Qa&Qc E&I Supervisor
HKN SARSANG BLOCK - WELLSITE BASED PRODUCTION FACILITYThis Project will create a reliable energy supply for Turkey, South and southeast Europe by directly connected Russian giant natural gas reserves to Turkey distribution network. Half of 31.5 billion cubic meters of gas will be used in Turkey, the other half will be transferred to Europe• Attending daily meetings and checked daily, weekly and monthly construction activities.• Preparation all construction and Quality documents and Review All Construction QA/QC and Pre-com / comm Documents like QCP, ITP and method Statements etc.• Preparation all cable drum management and all cable route. (E&I)• Preparation all As-Built drawing (E&I)