, detailed drawings and specifications. - Preparing & reviewing of shop drawings for formwork & reinforcement details and bar binding schedule as per British Standard code.
Ashraf Sayed Pmp Pmi-Acp Education Details
-
Excellent -
Very Good With Honours Degree
Frequently Asked Questions about Ashraf Sayed Pmp Pmi-Acp
What company does Ashraf Sayed Pmp Pmi-Acp work for?
Ashraf Sayed Pmp Pmi-Acp works for Quality Plus
What is Ashraf Sayed Pmp Pmi-Acp's role at the current company?
Ashraf Sayed Pmp Pmi-Acp's current role is Commercial Director.
What schools did Ashraf Sayed Pmp Pmi-Acp attend?
Ashraf Sayed Pmp Pmi-Acp attended The American University In Cairo, Ain Shams University.
Who are Ashraf Sayed Pmp Pmi-Acp's colleagues?
Ashraf Sayed Pmp Pmi-Acp's colleagues are Qasim Waris, Khalid Tanweer, Mohammad A., Katz Carlota, Abd El Sattar Elwaziry, Waseem Malik, Chiragh Uddin.
Free Chrome Extension
Find emails, phones & company data instantly
Aero Online
Your AI prospecting assistant
Select data to include:
0 records × $0.02 per record
Download 750 million emails and 100 million phone numbers
Access emails and phone numbers of over 750 million business users. Instantly download verified profiles using 20+ filters, including location, job title, company, function, and industry.
Start your free trial